عرض أول 120 صف من آخر عملية استيراد. المرحلة التالية تحويل الأعمدة دي إلى جداول وتقارير فعلية.
رجوع للشيتات| Row | C1 | C2 | C3 | C4 | C5 | C6 | C7 | C8 | C9 | C10 | C11 | C12 | C13 | C14 | C15 | C16 | C17 | C18 | C19 | C20 | C21 | C22 | C23 | C24 | C25 | C26 | C27 | C28 | C29 | C30 | C31 | C32 | C33 | C34 | C35 | C36 | C37 | C38 | C39 | C40 | C41 | C42 | C43 | C44 | C45 | C46 | C47 | C48 | C49 | C50 | C51 | C52 | C53 | C54 | C55 | C56 | C57 | C58 | C59 | C60 | C61 | C62 | C63 | C64 | C65 | C66 | C67 | C68 | C69 | C70 | C71 | C72 | C73 | C74 | C75 | C76 | C77 | C78 | C79 | C80 | C81 | C82 | C83 | C84 | C85 | C86 | C87 | C88 | C89 | C90 | C91 | C92 | C93 | C94 | C95 | C96 | C97 | C98 | C99 | C100 | C101 | C102 | C103 | C104 | C105 | C106 | C107 | C108 | C109 | C110 | C111 | C112 | C113 | C114 | C115 | C116 | C117 | C118 | C119 | C120 | C121 | C122 | C123 | C124 | C125 | C126 | C127 | C128 | C129 | C130 | C131 | C132 | C133 | C134 | C135 | C136 | C137 | C138 | C139 | C140 | C141 | C142 | C143 | C144 | C145 | C146 | C147 | C148 | C149 | C150 | C151 | C152 | C153 | C154 | C155 | C156 | C157 | C158 | C159 | C160 | C161 | C162 | C163 | C164 | C165 | C166 | C167 | C168 | C169 | C170 | C171 | C172 | C173 | C174 | C175 | C176 | C177 | C178 | C179 | C180 | C181 | C182 | C183 | C184 | C185 | C186 | C187 | C188 | C189 | C190 | C191 | C192 | C193 | C194 | C195 | C196 | C197 | C198 | C199 | C200 | C201 | C202 | C203 | C204 | C205 | C206 | C207 | C208 | C209 | C210 | C211 | C212 | C213 | C214 | C215 | C216 | C217 | C218 | C219 | C220 | C221 | C222 | C223 | C224 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 46023 | عدد | قيمة(مليون) | 44926 | 44957 | %إنجاز فعلي | الإنجاز المخطط | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 2 | Report Date | 46142 | صرف | 31 | استلام ابتدائي | 1748.4949347699994 | 67 | Time Overrun | A01 | A02 | A03 | A04 | A05 | A06 | P01 | P02 | P03 | P04 | P05 | P06 | 12 | عدد المشاريع المنقولة | 409 | Good Progress | 23 | المشاريع الاستراتيجية | 22.83 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 3 | 36 | 01-02-2020 | 128 | Low Progress | 23 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 4 | Project Number | رقم العقد التشغيلي | المشروع | القطاع | الجهه المسئولة | مصدر التمويل | تصنيف المشروع | تصنيف المشروع العام | بداية المشروع | نهاية العقد | المدة المنقضية | قيمة العقد المعدلة | قيمة المشروع بالمليون ريال | قيمة العقد المعدلة مع الضريبة | قيمة العقد المعدلة مع الضريبة(مليون) | قيمة الاعمال المنفذة وقت السحب | إجمالي قيمة الأعمال | هل المشروع ضمن خطة إنجاز 2026 | وضع خطة إنجاز الحالي | التاريخ المخطط للإنجاز | تاريخ الاستلام الفعلي | هل تاريخ الاستلام متقدم عن الخطة | التصنيف حسب الدخول بالتعثر | التصنيف الفرعي حسب المشاريع المتوقع تعثرها | حالة العقد | وضع المشروع | المقاول | الإستشاري | حالة عقد الإستشاري | تاريخ نهاية عقد الإستشاري | تصنيف أسباب التعثر | درجة إحتمالية عدم الخروج | التاريخ المتوقع للخروج من التعثر | حالة الخطة | النطاق | ProjectTrend - AC | Trend-Plan | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Time Overrun | التصنيف حسب الدخول بالتعثرOriginal | السبب الرئيسي للتعثر | السب المختصر للتعثر | التصنيف الأساسي | مخاطر التأخر / التعثر المحتمل | الإجراءات المتخذة تفصيلي | التوصيات | أثر المشروع وإرتباطه مع مشاريع أخرى | المعالجة الأساسية | تصنيف المعالجة | تصنيف الإجراءات المطلوبة | تاريخ الإيقاف | السبب المختصر للإيقاف | سبب الإيقاف | الإجراءات المتخذة | الإجراء المطلوب | أثروإرتباط المشروع مع مشاريع أخرى | تاريخ الإستئناف المتوقع | 01-2024 | 02-2024 | 03-2024 | 04-2024 | 05-2024 | 06-2024 | 07-2024 | 08-2024 | 09-2024 | 10-2024 | 11-2024 | 12-2024 | 01-2025 | 02-2025 | 03-2025 | 04-2025 | 05-2025 | 06-2025 | 07-2025 | 08-2025 | 09-2025 | 10-2025 | 11-2025 | 12-2025 | 01-2026 | 02-2026 | 03-2026 | 04-2026 | Jan-24 | Feb-24 | Mar-24 | Apr-24 | May-24 | Jun-24 | Jul-24 | Aug-24 | Sep-24 | Oct-24 | Nov-24 | Dec-24 | Jan-25 | Feb-25 | Mar-25 | Apr-25 | May-25 | Jun-25 | Jul-25 | Aug-25 | Sep-25 | Oct-25 | Nov-25 | Dec-25 | Jan-26 | Feb-26 | Mar-26 | Apr-26 | هدف المشروع | [الاحياء و المناطق المخدومة] | [محطة معالجة صرف صحي م3/يوم] | [محطة تنقية مياه م3/يوم] | عدد محطات الضخ | [محطة ضخ / رفع م3/يوم] | عدد الخزانات | [خزانات-تشغيلية م3] | [شبكات مياه] | [شبكات صرف صحي] | [خط ناقل مياه] | [خط ناقل صرف صحي] | VO No. | رقم المعاملة | حالة المعاملة | الإدارة الرئيسية | الإدارة الفرعية | تحديث الإجراء طبقاً لإفادة القطاعات 06-07-2023 | حالة متابعة امر التغيير | ملخص الإفادة | نسبة الاستلام الابتدائى الجزئى | نسبة الاعمال المستفاد منها | قيمة الاعمال المستفاد منها | تاريخ الاستفادة بالاعمال | BOD | ملاحظة خطة الإنجاز | المشاريع الاستراتيجية 2 | المشاريع الاستراتيجية | منقول من الوزارة | التصنيف للمشاريع المنقولة من الوزارة | تصنيف محطات المعالجة | PV-12 Months | AC-12 Months | Variance 12 Months | Project Progress | AC-Month1 | AC-Month2 | AC-Month3 | AC-Month4 | AC-Month5 | AC-Month6 | AC-Month7 | AC-Month8 | AC-Month9 | AC-Month10 | AC-Month11 | AC-Month12 | AC% Avg. 12 Month | Avg. Cost / Month SAR | Project Duration Days | Elapsed Time | Duration Remaining (Days) | Duration Remaining (Month) | Duration Remaining% | Budget Remaining % | Budget Remaining Value (SAR) | (TCPI) Budget Remaining / Month | Budget Remaining with VAT Value (SAR) | Budget Remaining with VAT / Month | Remaining Rates Rrgard to Elapsed Time / Day | Remaining Rates Rrgard to Elapsed Time/Month | Work Value/day SAR | TCPI | (Budg%)-(Dura%) | تصنيف الحزمة | مقترح عجز السيولة | استبعاد من الدراسة | مدة التمديد المقترح يوم | مشاريع الدراسة | قائمة التمديد النهائية | AC Value MSAR | PV Value MSAR | SV MSAR | SV% | هل بدء المشروع في 2026 | تاريخ توقيع العقد | Project Site Handover-Contract | Awarded Date | Project Site Handover-Awarded | Sign Contract 15 Days | Award Contract 60 Days | Project Site Handover KPI | Forecasted Cashflow 2026 | Forecasted Cashflow 2027 | Forecasted Cashflow 2028 | Forecasted Cashflow 2029 | Forecasted Cashflow 2030 | Total Forecasted Cashflow | التدفقات النقدية المخفضة لعام 2026 وفقا للمقترح | Paid 31-10-2025 | Paid % | VAC% Paid-AC% | Elapsed/Work Remaining | Expected AC% to Dec.2025 | Expected SV% to Dec.2025 | Expected Warning | Schedule Var.% | Variance 5% | Warning Indicator | مصدر تمويل المشاريع |
| 5 | 1211 | 04/13/2/12/0086/1 | مشروع إنشاء خطوط رئيسية صرف صحي ومحطة ضخ بمحافظة عيون الجواء | الشمالي | منطقة القصيم | عامة | صرف | خطوط وشبكات | 41987 | 43951 | 2.115580448065173 | 21613025 | 21.613025 | 22836701.969999999 | 22.83670197 | 0 | 22.83670197 | لا | مسحوب | مسحوب | شركة الوسط الهندسى للمقاولات | شركة فيشتنرمهندسون استشاريون | جاري | 47439 | 0 | 2.0702647657841142 | 2.084521384928717 | 2.1003054989816698 | 2.115580448065173 | 2.1313645621181263 | 2.1466395112016294 | 2.1624236252545823 | 2.1782077393075356 | 2.1934826883910388 | 2.2092668024439917 | 2.2245417515274948 | 2.2403258655804481 | Time Overrun | ضعف آداء المقاول | ضعف آداء المقاول | تم إرسال خطابات وعقد عدد من الإجتماعات للمتابعة مع المقاول والموردين وذلك لدفع العمل تم عقد إجتماع مع رئيس مجلس إدارة المقاول وتم الاتفاق على حل جميع التحديات التي تواجه المشروع. | جاري تجديد إصدار الإنذار النهائي | تكثيف الجهود مع المقاول لخروج المشروع من التعثر، مع متابعة الإجراءات النظامية بسبب ضعف اداء مقاول | تم عقد إجتماع مع رئيس مجلس إدارة المقاول وتم الاتفاق على حل جميع التحديات التي تواجه المشروع. | 0 | 0 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | محافظة عيون الجواء | 0 | 0 | 0 | 13650 | 0 | 0 | 0 | 0 | 0 | 6841 | Ok | المشاريع المنقولة المسحوبة | 0 | 0 | 0 | Good Progress | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1964 | 2.115580448065173 | -2190.9999999999995 | -73.033333333333317 | -1.115580448065173 | 0.08 | 1729042 | -23674.696485623008 | 1826936.1575999998 | -25015.100286627112 | -3.6513007759014156E-5 | -1.0953902327704246E-3 | -833.83667622090377 | -1.1955804480651731 | ميزانية عامة | 21.009765812400001 | 22.83670197 | 1.8269361575999987 | 0.92 | No | 41784 | Out | 41725 | Out | 203 | 262 | No | 22.83670197 | 0 | 0 | 0 | 0 | 22.83670197 | 0 | 0 | 0.92 | 1.115580448065173 | 92 | 8 | Troubled | 8 | Delayed | Troubled | ميزانية عامة | |||||||||||||||||||||||||||||||||||||||||||||||
| 6 | AP1038-13 | 26/23/1/03/0011/1 | إتفاقية الخدمات الهندسيةالاستشاريةلإعدادالدراسات والتصاميم لمشاريع مكةالمكرمه و المشاعر المقدسه ضمن الحزمة الاولى بالقطاع الغربي | الغربي | وحدة عمل مكة | مشاريع الحزمة الأولى | استشاري | تصميم | 45334 | 45881 | 1.4771480804387569 | 154213500 | 154.21350000000001 | 177345525 | 177.34552500000001 | 0 | 177.34552500000001 | لا | تحت التنفيذ | استشاري | فرع شركة أياسا انخيريا إي اركيتوركورا اس ايه | 0 | إتفاقية | 1.3144424131627057 | 1.3656307129798904 | 1.4223034734917732 | 1.4771480804387569 | 1.5338208409506398 | 1.5886654478976234 | 1.6453382084095065 | 1.7020109689213894 | 1.756855575868373 | 1.8135283363802559 | 1.8683729433272396 | 1.9250457038391224 | Time Overrun | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 88 | 98.71 | 98.71 | 98.71 | 98.71 | 98.71 | 44.86 | 44.86 | 44.86 | 44.86 | 44.86 | 0 | 0 | 0 | 0 | 31.078610603290674 | 33.820840950639855 | 42.230347349177336 | 47.897623400365632 | 53.564899451553927 | 59.232175502742237 | 0 | 0 | 0 | 0 | 0 | 90.72 | 44.77 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | استشاري عالمي تصميم | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | مشاريع المشاعر | No | 46.435100548446073 | 98.71 | -52.274899451553921 | Good Progress | 0 | 0 | 88 | 10.709999999999994 | 0 | 0 | 0 | 0 | -53.849999999999994 | 0 | 0 | 0 | 3.7383333333333333 | 5.7650146749999998 | 547 | 1.4771480804387569 | -261 | -8.6999999999999993 | -0.47714808043875689 | 0.5514 | 85033323.900000006 | -9773945.2758620698 | 97788322.484999999 | -11240037.06724138 | -2.1126436781609193E-3 | -6.3379310344827591E-2 | -374667.90224137926 | -1.0285480804387568 | المشاريع الاستراتيجية | نعم | 79.557202515 | 177.34552500000001 | 97.788322485000009 | 0.4486 | No | 45320 | within time | 45281 | within time | 14 | 53 | Within Time | 57.650146749999998 | 111.14676325000001 | 0 | 0 | 0 | 168.79691 | 24.69651 | 0.1601449289459094 | 0.98868332621025945 | 0.47714808043875689 | 109.925 | -9.9249999999999972 | Troubled | 55.14 | Troubled | Troubled | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 7 | 615 | 26/20/2/08/0004/1 | انشاء خزان حديدي سعة 3000م3 واستبدال خزانات الفيبرجلاس بمشعر منى | الغربي | وحدة عمل مكة | عامة | مياه | خزانات | 44031 | 44366 | 6.3014925373134325 | 5800000 | 5.8 | 6670000 | 6.67 | 0 | 6.67 | لا | ايقاف كلي | ايقاف كلي | شركة وشنه للمقاولات | شركة بيت الخبرة للاستشارات الهندسية | جاري | 46985 | 0 | 6.035820895522388 | 6.1194029850746272 | 6.2119402985074625 | 6.3014925373134325 | 6.3940298507462687 | 6.4835820895522387 | 6.5761194029850749 | 6.6686567164179102 | 6.7582089552238802 | 6.8507462686567164 | 6.9402985074626864 | 7.0328358208955226 | Time Overrun | 44319 | Permissions | 80 | 80 | 80 | 80 | 80 | 80 | 80 | 80 | 80 | 80 | 80 | 80 | 80 | 80 | 80 | 80 | 80 | 80 | 80 | 80 | 80 | 80 | 80 | 80 | 80 | 80 | 80 | 80 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | استبدال الخزانات الفايبر جلاس القائمة بخزان حديدي سعة 3000 متر مكعب | مشعر منى - مجر الكبش | 0 | 0 | 0 | 0 | 0 | 3000 | 0 | 0 | 0 | 0 | مشاريع المشاعر | No | 0 | 0 | 0 | Good Progress | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 335 | 6.3014925373134325 | -1776 | -59.2 | -5.3014925373134325 | 0.2 | 1160000 | -19594.594594594593 | 1334000 | -22533.783783783783 | -1.1261261261261261E-4 | -3.3783783783783786E-3 | -751.12612612612611 | 5.723577235772357E-3 | -5.5014925373134327 | ميزانية عامة | 5.3360000000000003 | 6.67 | 1.3339999999999996 | 0.8 | No | 44023 | within time | 43857 | Out | 8 | 174 | Within Time | 0 | 6.67 | 0 | 0 | 0 | 6.67 | 0 | 0 | 0.8 | 5.3014925373134325 | 80 | 20 | Troubled | 20 | Delayed | SV | ميزانية عامة | |||||||||||||||||||||||||||||||||||||||||||||||||||
| 8 | NA-00179 | 12/25/2/1/NA-00179/1 | مشروع استكمال الطريق الدولي بابوالعشر بمحافظة الدرب | الجنوبي | منطقة جازان | على حساب جهات أخرى ( حكومية / خاصة) | مياه | خطوط وشبكات | 45848 | 46120 | 1.0808823529411764 | 5055100 | 5.0551000000000004 | 5813365 | 5.8133650000000001 | 0 | 5.8133650000000001 | نعم | منجز متقدم | 46203 | 46084 | نعم | ضمن المتعثر خلال العام 2026 | استلام ابتدائي | استلام ابتدائي | شركة العرض الانشائي للمقاولات شركة شخص واحد | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | ضعف السيولة | تم معالجته | 0.75367647058823528 | 0.85661764705882348 | 0.97058823529411764 | 1.0808823529411764 | 1.1948529411764706 | 1.3051470588235294 | 1.4191176470588236 | 1.5330882352941178 | 1.6433823529411764 | 1.7573529411764706 | 1.8676470588235294 | 1.9816176470588236 | Null | متوقع تعثره (مدة منقضية) | 0 | 0 | 0 | 24.23 | 63.14 | 0 | 65.819999999999993 | 65.819999999999993 | 65.94 | 65.94 | 65.94 | 65.94 | 0 | 1.81 | 10.65 | 0 | 45.33 | 45.33 | 84.38 | 84.38 | 94.96 | 94.96 | 0 | 0 | 0 | 4400 | ضمن الخطة متقدم | No | 0 | 0 | 0 | Good Progress | 0 | 0 | 0 | 0 | 24.23 | 38.909999999999997 | -63.14 | 65.819999999999993 | 0 | 0.12000000000000455 | 0 | 0 | 5.4950000000000001 | 0.27777774500000002 | 272 | 1.0808823529411764 | -21.999999999999982 | -0.73333333333333273 | -8.0882352941176405E-2 | 0.34060000000000001 | 1721767.06 | -2347864.1727272747 | 1980032.1189999999 | -2700043.7986363657 | -1.5481818181818196E-2 | -0.46445454545454584 | -90001.459954545528 | 1.0812069767441861E-2 | -0.42148235294117642 | أخرى | نعم | 3.833332881 | 5.5203714039999996 | 1.6870385229999996 | 0.7098000000000001 | No | 45834 | within time | 45790 | within time | 14 | 58 | Within Time | 2.7777774500000003 | 3.0355875499999998 | 0 | 0 | 0 | 5.8133650000000001 | 3.1635710000000001 | 0.62581768906648727 | 0.66234507262716102 | 0.62758235294117637 | 82.304999999999993 | -36.974999999999994 | R | 29.02 | Troubled | Troubled | أخرى | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 9 | AP1038-12 | 25/23/1/03/0021/1 | اتفاقية الخدمات الهندسية الاستشارية لإعداد الدراسات والتصاميم لمشاريع المياه والصرف الصحي بالقطاع الغربي عقد (2) | الغربي | وحدة عمل جدة | مشاريع الحزمة الأولى | استشاري | تصميم | 45342 | 46438 | 0.72992700729927007 | 117492973.88 | 117.49297387999999 | 135116919.96000001 | 135.11691996000002 | 0 | 135.11691996000002 | لا | تحت التنفيذ | استشاري | شركة أيدوم اركيتكتشر للاستشارات الهندسية | 0 | إتفاقية | 0.64872262773722633 | 0.6742700729927007 | 0.70255474452554745 | 0.72992700729927007 | 0.75821167883211682 | 0.78558394160583944 | 0.81386861313868608 | 0.84215328467153283 | 0.86952554744525545 | 0.8978102189781022 | 0.92518248175182483 | 0.95346715328467158 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 83.4 | 91.6 | 91.6 | 91.6 | 91.6 | 91.6 | 93.29 | 93.29 | 93.29 | 93.29 | 93.29 | 0 | 0 | 0 | 0 | 0 | 0 | 14.78102189781022 | 16.149635036496353 | 20.346715328467152 | 23.175182481751825 | 26.003649635036496 | 28.832116788321166 | 0 | 0 | 0 | 0 | 0 | 42.4 | 48.15 | 50.97 | 53.71 | 56.63 | 59.18 | 62.12 | 64.92 | 64.92 | 70.28 | 70.28 | استشاري عالمي تصميم | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 30.626350364963507 | 91.6 | -60.973649635036487 | Good Progress | 0 | 0 | 83.4 | 8.1999999999999886 | 0 | 0 | 0 | 0 | 1.6900000000000119 | 0 | 0 | 0 | 7.7741666666666669 | 9.1340996110543333 | 1096 | 0.72992700729927007 | 296 | 9.8666666666666671 | 0.27007299270072993 | 6.7099999999999937E-2 | 7883778.5473479927 | 799031.60952851269 | 9066345.3293159921 | 918886.35094418831 | 2.2668918918918897E-4 | 6.800675675675669E-3 | 30629.545031472946 | -2.9487729729729701E-3 | 0.20297299270072999 | المشاريع الاستراتيجية | نعم | 126.05057463068403 | 94.960171347888007 | -31.090403282796018 | 1.2301000000000002 | No | 45340 | within time | 45313 | within time | 2 | 29 | Within Time | 91.34099611054333 | 28.953224849456689 | 0 | 0 | 0 | 120.29422096000002 | 38.631635000000003 | 0.32879953348917657 | 0.91902173919112451 | 0.13812700729927008 | 114.9225 | -52.802500000000002 | R | -23.01 | Regular | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||
| 10 | AP251 | 3/25/2/2/AP251/1 | تنفيذ مشاريع إيصال خدمات الصرف الصحي لمخططات الإسكان بالمدينة المنورة ( 4 مواقع ) | الشمالي الغربي | منطقة المدينة المنورة | مشاريع الحزمة الاولى | صرف | خطوط وشبكات | 45939 | 47309 | 0.14817518248175182 | 62999999 | 62.999999000000003 | 72449998.849999994 | 72.44999885 | 0 | 72.44999885 | لا | تحت التنفيذ | منتظم | شركة آشي وبشناق للمقاولات المحدودة | شركة فيوتشر كونسلت للاستشارات الهندسية | جاري | 46985 | 0 | 8.3211678832116789E-2 | 0.10364963503649635 | 0.12627737226277372 | 0.14817518248175182 | 0.17080291970802919 | 0.19270072992700729 | 0.21532846715328466 | 0.23795620437956205 | 0.25985401459854013 | 0.2824817518248175 | 0.30437956204379563 | 0.32700729927007299 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2.33 | 2.33 | 0 | 0 | 0 | 0.86 | 0.86 | 3.39 | 3.39 | No | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2.33 | 0.19416666666666668 | 0.12232499805833336 | 1370 | 0.14817518248175182 | 1167 | 38.9 | 0.85182481751824812 | 1 | 62999999 | 1619537.2493573264 | 72449998.849999994 | 1862467.8367609254 | 8.5689802913453304E-4 | 2.570694087403599E-2 | 62082.261225364178 | 1.1739502999143104E-2 | -0.14817518248175188 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 275 | نعم | نعم | 1.6880849732050001 | 2.4560549610150004 | 0.76796998781000037 | 0.98939999999999995 | No | 45935 | within time | 45881 | within time | 4 | 58 | Within Time | 0 | 32.602499482500001 | 39.847499367499999 | 0 | 0 | 72.44999885 | 4543364.7056999998 | 0 | 0 | 0 | 0.14817518248175182 | 0.58250000000000002 | -0.58250000000000002 | R | 1.06 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 11 | P413 | 5/25/2/1/P413/1 | مشروع شبكات مياه غرب حي الثقبة ومناطق متفرقه بالخبر | الشرقي | المنطقة الشرقية | مشاريع الحزمة الاولى | مياه | خطوط وشبكات | 45932 | 47026 | 0.19195612431444242 | 101962803.73 | 101.96280373 | 117257224.29000001 | 117.25722429000001 | 0 | 117.25722429000001 | لا | تحت التنفيذ | منتظم | شركة نبراس المتحدة للمقاولات | شركة الخدمات الهندسية والفنية للإستشارات المهنية | جاري | 46996 | 0 | 0.11060329067641682 | 0.13619744058500913 | 0.16453382084095064 | 0.19195612431444242 | 0.22029250457038391 | 0.24771480804387569 | 0.27605118829981717 | 0.30438756855575866 | 0.33180987202925044 | 0.36014625228519198 | 0.38756855575868371 | 0.41590493601462525 | Null | 0 | 0 | 0 | 0 | 1.53 | 3.18 | 3.18 | 5.5 | 5.5 | 0 | 0 | 0.83 | 1.55 | 1.55 | 5.84 | 5.84 | No | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1.53 | 1.6500000000000001 | 0 | 2.3199999999999998 | 0.45833333333333331 | 0.46732951709583331 | 1094 | 0.19195612431444242 | 884 | 29.466666666666665 | 0.80804387568555758 | 0.96819999999999995 | 98720386.571385995 | 3350239.3632823303 | 113528444.557578 | 3852775.2677911087 | 1.0952488687782805E-3 | 3.2857466063348419E-2 | 128425.84225970363 | 1.198202262443439E-2 | -0.16015612431444237 | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 365 | نعم | نعم | 6.4491473359500002 | 6.847821898536 | 0.39867456258599976 | 0.99660000000000004 | No | 45888 | Out | 45908 | within time | 44 | 24 | Within Time | 2.7020142988450004 | 113.12438899115502 | 0 | 0 | 0 | 115.82640329000002 | 14891667.484766498 | 0 | 0 | 0 | 0.19195612431444242 | 1.375 | -0.54500000000000004 | R | 0.34 | Regular | R | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 12 | OA1272 | 8/25/1/2/OA1272/1 | مشروع استكمال خدمات استشارية لاعداد خطة استراتيجية للمياه والصرف الصحي وتوزيع المياه للقطاع الجنوبي | الجنوبي | منطقة عسير | مبادرات | استشاري | تصميم | 45677 | 45981 | 1.5296052631578947 | 8820000 | 8.82 | 10143000 | 10.143000000000001 | 0 | 10.143000000000001 | لا | تحت التنفيذ | استشاري | فرع شركة الاتحاد الهندسي السعودية للاستشارات الهندسية (خطيب وعلمي) | 0 | 1.236842105263158 | 1.3289473684210527 | 1.430921052631579 | 1.5296052631578947 | 1.631578947368421 | 1.7302631578947369 | 1.8322368421052631 | 1.9342105263157894 | 2.0328947368421053 | 2.1348684210526314 | 2.2335526315789473 | 2.3355263157894739 | Time Overrun | 0 | 0 | 0 | 25.57 | 68.27 | 85.42 | 92.66 | 95.77 | 95.77 | 95.77 | 95.77 | 95.77 | 95.77 | 95.77 | 0 | 52.97 | 62.92 | 83.63 | 92.85 | 97.76 | 100 | 100 | 100 | 100 | 100 | 100 | No | 97.76 | 95.77 | 1.9900000000000091 | Good Progress | 0 | 0 | 25.57 | 42.699999999999996 | 17.150000000000006 | 7.2399999999999949 | 3.1099999999999994 | 0 | 0 | 0 | 0 | 0 | 7.980833333333333 | 0.70390950000000008 | 304 | 1.5296052631578947 | -161 | -5.3666666666666663 | -0.52960526315789469 | 4.2300000000000039E-2 | 373086.00000000035 | -69519.130434782681 | 429048.90000000037 | -79947.000000000073 | -2.6273291925465862E-4 | -7.881987577639759E-3 | -2664.9000000000024 | 6.2621671018276814E-4 | -0.57190526315789469 | مشاريع التحول الوطني | نعم | 9.7139511000000009 | 10.143000000000001 | 0.42904889999999973 | 0.9577 | No | 45620 | Out | 45620 | within time | 57 | 57 | Within Time | 7.0390950000000005 | 3.1039050000000001 | 0 | 0 | 0 | 10.143000000000001 | 6.2256369999999999 | 0.70585453514739227 | 0.96450802362662902 | 0.52960526315789469 | 119.71249999999999 | -19.712499999999991 | Troubled | 4.2300000000000004 | Regular | Troubled | مشاريع التحول الوطني | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 13 | AP1038-7 | 04/23/1/16/0007/1 | اتفاقية الخدمات الهندسية الاستشارية لإعداد الدراسات والتصاميم لمشاريع المياه والصرف الصحي بالقطاع الشمالي عقد (1) | الشمالي | منطقة القصيم | مشاريع الحزمة الأولى | استشاري | تصميم | 45314 | 46410 | 0.75547445255474455 | 91418560.870000005 | 91.418560870000007 | 105131345 | 105.131345 | 0 | 105.131345 | لا | تحت التنفيذ | استشاري | فرع شركة أياسا انخيريا إي اركيتوركورا اس ايه | 0 | إتفاقية | 0.6742700729927007 | 0.69981751824817517 | 0.72810218978102192 | 0.75547445255474455 | 0.78375912408759119 | 0.81113138686131392 | 0.83941605839416056 | 0.86770072992700731 | 0.89507299270072993 | 0.92335766423357668 | 0.9507299270072993 | 0.97901459854014594 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 8 | 8 | 8 | 8 | 8 | 0 | 0 | 0 | 0 | 0 | 43.34 | 59.14 | 60.13 | 61.15 | 60.82 | 61.71 | 62.48 | 62.48 | 62.48 | 62.48 | 62.48 | 0 | 0 | 0 | 0 | 0 | 0 | 17.335766423357665 | 20 | 20 | 20 | 20 | 20 | 0 | 0 | 0 | 0 | 0 | 47.42 | 83.73 | 85.36 | 87.16 | 88.47 | 89.28 | 90.04 | 90.58 | 90.58 | 91.4 | 91.4 | استشاري عالمي تصميم | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 68.47 | 52.82 | 15.649999999999999 | Low Progress | 0 | 0 | 43.34 | 15.799999999999997 | 0.99000000000000199 | 1.019999999999996 | -0.32999999999999829 | 0.89000000000000057 | 0.76999999999999602 | 0 | 0 | 0 | 5.2066666666666661 | 4.7598597359646666 | 1096 | 0.75547445255474455 | 268 | 8.9333333333333336 | 0.24452554744525545 | 0.37520000000000003 | 34300244.038424008 | 3839579.5565400007 | 39445280.644000001 | 4415516.49 | 1.4000000000000002E-3 | 4.2000000000000003E-2 | 147183.88300000003 | 0.35804800000000009 | -0.13067445255474458 | المشاريع الاستراتيجية | نعم | 65.686064356000003 | 96.090049329999999 | 30.403984973999997 | 0.7108000000000001 | No | 45294 | Out | 45259 | within time | 20 | 55 | Within Time | 47.598597359646668 | 48.78834164035333 | 0 | 0 | 0 | 96.386938999999998 | 25.347695000000002 | 0.27727077257369209 | 0.61881579533653763 | -0.13732554744525549 | 77.33 | 12.710000000000008 | R | 28.92 | Troubled | Troubled | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||
| 14 | 1485 | 12/10/2/01/0058/1 | مشروع شبكات مياه الشرب وخزانات بقرى هروب بمنطقة جازان | الجنوبي | منطقة جازان | عامة | مياه | خطوط وشبكات | 40862 | 44871 | 1.3170366674981293 | 96124085 | 96.124084999999994 | 104705658.3 | 104.7056583 | 0 | 104.7056583 | لا | مسحوب | مسحوب | مؤسسة الحسن للمقاولات . لصاحبها محمد حسن سعيد القحطاني بالتضامن مع شركة سامد المحدودة | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | 0 | 1.2948366176103767 | 1.3018209029683212 | 1.3095535046146172 | 1.3170366674981293 | 1.3247692691444251 | 1.3322524320279372 | 1.3399850336742329 | 1.3477176353205289 | 1.3552007982040408 | 1.3629333998503368 | 1.3704165627338489 | 1.3781491643801447 | Time Overrun | 0 | 0 | 46.37 | 46.37 | 46.37 | 46.37 | 46.37 | 46.37 | 46.37 | 46.37 | 46.37 | 46.37 | 46.37 | 46.37 | 46.36 | 46.36 | 46.36 | 46.36 | 46.36 | 46.36 | 46.36 | 46.36 | 46.36 | 46.36 | 46.36 | 46.36 | 46.36 | 46.36 | 46.36 | 46.36 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | تخزين المياه و توزيعها للمواطنين | محافظة العيـدابـي/مركز هـروب | 0 | 0 | 4 | 74736 | 3 | 26000 | 421300 | 0 | 68000 | 0 | Ok | المشاريع المنقولة المسحوبة | 0 | -9.9999999999980105E-3 | 9.9999999999980105E-3 | Good Progress | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 4009 | 1.3170366674981293 | -1271.0000000000005 | -42.366666666666681 | -0.31703666749812931 | 0.53639999999999999 | 51560959.193999998 | -1217017.1328245471 | 56164115.112120003 | -1325667.5478863884 | -4.2202989771833184E-4 | -1.2660896931549955E-2 | -44188.918262879604 | -2.4373263157894738E-2 | -0.8534366674981293 | ميزانية عامة | نعم | 48.541543187879995 | 104.7056583 | 56.164115112120001 | 0.46360000000000001 | No | 40757 | Out | 40642 | Out | 105 | 220 | No | 104.7056583 | 0 | 0 | 0 | 0 | 104.7056583 | 0 | 0 | 0.46360000000000001 | 0.31703666749812931 | 46.36 | 53.64 | Troubled | 53.64 | Troubled | Troubled | ميزانية عامة | ||||||||||||||||||||||||||||||||||||||||||||||||||
| 15 | 1118 | 02/18/2/08/0012/1 | إنشاء خزان عالي بسعة (3000م3) وتنفيذ محطة ضخ بمدينة القنفذة والمباني الادارية بموقع الخزان الإستراتيجي الجديد | الغربي | منطقة مكة المكرمة | مبادرات | مياه | خزانات | 43758 | 45454 | 1.4056603773584906 | 54098504.759999998 | 54.098504759999997 | 60419909.240000002 | 60.419909240000003 | 0 | 60.419909240000003 | نعم | 46203 | نعم | ضمن خط الأساس - المتعثر بداية العام | تحت التنفيذ | متعثر | شركة الاوبيض للمقاولات | شركة بيت الخبرة للاستشارات الهندسية | جاري | 46985 | 0 | 1.3531839622641511 | 1.3696933962264151 | 1.3879716981132075 | 1.4056603773584906 | 1.4239386792452831 | 1.4416273584905661 | 1.4599056603773586 | 1.4781839622641511 | 1.4958726415094339 | 1.5141509433962264 | 1.5318396226415094 | 1.5501179245283019 | Time Overrun | ضمن خط الأساس - المتعثر بداية العام | 45386 | V.Order | 84.843000000000004 | 84.843999999999994 | 84.844999999999999 | 84.847999999999999 | 84.849000000000004 | 84.844999999999999 | 84.847999999999999 | 84.847999999999999 | 84.85 | 84.850999999999999 | 84.852999999999994 | 84.853999999999999 | 84.84 | 84.84 | 84.84 | 84.84 | 84.84 | 84.84 | 84.84 | 84.84 | 84.85 | 84.85 | 84.85 | 84.85 | 84.84 | 84.84 | 84.85 | 84.85 | 99.59 | 99.98 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | زيادة سعة الخزن وارتباطه بمشروع شبكة مياه القنفذة المنفذة بطول 150كم وعدد 3000 توصيلة وخدمة ما يقرب من 12000 نسمة وذلك يزيد معدلات إيصال مياه الشرب للمستهلكين | محافظة القنفذة | 0 | 0 | 0 | 56000 | 0 | 3000 | 1825 | 0 | 0 | Ok | المشاريع المنقولة المدرجة ضمن خطة الاستلام 2026 م | 0 | -3.0000000000001137E-3 | 3.0000000000001137E-3 | Good Progress | 0 | 0 | 0 | 0 | 0 | 9.9999999999909051E-3 | 0 | 0 | 0 | -9.9999999999909051E-3 | 0 | 9.9999999999909051E-3 | 8.3333333333257542E-4 | 4.5082087299958993E-4 | 1696 | 1.4056603773584906 | -688 | -22.933333333333334 | -0.40566037735849059 | 0.15159999999999996 | 8201333.3216159977 | -357616.27855883713 | 9159658.2407839969 | -399403.70235976728 | -2.2034883720930228E-4 | -6.6104651162790674E-3 | -13313.456745325579 | -0.55726037735849054 | مشاريع التحول الوطني | 51.266292990140002 | 60.41990924000001 | 9.1536162498600078 | 0.84849999999999981 | No | 43902 | within time | 43699 | within time | -144 | 59 | Within Time | 0 | 60.419909240000003 | 0 | 0 | 0 | 60.419909240000003 | 22.768619000000001 | 0.42087335132476594 | 0.85208620376194888 | 0.40566037735849059 | 84.852499999999992 | 15.147500000000008 | Troubled | 15.15 | Delayed | Troubled | مشاريع التحول الوطني | |||||||||||||||||||||||||||||||||||||||||||||||||
| 16 | P11-5 | 6/25/2/1/P11-5/1 | استبدال خط 900 مم المغذي للشبكة | الجنوبي | منطقة عسير | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45826 | 46085 | 1.2200772200772201 | 16097750 | 16.097750000000001 | 18512412.5 | 18.5124125 | 0 | 18.5124125 | نعم | 46203 | نعم | ضمن المتعثر خلال العام 2026 | تحت التنفيذ | متأخر | شركة امداد الصحراء للمقاولات شركة شخص واحد | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | 0 | تم معالجته | 0.87644787644787647 | 0.98455598455598459 | 1.1042471042471043 | 1.2200772200772201 | 1.3397683397683398 | 1.4555984555984556 | 1.5752895752895753 | 1.6949806949806949 | 1.8108108108108107 | 1.9305019305019304 | 2.0463320463320462 | 2.1660231660231659 | Null | متوقع تعثره (مدة منقضية) | 45994 | Land Acquisition | 0 | 5.59 | 21.99 | 46 | 63.17 | 71 | 77 | 77.05 | 77.05 | 83.09 | 83.09 | 0 | 3.57 | 25.76 | 54.34 | 84.24 | 73.28 | 100 | 100 | 100 | 100 | 100 | 0 | 0 | 0 | 7380 | No | 84.24 | 63.17 | 21.069999999999993 | Low Progress | 0 | 0 | 0 | 5.59 | 16.399999999999999 | 24.01 | 17.170000000000002 | 7.8299999999999983 | 6 | 4.9999999999997158E-2 | 0 | 6.0400000000000063 | 6.9241666666666672 | 1.1146350395833335 | 259 | 1.2200772200772201 | -57 | -1.9 | -0.22007722007722008 | 0.22950000000000004 | 3694433.6250000005 | -1944438.7500000002 | 4248598.6687500002 | -2236104.5625 | -4.0263157894736851E-3 | -0.12078947368421056 | -74536.81875000002 | 3.8728125000000008E-3 | -0.44957722007722012 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | 15.381963546250001 | 18.5124125 | 3.1304489537499993 | 0.83089999999999997 | No | 45804 | Out | 45741 | Out | 22 | 85 | No | 10.336096979166667 | 3.6919585208333316 | 0 | 0 | 0 | 14.028055499999999 | 5780847.1500000097 | 6.6824950000000003 | 0.41511981488096161 | 0.71295963672414531 | 0.48727722007722007 | 91.772500000000008 | 8.227499999999992 | R | 16.91 | Delayed | EL | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 17 | 1438 | 10/17/2/02/0009/1 | تنفيذ شبكات الصرف الصحي بمدينة عرعر (المرحلة الثالثة )(ب) | الشمالي | منطقة الحدود الشمالية | مبادرات | صرف | خطوط وشبكات | 43429 | 44910 | 1.8318703578663065 | 74687756.060000002 | 74.687756059999998 | 83490013.5 | 83.490013500000003 | 0 | 83.490013500000003 | لا | مسحوب | مسحوب | شركة حيدر صالح ال حيدر وشريكه للمقاولات العامه والصيانه والتشغيل | شركة عبدالله عبدالرحمن السعيد للاستشارات الهندسية شركة مهنية شخص واحد | جاري | 46999 | 0 | 1.7717758271438218 | 1.7906819716407834 | 1.8116137744767049 | 1.8318703578663065 | 1.8528021607022283 | 1.8730587440918298 | 1.8939905469277516 | 1.9149223497636731 | 1.9351789331532747 | 1.9561107359891965 | 1.9763673193787981 | 1.9972991222147198 | Time Overrun | 0 | 0 | 38.78 | 38.78 | 38.78 | 38.78 | 38.78 | 38.78 | 38.78 | 38.78 | 38.78 | 38.78 | 38.78 | 38.78 | 38.549999999999997 | 38.78 | 38.78 | 38.78 | 38.78 | 38.78 | 38.78 | 38.78 | 38.78 | 38.78 | 38.78 | 38.78 | 38.78 | 38.78 | 38.78 | 38.78 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | زيادة تغطية الصرف الصحي بمدينة عرعر الحفاظ على البيئة توفير كميات مياه الصرف الصحي المعالجة المطلوبة لمدينة وعد الشمال (تدفقات متوقعه 5150م3/يوم) | حي المنصورية - حي شمال المنصورية | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 95435 | 0 | 0 | Ok | المشاريع المنقولة المسحوبة | 0 | 0 | 0 | Good Progress | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1481 | 1.8318703578663065 | -1232 | -41.06666666666667 | -0.83187035786630648 | 0.61219999999999997 | 45723844.259932004 | -1113405.2985373051 | 51112586.264700003 | -1244624.6655365259 | -4.969155844155844E-4 | -1.4907467532467533E-2 | -41487.488851217531 | 1.5581911980440096E-2 | -1.4440703578663063 | مشاريع التحول الوطني | نعم | 32.377427235300004 | 83.490013500000003 | 51.112586264699999 | 0.38780000000000003 | No | 43422 | within time | 43363 | Out | 7 | 66 | Within Time | 83.490013500000003 | 0 | 0 | 0 | 0 | 83.490013500000003 | 0 | 0 | 0.38780000000000003 | 0.83187035786630648 | 38.78 | 61.22 | Troubled | 61.22 | Troubled | Troubled | مشاريع التحول الوطني | ||||||||||||||||||||||||||||||||||||||||||||||||||
| 18 | AP1038-6 | 05/23/1/03/0016/1 | اتفاقية الخدمات الهندسية الاستشارية لإعداد الدراسات والتصاميم لمشاريع المياه والصرف الصحي بالقطاع الشرقي عقد (2) | الشرقي | المنطقة الشرقية | مشاريع الحزمة الأولى | استشاري | تصميم | 45327 | 46423 | 0.74361313868613144 | 93211809.310000002 | 93.211809310000007 | 107193580.70999999 | 107.19358070999999 | 0 | 107.19358070999999 | لا | تحت التنفيذ | استشاري | كونهوا للهندسة والاستشارات المحدودة | 0 | إتفاقية | 0.66240875912408759 | 0.68795620437956206 | 0.71624087591240881 | 0.74361313868613144 | 0.77189781021897808 | 0.7992700729927007 | 0.82755474452554745 | 0.8558394160583942 | 0.88321167883211682 | 0.91149635036496346 | 0.93886861313868608 | 0.96715328467153283 | Null | 0 | 0 | 0 | 0 | 0 | 19.600000000000001 | 49.6 | 36.4 | 36.4 | 36.4 | 45.2 | 56.5 | 56.5 | 56.5 | 0 | 0 | 0 | 0 | 0 | 79.959999999999994 | 79.959999999999994 | 91.49 | 91.49 | 91.49 | 91.49 | 91.49 | 91.49 | 91.49 | 91.49 | 91.49 | 0 | 0 | 0 | 2.2000000000000002 | 69.5 | 60.3 | 60.3 | 60.3 | 99.2 | 75.5 | 75.5 | 75.5 | 0 | 0 | 0 | 0 | 0 | 35.950000000000003 | 39.450000000000003 | 93.45 | 92.07 | 92.58 | 93.06 | 93.57 | 94.06 | 94.06 | 95.01 | 95.01 | استشاري عالمي تصميم | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 17.079999999999998 | 34.989999999999995 | -17.909999999999997 | Good Progress | 0 | 0 | 79.959999999999994 | 0 | 11.530000000000001 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 7.6241666666666665 | 7.1066236948099171 | 1096 | 0.74361313868613144 | 280.99999999999994 | 9.3666666666666654 | 0.25638686131386856 | 8.5100000000000051E-2 | 7932324.9722810052 | 846867.43476309674 | 9122173.7184210047 | 973897.55000936007 | 3.0284697508896824E-4 | 9.0854092526690463E-3 | 32463.251666978675 | 1.0627942497753824E-3 | 0.1712868613138685 | المشاريع الاستراتيجية | نعم | 98.071406991578982 | 101.844621032571 | 3.7732140409920163 | 0.96479999999999988 | No | 45315 | within time | 45259 | Out | 12 | 68 | Within Time | 71.066236948099174 | 36.127343761900818 | 0 | 0 | 0 | 107.19358070999999 | 54.150846000000001 | 0.58094404991010684 | 0.92024611504991127 | -0.18698686131386855 | 114.3625 | -20.792500000000004 | R | 3.52 | Regular | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||
| 19 | 10081 | 08/23/2/11/0001/1 | مشروع استكمال شبكات المياه وأعمال الربط للخطوط الرئيسية وأعمال مواقع المياه بمدينة تبوك | الشمالي الغربي | منطقة تبوك | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45315 | 46188 | 0.94730813287514315 | 38272630.090000004 | 38.272630090000007 | 44013524.609999999 | 44.013524609999997 | 0 | 44.013524609999997 | نعم | 46173 | نعم | ضمن المتعثر خلال العام 2026 | تحت التنفيذ | منتظم | شركة ابداع الحياة للاستثمار | شركة فيوتشر كونسلت للاستشارات الهندسية | جاري | 46985 | 0 | تم معالجته | 0.84536082474226804 | 0.87743413516609392 | 0.91294387170675828 | 0.94730813287514315 | 0.98281786941580751 | 1.0171821305841924 | 1.0526918671248569 | 1.0882016036655211 | 1.1225658648339061 | 1.1580756013745706 | 1.1924398625429553 | 1.2279495990836198 | Null | متوقع تعثره (مدة منقضية) | 45662 | Permissions | 0 | 0 | 0 | 0 | 0.89 | 3.9780000000000002 | 8.3079999999999998 | 8.3079999999999998 | 17.138000000000002 | 25.978000000000002 | 30.728000000000002 | 33.597999999999999 | 37.5 | 40.61 | 45.47 | 47.34 | 55 | 57.66 | 80.3 | 83.85 | 86.11 | 87.5 | 90.2 | 96.01 | 96.01 | 96.01 | 99.3 | 99.3 | 0 | 0 | 0 | 1.1200000000000001 | 2.99 | 6.5 | 10.55 | 10.55 | 18.32 | 25.83 | 38.75 | 47.04 | 65.86 | 42.58 | 47.71 | 54.11 | 61.57 | 100 | 64.010000000000005 | 82.38 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 99.3 | 0 | 0 | 0 | 0 | 0 | 0 | 16958 | 0 | 0 | No | 61.25 | 56.771999999999998 | 4.4780000000000015 | Good Progress | 1.8700000000000045 | 7.6599999999999966 | 2.6599999999999966 | 22.64 | 3.5499999999999972 | 2.2600000000000051 | 1.3900000000000006 | 2.7000000000000028 | 5.8100000000000023 | 0 | 0 | 3.289999999999992 | 4.4858333333333329 | 1.7168463981205835 | 873 | 0.94730813287514315 | 46.000000000000028 | 1.5333333333333343 | 5.269186712485685E-2 | 3.9899999999999949E-2 | 1527077.9405909982 | 995920.39603760687 | 1756139.6319389979 | 1145308.4556123891 | 8.6739130434782441E-4 | 2.6021739130434735E-2 | 38176.948520412967 | 1.2791867124856901E-2 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | 43.705429937729996 | 43.705429937729996 | 0 | 1 | No | 45292 | Out | 45230 | Out | 23 | 85 | No | 16.119156039571671 | 24.450062560428332 | 0 | 0 | 0 | 40.569218599999999 | 0 | 30.779755999999999 | 0.80422369530444759 | 0.90931290988576363 | -5.269186712485685E-2 | 103.6575 | -3.6574999999999989 | R | 0 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||
| 20 | O1014 | 08/23/2/04/0007/1 | استكمال مشروع توسعة محطة المعالجة بأملج إلى المرحلة الثلاثية | الشمالي الغربي | منطقة تبوك | عامة | صرف | محطات معالجة صرف صحي | 45469 | 46082 | 1.097879282218597 | 33143976.199999999 | 33.143976199999997 | 38115572.630000003 | 38.115572630000003 | 0 | 38.115572630000003 | نعم | 46173 | نعم | متوقع تعثره (مدة منقضية) | جاري الإستلام الإبتدائي | منتظم | شركة زهران للصيانة والتشغيل | شركة فيوتشر كونسلت للاستشارات الهندسية | جاري | 46985 | 0 | 45838 | 0.95269168026101136 | 0.99836867862969003 | 1.0489396411092986 | 1.097879282218597 | 1.1484502446982054 | 1.1973898858075041 | 1.2479608482871125 | 1.298531810766721 | 1.3474714518760196 | 1.398042414355628 | 1.4469820554649266 | 1.4975530179445351 | Null | متوقع تعثره (مدة منقضية) | 0 | 0 | 0 | 0 | 0 | 1.1299999999999999 | 1.44 | 1.63 | 2.04 | 2.48 | 5.95 | 9.4 | 12.71 | 21.83 | 28 | 40.049999999999997 | 52.38 | 61.25 | 72.33 | 78.81 | 85.51 | 85.51 | 95.6 | 95.6 | 0 | 0 | 0 | 0 | 0.3 | 1.6 | 4.5999999999999996 | 22.26 | 24.39 | 3.98 | 8.0399999999999991 | 11.48 | 19.489999999999998 | 36.75 | 49.66 | 66.17 | 59.67 | 76.25 | 78.989999999999995 | 90.18 | 100 | 100 | 100 | 16000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | محطة معالجة | No | توسعة | 58.07 | 59.81 | -1.740000000000002 | Good Progress | 3.45 | 3.3100000000000005 | 9.1199999999999974 | 6.1700000000000017 | 12.049999999999997 | 12.330000000000005 | 8.8699999999999974 | 11.079999999999998 | 6.480000000000004 | 6.7000000000000028 | 0 | 10.089999999999989 | 7.4708333333333323 | 2.476131221941666 | 613 | 1.097879282218597 | -59.99999999999995 | -1.9999999999999984 | -9.7879282218596986E-2 | 0.14489999999999995 | 4802562.1513799978 | -2401281.0756900008 | 5522946.474086999 | -2761473.2370435018 | -2.4150000000000009E-3 | -7.2450000000000042E-2 | -92049.107901450043 | 9.3970650887573951E-3 | -0.24277928221859693 | ميزانية عامة | 36.438487434279999 | 38.115572630000003 | 1.6770851957200037 | 0.95599999999999996 | No | 45440 | Out | 45411 | within time | 29 | 58 | Within Time | 21.9744562206 | 11.4598804094 | 0 | 0 | 0 | 33.434336630000004 | 26.154871 | 0.7891289458504982 | 0.72905316959189004 | 0.33537928221859703 | 94.742499999999993 | -15.752499999999998 | R | 4.4000000000000004 | Regular | R | ميزانية عامة | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 21 | AP370 | 26/25/2/2/AP370/1 | المجموعة الثالثة – مشروع زيادة سعة شبكة الصرف الصحي بمشعر منى | الغربي | وحدة عمل مكة | مشاريع الحزمة الأولى | صرف | خطوط وشبكات | 45714 | 46169 | 0.94065934065934065 | 131634700 | 131.63470000000001 | 151379905 | 151.37990500000001 | 0 | 151.37990500000001 | نعم | 46295 | نعم | متوقع تعثره (مدة منقضية) | استلام ابتدائي | استلام ابتدائي | شركة الفهد للتجارة والصناعة والمقاولات | شركة بيت الخبرة للاستشارات الهندسية | جاري | 46985 | 0 | 0.74505494505494507 | 0.80659340659340661 | 0.87472527472527473 | 0.94065934065934065 | 1.0087912087912088 | 1.0747252747252747 | 1.1428571428571428 | 1.2109890109890109 | 1.2769230769230768 | 1.3450549450549452 | 1.4109890109890111 | 1.4791208791208792 | Null | متوقع تعثره (مدة منقضية) | 0 | 0 | 0 | 1.29 | 2.4700000000000002 | 2.4700000000000002 | 21.53 | 36.1 | 51.62 | 67.05 | 79.66 | 85.41 | 86 | 86 | 86.49 | 86.49 | 0 | 0 | 1.18 | 2.3199999999999998 | 2.68 | 10.75 | 20.7 | 31.51 | 43.33 | 53.05 | 63.46 | 74.900000000000006 | 74.900000000000006 | 80.64 | 80.64 | 0 | 0 | 0 | 2557 | مشاريع المشاعر | No | 43.33 | 67.05 | -23.72 | Good Progress | 1.29 | 1.1800000000000002 | 0 | 19.060000000000002 | 14.57 | 15.519999999999996 | 15.43 | 12.61 | 5.75 | 0.59000000000000341 | 0 | 0.48999999999999488 | 7.2074999999999996 | 9.4875710024999993 | 455 | 0.94065934065934065 | 27.000000000000004 | 0.90000000000000013 | 5.9340659340659352E-2 | 0.14000000000000001 | 18428858.000000004 | 20476508.888888892 | 21193186.699999999 | 23547985.222222216 | 5.185185185185185E-3 | 0.15555555555555553 | 784932.84074074076 | -8.0659340659340661E-2 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | نعم | 130.9284798345 | 122.072755392 | -8.8557244424999908 | 1.0585 | No | 45708 | within time | 45708 | within time | 6 | 6 | Within Time | 94.338201666666691 | 12.818864333333323 | 0 | 0 | 0 | 107.15706600000001 | 19878465.52 | 65.150720000000007 | 0.49493575782069621 | 0.80056226893256799 | 0.41015934065934068 | 101.2825 | -37.822499999999998 | R | -5.85 | Regular | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 22 | 1487 | 12/20/2/11/0019/1 | تنفيذ الخط الناقل من محطة تنقية المياه على سد وادي ضمد لمحافظات الداير و العيدابي بمنطقة جازان | الجنوبي | منطقة جازان | مبادرات | مياه | خطوط وشبكات | 44096 | 46017 | 1.0650702758979698 | 26395140 | 26.395140000000001 | 30038549.780000001 | 30.03854978 | 0 | 30.03854978 | نعم | 46081 | نعم | جاري الإستلام الإبتدائي | متأخر | شركة سكاي العربية للمقاولات | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | 0 | 1.0187402394586154 | 1.0333159812597605 | 1.049453409682457 | 1.0650702758979698 | 1.0812077043206663 | 1.096824570536179 | 1.1129619989588755 | 1.1290994273815722 | 1.1447162935970849 | 1.1608537220197814 | 1.1764705882352942 | 1.1926080166579907 | Null | اسباب خاصة بالمقاول | ضعف كفاءة المقاول الفنية والمالية لانجاز الأعمال وفق البرنامج الزمني المعتمد | ضعف اّداء المقاول فني وإداري | تكثيف الجهود مع المقاول لخروج المشروع من التعثر | اعادة جدولة الاعمال المتبقية | إجراءات خاصة بالمقاول | 0 | 0 | 30 | 30 | 30 | 30.11 | 34.83 | 37.15 | 39 | 39 | 39 | 40.26 | 40.26 | 46.72 | 50.15 | 52.73 | 55.23 | 56.67 | 58.33 | 60.56 | 63.96 | 64.67 | 71.2 | 77.849999999999994 | 77.930000000000007 | 81.59 | 81.59 | 81.59 | 84.52 | 84.52 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 69.09 | 72.39 | 80.36 | 87.88 | 98.31 | 100 | 100 | 100 | 100 | 100 | نقل المياه من محطة التنقية لتغطية الاستهلاك في محافظة الداير و العيدابي | محافظة الداير و العيدابي | 0 | 0 | 2 | 20160 | 1 | 10000 | 8800 | 9000 | 0 | Ok | المشاريع المنقولة المدرجة ضمن خطة الاستلام 2026 م | -12.120000000000005 | 37.589999999999996 | -49.71 | Good Progress | 1.4400000000000048 | 1.6599999999999966 | 2.230000000000004 | 3.3999999999999986 | 0.71000000000000085 | 6.5300000000000011 | 6.6499999999999915 | 8.0000000000012506E-2 | 3.6599999999999966 | 0 | 0 | 2.9299999999999926 | 2.4408333333333334 | 0.64426137550000007 | 1921 | 1.0650702758979698 | -124.99999999999991 | -4.1666666666666634 | -6.5070275897969765E-2 | 0.18409999999999996 | 4859345.2739999993 | -1166242.8657600007 | 5530097.0144979991 | -1327223.2834795208 | -1.4728000000000007E-3 | -4.4184000000000022E-2 | -44240.776115984023 | 7.180555160142349E-3 | -0.24917027589796972 | مشاريع التحول الوطني | 25.388582274055999 | 30.038549779999997 | 4.649967505943998 | 0.84520000000000006 | No | 44089 | within time | 44052 | within time | 7 | 44 | Within Time | 5.7981324200000017 | 22.829694359999998 | 0 | 0 | 0 | 28.627826779999999 | 16.651582999999999 | 0.63085791551020365 | 0.78424748735114469 | 8.1970275897969791E-2 | 85.252500000000012 | 14.747499999999988 | R | 15.48 | Delayed | R | مشاريع التحول الوطني | ||||||||||||||||||||||||||||||||||||||||||||
| 23 | 1537 | 06/18/2/48/0458/1 | مشروع الخط الناقل للمياه المعالجة من محطات أبها وخميس مشيط إلى المنتزة الوطني ببيشة | المركز الرئيسي | المركز الرئيسي | عامة | صرف | إعادة إستعمال المياه المعالجة | 43730 | 46015 | 1.0555798687089715 | 378904522.29000002 | 378.90452229000005 | 424205691.50999999 | 424.20569151000001 | 0 | 424.20569151000001 | نعم | 46295 | نعم | تحت التنفيذ | متأخر | شركة بن جار الله للتجارة والمقاولات مساهمة مقفلة | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | 0 | 1.0166301969365428 | 1.0288840262582057 | 1.0424507658643325 | 1.0555798687089715 | 1.0691466083150984 | 1.0822757111597374 | 1.0958424507658644 | 1.1094091903719911 | 1.1225382932166301 | 1.1361050328227571 | 1.1492341356673961 | 1.162800875273523 | Null | 0 | 0 | 76.459999999999994 | 77.62 | 77.98 | 78.180000000000007 | 79.040000000000006 | 79.91 | 80.64 | 80.64 | 82.43 | 82.87 | 83.47 | 84.33 | 85.01 | 85.34 | 84.17 | 84.86 | 85.15 | 85.24 | 85.24 | 86.31 | 86.48 | 87.01 | 88.16 | 88.34 | 88.47 | 88.47 | 88.64 | 88.64 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 84.17 | 87.19 | 89.25 | 90.69 | 90.69 | 93.18 | 93.94 | 95.76 | 99.55 | 100 | 100 | 100 | 100 | 100 | الاستفادة من مياه الصرف الصحي المعالجة بتغذية المزارع والمنتزهات على طول مسار الخط الناقل | المزارع والمنتزهات على مسار الخط من محطات المعالجة بأبها وخميس مشيط وحتى خزان كاسر الضغط رقم 3 قبل منتزه بيشة بحوالي 45 كم | 0 | 0 | 1 | 150000 | 3 | 0 | 102000 | 0 | 0 | نعم | Ok | المشاريع المنقولة المدرجة ضمن خطة الاستلام 2026 م | -4.2399999999999949 | 3.5400000000000063 | -7.7800000000000011 | Good Progress | 0.68999999999999773 | 0.29000000000000625 | 8.99999999999892E-2 | 0 | 1.0700000000000074 | 0.17000000000000171 | 0.53000000000000114 | 1.1499999999999915 | 0.18000000000000682 | 0.12999999999999545 | 0 | 0.17000000000000171 | 0.37249999999999989 | 1.4114193455302497 | 2285 | 1.0555798687089715 | -126.9999999999998 | -4.2333333333333263 | -5.5579868708971469E-2 | 0.11530000000000001 | 43687691.420037001 | -10319927.107095372 | 48910916.231103003 | -11553759.739630651 | -9.0787401574803301E-4 | -2.7236220472440991E-2 | -385125.32465435495 | 4.3878055555555554E-3 | -0.17087986870897148 | ميزانية عامة | 376.01592495446397 | 424.20569151000001 | 48.189766555536039 | 0.88639999999999985 | No | 43736 | within time | 43719 | within time | -6 | 11 | Within Time | 13.577412048724995 | 410.62827946127504 | 0 | 0 | 0 | 424.20569151000007 | 212.24092099999999 | 0.56014354148446488 | 0.88656604242765291 | 6.0079868708971529E-2 | 89.277500000000003 | 10.722499999999997 | R | 11.36 | Delayed | R | ميزانية عامة | |||||||||||||||||||||||||||||||||||||||||||||||||
| 24 | P259 | 9/25/2/1/P259/1 | مشروع تنفيذ شبكات مياه محافظة الحجرة - المرحلة الأولى | الجنوبي | منطقة الباحة | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45743 | 46084 | 1.1700879765395895 | 3353000 | 3.3530000000000002 | 3855950 | 3.85595 | 0 | 3.85595 | نعم | منجز في تاريخه | 46053 | 46053 | لا | استلام ابتدائي | استلام ابتدائي | شركة كيان العربية للمقاولات | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | 0 | 45930 | 0.90909090909090906 | 0.99120234604105573 | 1.0821114369501466 | 1.1700879765395895 | 1.2609970674486803 | 1.3489736070381231 | 1.4398826979472141 | 1.530791788856305 | 1.6187683284457477 | 1.7096774193548387 | 1.7976539589442815 | 1.8885630498533725 | Null | 0 | 0 | 0 | 3.15 | 10.199999999999999 | 21.68 | 37.89 | 53.3 | 66.63 | 83.33 | 88.9 | 88.9 | 96.34 | 96.34 | 96.34 | 96.34 | 0 | 0 | 0.52 | 6.71 | 19.27 | 29.22 | 46.45 | 62.78 | 76.13 | 88.82 | 93.86 | 98.04 | 98.04 | 98.04 | 98.04 | 0 | 0 | 0 | 14100 | منجز حسب الخطة | ضمن الخطة الأساسية | No | 76.13 | 83.33 | -7.2000000000000028 | Good Progress | 3.15 | 7.0499999999999989 | 11.48 | 16.21 | 15.409999999999997 | 13.329999999999998 | 16.700000000000003 | 5.5700000000000074 | 0 | 7.4399999999999977 | 0 | 0 | 8.0283333333333342 | 0.2691900166666667 | 341 | 1.1700879765395895 | -58.000000000000021 | -1.933333333333334 | -0.17008797653958951 | 3.6599999999999966E-2 | 122719.79999999989 | -63475.758620689572 | 141127.76999999987 | -72997.122413793011 | -6.3103448275861991E-4 | -1.8931034482758596E-2 | -2433.2374137931006 | 6.4289073634204205E-4 | -0.20668797653958948 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | 3.7148222300000002 | 3.7803733800000003 | 6.5551150000000113E-2 | 0.98299999999999998 | No | 45692 | Out | 45692 | within time | 51 | 51 | Within Time | 3.0592799999999998 | 0 | 0 | 0 | 0 | 3.0592799999999998 | 0 | 2.0861779999999999 | 0.62218252311362954 | 0.89456583226610586 | 0.28188797653958964 | 112.98500000000001 | -19.125000000000014 | R | 1.7 | Regular | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 25 | AP368 | 26/25/2/2/AP368/1 | المجموعة الأولى – مشروع زيادة سعة شبكة الصرف الصحي بمشعر منى | الغربي | وحدة عمل مكة | مشاريع الحزمة الأولى | صرف | خطوط وشبكات | 45714 | 46169 | 0.94065934065934065 | 226152915 | 226.15291500000001 | 260075852.25 | 260.07585225000003 | 0 | 260.07585225000003 | نعم | 46295 | نعم | متوقع تعثره (مدة منقضية) | استلام ابتدائي | استلام ابتدائي | شركة عبدالله إبراهيم الصايغ وأولاده للمقاولات | شركة بيت الخبرة للاستشارات الهندسية | جاري | 46985 | 0 | 0.74505494505494507 | 0.80659340659340661 | 0.87472527472527473 | 0.94065934065934065 | 1.0087912087912088 | 1.0747252747252747 | 1.1428571428571428 | 1.2109890109890109 | 1.2769230769230768 | 1.3450549450549452 | 1.4109890109890111 | 1.4791208791208792 | Null | متوقع تعثره (مدة منقضية) | 0 | 0 | 0 | 6.1 | 6.56 | 8.27 | 20.99 | 34.700000000000003 | 49 | 63.32 | 70 | 80.22 | 82.18 | 82.18 | 82.37 | 82.37 | 0 | 0 | 5.25 | 9.4499999999999993 | 10.46 | 14.88 | 26.5 | 39.47 | 52.16 | 64.61 | 75.180000000000007 | 87.16 | 87.16 | 93.16 | 93.16 | 0 | 0 | 0 | 3057 | مشاريع المشاعر | No | 52.16 | 63.32 | -11.160000000000004 | Good Progress | 6.1 | 0.45999999999999996 | 1.71 | 12.719999999999999 | 13.710000000000004 | 14.299999999999997 | 14.32 | 6.68 | 10.219999999999999 | 1.960000000000008 | 0 | 0.18999999999999773 | 6.8641666666666667 | 15.523513007125 | 455 | 0.94065934065934065 | 27.000000000000004 | 0.90000000000000013 | 5.9340659340659352E-2 | 0.17819999999999994 | 40300449.452999979 | 44778277.169999972 | 46345516.870949984 | 51495018.745499976 | 6.5999999999999974E-3 | 0.1979999999999999 | 1716500.6248499993 | -0.11885934065934059 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | نعم | 214.22447949832502 | 242.28666395610003 | 28.062184457775004 | 0.8921 | No | 45708 | within time | 45708 | within time | 6 | 6 | Within Time | 154.87705462250003 | 42.494097627499997 | 0 | 0 | 0 | 197.37115225000002 | 61325701.619999997 | 108.061561 | 0.47782519628367381 | 0.70336083529181559 | 0.29455934065934064 | 90.592500000000001 | -15.412499999999994 | R | 10.79 | Delayed | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 26 | AP369 | 26/25/2/2/AP369/1 | المجموعة الثانية – مشروع زيادة سعة شبكة الصرف الصحي بمشعر منى | الغربي | وحدة عمل مكة | مشاريع الحزمة الأولى | صرف | خطوط وشبكات | 45714 | 46169 | 0.94065934065934065 | 168350060 | 168.35006000000001 | 193602569 | 193.60256899999999 | 0 | 193.60256899999999 | نعم | 46295 | نعم | متوقع تعثره (مدة منقضية) | استلام ابتدائي | استلام ابتدائي | شركة صرح الحديثة للمقاولات | شركة بيت الخبرة للاستشارات الهندسية | جاري | 46985 | 0 | 0.74505494505494507 | 0.80659340659340661 | 0.87472527472527473 | 0.94065934065934065 | 1.0087912087912088 | 1.0747252747252747 | 1.1428571428571428 | 1.2109890109890109 | 1.2769230769230768 | 1.3450549450549452 | 1.4109890109890111 | 1.4791208791208792 | Null | متوقع تعثره (مدة منقضية) | 0 | 0 | 0 | 8.6999999999999993 | 8.73 | 10.3 | 22.63 | 38.049999999999997 | 51.91 | 66.010000000000005 | 70.08 | 85.06 | 88.19 | 88.19 | 96.09 | 96.09 | 0 | 0 | 0.64 | 2.2999999999999998 | 2.99 | 10.199999999999999 | 19.77 | 35.39 | 49.05 | 62.31 | 73.010000000000005 | 82.27 | 82.27 | 98.83 | 98.83 | 0 | 0 | 0 | 8565 | مشاريع المشاعر | No | 49.05 | 66.010000000000005 | -16.960000000000008 | Good Progress | 8.6999999999999993 | 3.0000000000001137E-2 | 1.5700000000000003 | 12.329999999999998 | 15.419999999999998 | 13.86 | 14.100000000000009 | 4.0699999999999932 | 14.980000000000004 | 3.1299999999999955 | 0 | 7.9000000000000057 | 8.0075000000000003 | 13.480631054500002 | 455 | 0.94065934065934065 | 27.000000000000004 | 0.90000000000000013 | 5.9340659340659352E-2 | 0.11810000000000002 | 19882142.086000003 | 22091268.984444443 | 22864463.398900002 | 25404959.332111109 | 4.3740740740740745E-3 | 0.13122222222222224 | 846831.97773703712 | 2.2413326086956512E-2 | -5.8759340659340673E-2 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | نعم | 186.03270855210002 | 191.3374189427 | 5.3047103905999791 | 0.97260000000000013 | No | 45708 | within time | 45708 | within time | 6 | 6 | Within Time | 123.72326492833335 | 45.836562071666634 | 0 | 0 | 0 | 169.55982699999998 | 48874545.740000002 | 85.655878999999999 | 0.50879624872126561 | 0.70438387875168595 | 0.31755934065934066 | 94.102499999999992 | -21.092499999999987 | R | 2.74 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 27 | 10058 | 05/22/2/11/0018/1 | مشاريع تحسين شبكات المياه في مدينة الجبيل - مشروع رقم (1) ورقم (2) -شبكة المياه الاستراتيجية والتوزيع والخزانات | الشرقي | المنطقة الشرقية | المشاريع الملحة | مياه | خطوط وشبكات | 45053 | 46359 | 0.83384379785604901 | 547000000 | 547 | 629050000 | 629.04999999999995 | 0 | 629.04999999999995 | نعم | 46387 | نعم | تحت التنفيذ | منتظم | شركة اليمامة للأعمال التجارية والمقاولات مساهمة مقفلة | شركة آي ال اف وشركاهم الهندسية | جاري | 46224 | ضعف السيولة | مستهدفات | 0.76569678407350694 | 0.78713629402756513 | 0.8108728943338438 | 0.83384379785604901 | 0.85758039816232767 | 0.88055130168453288 | 0.90428790199081166 | 0.92802450229709033 | 0.95099540581929554 | 0.97473200612557431 | 0.99770290964777952 | 1.0214395099540583 | Null | 45162 | Land Acquisition | 7.84 | 10.63 | 12.7 | 14.33 | 15.96 | 17.829999999999998 | 21.06 | 21.06 | 27.36 | 30.1 | 35.42 | 39.119999999999997 | 42.15 | 44.13 | 46.92 | 50.63 | 54.46 | 58.59 | 62.61 | 65.83 | 69.540000000000006 | 73.09 | 74.03 | 75.459999999999994 | 75.5 | 75.5 | 76.08 | 76.08 | 21.18 | 24.02 | 27.09 | 29.53 | 33.590000000000003 | 37.79 | 44.59 | 44.59 | 51.38 | 27.36 | 28.82 | 32.69 | 37.11 | 38.549999999999997 | 40.71 | 44.54 | 48.56 | 52.44 | 55.34 | 60.56 | 67.64 | 72.959999999999994 | 76.930000000000007 | 80.44 | 75.47 | 75.47 | 76.260000000000005 | 76.260000000000005 | 0 | 0 | 3 | 317000 | 6 | 158000 | 91548 | 0 | 0 | استكمال منظومة برنامج مشاريع تحسين جودة مياه الشرب بالمنطقة الشرقية | تحسين جودة المياه | No | 44.139999999999993 | 37.67 | 6.4699999999999918 | Good Progress | 3.7100000000000009 | 3.8299999999999983 | 4.1300000000000026 | 4.019999999999996 | 3.2199999999999989 | 3.710000000000008 | 3.5499999999999972 | 0.93999999999999773 | 1.4299999999999926 | 4.0000000000006253E-2 | 0 | 0.57999999999999829 | 2.4299999999999997 | 13.292099999999998 | 1306 | 0.83384379785604901 | 217 | 7.2333333333333334 | 0.16615620214395099 | 0.245 | 134015000 | 18527419.35483871 | 154117250 | 21306532.258064516 | 1.129032258064516E-3 | 3.387096774193548E-2 | 710217.74193548376 | -7.8843797856049003E-2 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | 478.58123999999998 | 479.71353000000005 | 1.1322900000000686 | 0.99819999999999987 | No | 45035 | Out | 45011 | within time | 18 | 42 | Within Time | 130.27716666666666 | 457.53167933333327 | 0 | 0 | 0 | 587.8088459999999 | 285742825.12 | 232.944759 | 0.42585879159049361 | 0.74346611581670186 | 6.4543797856048912E-2 | 81.319999999999993 | -0.87999999999999545 | R | 0.18 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||
| 28 | AP1038-11 | 25/22/1/03/0027/1 | الخدمات الهندسية الاستشارية الدراسات والتصاميم والهندسة القيمية لمشاريع المياه والصرف الصحي بالقطاع الغربي عقد رقم(1) | الغربي | وحدة عمل جدة | مشاريع الحزمة الأولى | استشاري | تصميم | 45334 | 46430 | 0.73722627737226276 | 167492973.88 | 167.49297387999999 | 192616919.96000001 | 192.61691996000002 | 0 | 192.61691996000002 | لا | تحت التنفيذ | استشاري | كونهوا للهندسة والاستشارات المحدودة | 0 | 0.65602189781021902 | 0.68156934306569339 | 0.70985401459854014 | 0.73722627737226276 | 0.76551094890510951 | 0.79288321167883213 | 0.82116788321167888 | 0.84945255474452552 | 0.87682481751824815 | 0.9051094890510949 | 0.93248175182481752 | 0.96076642335766427 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 56.77 | 56.77 | 0 | 0 | 0 | 0 | 0 | 96.05 | 74.38 | 74.430000000000007 | 74.430000000000007 | 74.430000000000007 | 74.430000000000007 | 74.430000000000007 | 74.430000000000007 | 74.430000000000007 | 74.430000000000007 | 74.430000000000007 | 0 | 0 | 0 | 0 | 0 | 0 | 15.51094890510949 | 16.87956204379562 | 21.076642335766422 | 23.905109489051096 | 58 | 58 | 0 | 0 | 0 | 0 | 0 | 31.75 | 78.790000000000006 | 80 | 81.16 | 82.34 | 83.53 | 84.76 | 85.94 | 85.94 | 88.04 | 88.04 | خدمات استشارية | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 24.340000000000003 | 17.660000000000004 | 6.68 | Good Progress | 0 | 0 | 96.05 | -21.67 | 5.0000000000011369E-2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 6.2025000000000006 | 10.388751704907001 | 1096 | 0.73722627737226276 | 288 | 9.6 | 0.26277372262773724 | 0.25569999999999993 | 42827953.421115987 | 4461245.1480329158 | 49252146.43377199 | 5130431.9201845825 | 8.8784722222222195E-4 | 2.6635416666666658E-2 | 171014.39733948605 | 6.7411818181818163E-3 | 7.0737226277373111E-3 | المشاريع الاستراتيجية | نعم | 143.36477352622802 | 169.57993633278403 | 26.215162806556009 | 0.8639 | No | 45316 | Out | 45259 | Out | 18 | 75 | No | 103.88751704907001 | 74.02463091093 | 0 | 0 | 0 | 177.91214796000003 | 87.471845000000002 | 0.52224187662145771 | 0.74820745264169775 | -9.8073722627737281E-2 | 93.037500000000009 | -8.2775000000000034 | R | 13.61 | Delayed | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 29 | P877-1 | 03/23/1/09/0018/1 | اعمال الرفع المساحي لاراضي واصول المياه والصرف الصحي المستقبلية بمنطقة المدينة المنورة | الشمالي الغربي | منطقة المدينة المنورة | مشاريع الحزمة الأولى | استشاري | تصميم | 45319 | 46415 | 0.75091240875912413 | 710000 | 0.71 | 816500 | 0.8165 | 0 | 0.8165 | لا | تحت التنفيذ | استشاري | العماد العربى للاستشارات الهندسية | 0 | 0.66970802919708028 | 0.69525547445255476 | 0.72354014598540151 | 0.75091240875912413 | 0.77919708029197077 | 0.80656934306569339 | 0.83485401459854014 | 0.86313868613138689 | 0.89051094890510951 | 0.91879562043795615 | 0.94616788321167888 | 0.97445255474452552 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 25.35 | 25.35 | 0 | 0 | 0 | 0 | 0 | 34 | 34.25 | 34.25 | 34.270000000000003 | 34.270000000000003 | 34.270000000000003 | 34.270000000000003 | 34.270000000000003 | 34.270000000000003 | 34.9 | 34.9 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 28.5 | 28.5 | 0 | 0 | 0 | 0 | 0 | 24.77 | 29.99 | 33.630000000000003 | 37.01 | 41.17 | 46.19 | 50.31 | 54.91 | 54.91 | 63.48 | 63.48 | خدمات استشارية | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 12.670000000000002 | 8.9200000000000017 | 3.75 | Good Progress | 0 | 0 | 34 | 0.25 | 0 | 2.0000000000003126E-2 | 0 | 0 | 0 | 0 | 0 | 0.62999999999999545 | 2.9083333333333332 | 2.0649166666666666E-2 | 1096 | 0.75091240875912413 | 272.99999999999994 | 9.0999999999999979 | 0.24908759124087587 | 0.65729999999999988 | 466682.99999999994 | 51283.846153846156 | 536685.44999999995 | 58976.423076923085 | 2.4076923076923077E-3 | 7.2230769230769237E-2 | 1965.8807692307694 | 2.0321306772908367E-2 | -0.40821240875912401 | المشاريع الاستراتيجية | نعم | 0.28495849999999995 | 0.51831419999999995 | 0.2333557 | 0.71419999999999995 | No | 45270 | Out | 45269 | within time | 49 | 50 | Within Time | 0.20276416666666669 | 0.61373583333333337 | 0 | 0 | 0 | 0.8165 | 9.1999999999999998E-2 | 0.12957746478873239 | 0.34314463812263785 | 0.28901240875912415 | 42.995000000000005 | 7.3149999999999977 | R | 28.58 | Troubled | Troubled | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 30 | P1386 | 04/23/2/09/0024/1 | مشروع إنشاء أعمال المدخل ومصب الصهاريج بمحطة معالجة الصرف الصحي الثانية بعنيزة | الشمالي | منطقة القصيم | مشاريع الحزمة الأولى | صرف | محطات معالجة صرف صحي | 45455 | 46511 | 0.65056818181818177 | 11976338 | 11.976338 | 13772788.699999999 | 13.7727887 | 0 | 13.7727887 | لا | تحت التنفيذ | منتظم | شركة سيسرا المحدودة | شركة عبدالله عبدالرحمن السعيد للاستشارات الهندسية شركة مهنية شخص واحد | جاري | 46999 | 0 | 45930 | 0.56628787878787878 | 0.59280303030303028 | 0.62215909090909094 | 0.65056818181818177 | 0.67992424242424243 | 0.70833333333333337 | 0.73768939393939392 | 0.76704545454545459 | 0.79545454545454541 | 0.82481060606060608 | 0.85321969696969702 | 0.88257575757575757 | Null | 0 | 0 | 0 | 0 | 0 | 0.22700000000000001 | 0.22700000000000001 | 0.52700000000000002 | 0.40899999999999997 | 0.64 | 2.4900000000000002 | 3.68 | 4.66 | 10 | 12.54 | 14.91 | 24 | 37.71 | 41.45 | 43.89 | 49.69 | 72.23 | 72.23 | 78.180000000000007 | 78.180000000000007 | 0 | 0 | 0 | 0 | 0.15 | 0.88 | 2.13 | 3.58 | 7.76 | 10.73 | 12.75 | 19.68 | 24.99 | 32.270000000000003 | 39.86 | 48.9 | 20.63 | 26.23 | 36.06 | 49.38 | 52.62 | 52.62 | 69.61 | 78.180000000000007 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 455 | 0 | 0 | No | 24.1 | 40.923000000000002 | -16.823 | Good Progress | 0.98 | 5.34 | 2.5399999999999991 | 2.370000000000001 | 9.09 | 13.71 | 3.740000000000002 | 2.4399999999999977 | 5.7999999999999972 | 22.540000000000006 | 0 | 5.9500000000000028 | 6.2083333333333348 | 0.74353098416666685 | 1056 | 0.65056818181818177 | 369.00000000000006 | 12.300000000000002 | 0.34943181818181823 | 0.27769999999999995 | 3325829.0625999994 | 270392.60671544704 | 3824703.4219899992 | 310951.49772276409 | 7.5257452574525722E-4 | 2.2577235772357714E-2 | 10365.049924092136 | 6.1722955854126675E-3 | 7.1731818181818285E-2 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 296 | نعم | نعم | 10.76756620566 | 10.76756620566 | 0 | 1 | No | 45435 | Out | 45397 | within time | 20 | 58 | Within Time | 6.8414830824999999 | 5.6816266174999992 | 0 | 0 | 0 | 12.523109699999999 | 1394357.1279879999 | 4.5158719999999999 | 0.3770661783259624 | 0.44056120730758142 | 0.28996818181818174 | 62.515000000000001 | -13.134999999999998 | R | 0 | Regular | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 31 | P1327 | 04/23/2/31/0018/1 | تنفيذ منظومة الطرق المائي لخطوط آبار المخرم وأم حزم وخط التغذية 1 و2 وخط آبار النبقية | الشمالي | منطقة القصيم | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45407 | 46202 | 0.92452830188679247 | 4326000 | 4.3259999999999996 | 4974900 | 4.9748999999999999 | 0 | 4.9748999999999999 | نعم | منجز في تاريخه | 46081 | 46081 | لا | استلام ابتدائي | استلام ابتدائي | شركة ماكسون للمقاولات | شركة عبدالله عبدالرحمن السعيد للاستشارات الهندسية شركة مهنية شخص واحد | جاري | 46999 | غير متعثر فعليا - اجراءات ادارية | 0.8125786163522013 | 0.84779874213836481 | 0.8867924528301887 | 0.92452830188679247 | 0.96352201257861636 | 1.0012578616352201 | 1.040251572327044 | 1.0792452830188679 | 1.1169811320754717 | 1.1559748427672956 | 1.1937106918238993 | 1.2327044025157232 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1.5 | 7.1 | 18.5 | 34.479999999999997 | 56.96 | 65.459999999999994 | 77.19 | 79 | 82.2 | 83 | 85 | 85 | 100 | 100 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1.55 | 12.64 | 18.760000000000002 | 26.01 | 32.049999999999997 | 43.36 | 49.41 | 61.42 | 68.959999999999994 | 78 | 83.57 | 89.36 | 84.41 | 86.96 | 86.96 | 86.96 | 86.96 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | منجز حسب الخطة | ضمن الخطة الأساسية | No | 83.57 | 79 | 4.5699999999999932 | Good Progress | 5.6 | 11.4 | 15.979999999999997 | 22.480000000000004 | 8.4999999999999929 | 11.730000000000004 | 1.8100000000000023 | 3.2000000000000028 | 0.79999999999999716 | 2 | 0 | 15 | 8.2083333333333339 | 0.35509250000000003 | 795 | 0.92452830188679247 | 59.999999999999986 | 1.9999999999999996 | 7.547169811320753E-2 | 0.15 | 648900 | 324450.00000000006 | 746235 | 373117.50000000006 | 2.5000000000000005E-3 | 7.5000000000000011E-2 | 12437.250000000002 | 2.0019743336623891E-3 | -7.4528301886792464E-2 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | 4.9748999999999999 | 4.3261730399999996 | -0.6487269600000003 | 1.1304000000000001 | No | 45369 | Out | 45369 | within time | 38 | 38 | Within Time | 3.0101749999999994 | 1.6669730000000005 | 0 | 0 | 0 | 4.6771479999999999 | 278096.91000000015 | 3.0058739999999999 | 0.69483911234396678 | 0.82775154146311591 | 3.092830188679252E-2 | 106.825 | -22.415000000000006 | R | -13.04 | Regular | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||
| 32 | P257 | 09/23/2/01/0011/1 | تنفيذ أعمال انشاء شبكات المياه بالمناطق المحيطة بخزان دوقة عبد الحميد بمحافظة قلوة | الجنوبي | منطقة الباحة | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45665 | 46143 | 0.997907949790795 | 4635950 | 4.6359500000000002 | 5331342.5 | 5.3313424999999999 | 0 | 5.3313424999999999 | نعم | 46295 | نعم | متوقع تعثره (مدة منقضية) | تحت التنفيذ | منتظم | شركة أصول البناء للتجارة والمقاولات المحدودة | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | 0 | 45991 | 0.81171548117154813 | 0.87029288702928875 | 0.93514644351464438 | 0.997907949790795 | 1.0627615062761506 | 1.1255230125523012 | 1.1903765690376569 | 1.2552301255230125 | 1.3179916317991631 | 1.3828451882845187 | 1.4456066945606694 | 1.5104602510460252 | Null | متوقع تعثره (مدة منقضية) | 0 | 0 | 0 | 0 | 0 | 2.5 | 10.4 | 20.079999999999998 | 26.21 | 36.78 | 48.59 | 52.8 | 59.4 | 62.1 | 67.64 | 67.64 | 72.599999999999994 | 72.599999999999994 | 0 | 0 | 0.21 | 4.6100000000000003 | 10.68 | 19.86 | 29.77 | 41.8 | 56.54 | 72.2 | 52.71 | 59.35 | 65.180000000000007 | 72.569999999999993 | 72.569999999999993 | 97.35 | 72.599999999999994 | 0 | 0 | 0 | 0 | 0 | 0 | 11330 | 0 | 0 | No | 52.71 | 52.8 | -8.9999999999996305E-2 | Good Progress | 2.5 | 7.9 | 9.6799999999999979 | 6.1300000000000026 | 10.57 | 11.810000000000002 | 4.2099999999999937 | 6.6000000000000014 | 2.7000000000000028 | 5.5399999999999991 | 0 | 4.9599999999999937 | 6.05 | 0.28047497500000002 | 478 | 0.997907949790795 | 0.99999999999998934 | 3.3333333333332979E-2 | 2.0920502092049986E-3 | 0.3236 | 1500193.42 | 45005802.600000478 | 1725222.4329999997 | 51756672.990000539 | 0.32360000000000344 | 9.7080000000001032 | 1725222.4330000184 | 1.5188060301507534E-2 | -0.321507949790795 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | 3.8705546549999998 | 3.8705546549999998 | 0 | 1 | No | 45638 | Out | 45636 | within time | 27 | 29 | Within Time | 2.6131304833333333 | 2.1555210166666665 | 0 | 0 | 0 | 4.7686514999999998 | 1675919.2400000002 | 2.0355300000000001 | 0.43907505473527542 | 0.59661960786981572 | 0.40440794979079497 | 77.55 | -12.36999999999999 | R | 0 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 33 | 698 | 05/22/2/11/0003/1 | مشروع تحسين شبكات المياه في مدينة القطيف - مشروع رقم 2 شمال غرب القطيف – شبكة المياه الاستراتيجية والخزانات | الشرقي | المنطقة الشرقية | المشاريع الملحة | مياه | خطوط وشبكات | 44763 | 46366 | 0.86026200873362446 | 334380000 | 334.38 | 384537000 | 384.53699999999998 | 0 | 384.53699999999998 | لا | تحت التنفيذ | منتظم | شركة مرامر للمقاولات شركة مساهمة سعودية مقفلة | شركة آي ال اف وشركاهم الهندسية | جاري | 46224 | غير متعثر فعليا - اجراءات ادارية | 0 | مستهدفات | 0.80474111041796637 | 0.82220835932626324 | 0.8415470991890206 | 0.86026200873362446 | 0.87960074859638182 | 0.89831565814098568 | 0.91765439800374293 | 0.93699313786650029 | 0.95570804741110416 | 0.97504678727386151 | 0.99376169681846538 | 1.0131004366812226 | Null | 0 | 0 | 42.44 | 44 | 46.24 | 47.63 | 48.74 | 49.87 | 51.73 | 51.73 | 55.3 | 56.38 | 61.08 | 61.12 | 64.260000000000005 | 66.86 | 75.680000000000007 | 76.77 | 77.209999999999994 | 77.92 | 79.14 | 80.489999999999995 | 81.2 | 83.5 | 83.71 | 83.78 | 83.86 | 83.86 | 83.99 | 83.99 | 58.02 | 62.77 | 67.39 | 71.95 | 77.75 | 81.8 | 86.16 | 86.16 | 95.26 | 73.430000000000007 | 74.58 | 75.650000000000006 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 84.78 | 85.47 | 85.47 | 85.87 | 85.87 | العيا - الشعبة -المطيرفية -الفنار | 0 | 0 | 3 | 4000 | 4 | 172000 | 38870 | 0 | 0 | 0 | استكمال منظومة برنامج مشاريع تحسين جودة مياه الشرب بالمنطقة الشرقية | تحسين جودة المياه | No | 25.42 | 22.42 | 3 | Good Progress | 1.0899999999999892 | 0.43999999999999773 | 0.71000000000000796 | 1.2199999999999989 | 1.3499999999999943 | 0.71000000000000796 | 2.2999999999999972 | 0.20999999999999375 | 7.000000000000739E-2 | 7.9999999999998295E-2 | 0 | 0.12999999999999545 | 0.69249999999999901 | 2.3155814999999969 | 1603 | 0.86026200873362446 | 224 | 7.4666666666666668 | 0.13973799126637554 | 0.16140000000000002 | 53968932 | 7227981.9642857146 | 62064271.799999997 | 8312179.2589285709 | 7.2053571428571436E-4 | 2.1616071428571432E-2 | 277072.64196428575 | 6.8688837209302323E-3 | -2.1662008733624477E-2 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | 322.9726263 | 330.2019219 | 7.2292956000000004 | 0.98119999999999996 | No | 44720 | Out | 44704 | within time | 43 | 59 | Within Time | 22.793569999999978 | 300.75208099999998 | 0 | 0 | 0 | 323.54565099999996 | 64579771.899999999 | 188.31415100000001 | 0.56317408636880195 | 0.84184103053237835 | -0.13973799126637554 | 85.787499999999994 | -1.0074999999999932 | R | 1.88 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||
| 34 | 10301 | 26/23/2/11/0024/1 | مشروع تنفيذ خط نقل رئيسي لإمداد المنطقتين رقم (8) و (9) بمشعر منى | الغربي | وحدة عمل مكة | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45484 | 45849 | 1.8027397260273972 | 118900074 | 118.900074 | 136735085.09999999 | 136.73508509999999 | 0 | 136.73508509999999 | نعم | منجز في تاريخه | 46053 | 46053 | لا | استلام ابتدائي | استلام ابتدائي | شركة البنايات العربية للمقاولات العامة | شركة بيت الخبرة للاستشارات الهندسية | جاري | 46985 | 0 | 45747 | 1.558904109589041 | 1.6356164383561644 | 1.7205479452054795 | 1.8027397260273972 | 1.8876712328767122 | 1.9698630136986301 | 2.0547945205479454 | 2.1397260273972605 | 2.2219178082191782 | 2.3068493150684932 | 2.3890410958904109 | 2.473972602739726 | Time Overrun | إيقاف جزئي | 0 | 0 | 0 | 0 | 5.8 | 16.05 | 20.84 | 35.119999999999997 | 56.55 | 75.66 | 78.010000000000005 | 84.7 | 84.8 | 84.8 | 84.8 | 84.8 | 84.8 | 84.8 | 84.8 | 84.8 | 84.8 | 84.8 | 84.8 | 84.8 | 0 | 0 | 0 | 8.9079999999999995 | 18.562999999999999 | 25.65 | 42.53 | 66.349999999999994 | 83.91 | 94.33 | 99.94 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 0 | 0 | 0 | 0 | 0 | 0 | 5451 | 0 | 0 | منجز حسب الخطة | ضمن الخطة الأساسية | مشاريع المشاعر | No | 74.349999999999994 | 63.959999999999994 | 10.39 | Low Progress | 6.6899999999999977 | 9.9999999999994316E-2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.56583333333333263 | 0.67277625204999925 | 365 | 1.8027397260273972 | -293 | -9.7666666666666675 | -0.80273972602739718 | 0.15200000000000002 | 18072811.248000003 | -1850458.4895563142 | 20783732.935200002 | -2128027.2629897613 | -5.1877133105802053E-4 | -1.5563139931740615E-2 | -70934.242099658703 | -9.4317948717948727E-3 | -0.95473972602739721 | المشاريع الاستراتيجية | نعم | 115.95135216479999 | 136.73508509999999 | 20.783732935200007 | 0.84799999999999998 | No | 45482 | within time | 45468 | within time | 2 | 16 | Within Time | 130.5376991 | 0 | 0 | 0 | 0 | 130.5376991 | 71.616574 | 0.6023257311008906 | 0.8531386737539931 | 0.80273972602739718 | 86.497500000000002 | 13.502499999999998 | Troubled | 15.2 | Delayed | Troubled | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 35 | 10247 | 25/23/2/48/0031/1 | تصميم وتنفيذ محطة الضخ والخط الناقل للمياه الصرف المعالجة لتغذية الغابة الشرقية بجدة | الغربي | وحدة عمل جدة | إيرادات الشركة | صرف | إعادة إستعمال المياه المعالجة | 45413 | 46143 | 0.99863013698630132 | 76411779.370000005 | 76.411779370000005 | 87873546.299999997 | 87.873546300000001 | 0 | 87.873546300000001 | نعم | 46295 | نعم | متوقع تعثره (مدة منقضية) | تحت التنفيذ | منتظم | شركة القدرة للمقاولات | شركة بيت الخبرة للاستشارات الهندسية | جاري | 46985 | 0 | 45716 | 0.87671232876712324 | 0.91506849315068495 | 0.95753424657534247 | 0.99863013698630132 | 1.0410958904109588 | 1.0821917808219179 | 1.1246575342465754 | 1.167123287671233 | 1.2082191780821918 | 1.2506849315068493 | 1.2917808219178082 | 1.3342465753424657 | Null | متوقع تعثره (مدة منقضية) | •تم تنفيذ كامل نطاق العقد ونظرا لارتباطه بمشروع مسحوب فقد تطلب الامر تخفيض نطاق العقد لبعض اعمال التوريد والتركيب بمحطة الرفع لتصبح توريد فقط حتى لا تتعرض للتلف نتيجة تواجدها بمنطقة نائية | 0 | 0 | 0 | 0 | 1.35 | 1.35 | 1.44 | 1.62 | 2.52 | 8.67 | 12.86 | 21 | 32.36 | 40.01 | 52.5 | 62.01 | 69.5 | 77 | 82.5 | 89 | 90.1 | 90.1 | 94 | 94 | 96 | 96 | 0 | 0 | 0.14000000000000001 | 1.07 | 1.07 | 2.59 | 2.91 | 3.09 | 5.13 | 10.53 | 19.329999999999998 | 29.76 | 37.89 | 37.89 | 57.62 | 67.88 | 76.900000000000006 | 82.37 | 88.49 | 93.97 | 96.91 | 98.05 | 98.05 | 99.54 | 99.54 | 0 | 0 | 0 | 57600 | 0 | 0 | 23100 | 0 | 0 | No | 85.399999999999991 | 86.48 | -1.0800000000000125 | Good Progress | 7.6499999999999986 | 12.490000000000002 | 9.509999999999998 | 7.490000000000002 | 7.5 | 5.5 | 6.5 | 1.0999999999999943 | 0 | 3.9000000000000057 | 0 | 2 | 5.3033333333333337 | 4.0523713659223342 | 730 | 0.99863013698630132 | 1.0000000000000364 | 3.3333333333334547E-2 | 1.36986301369868E-3 | 0.06 | 4584706.7622000007 | 137541202.86599502 | 5272412.7779999999 | 158172383.33999425 | 5.9999999999997812E-2 | 1.7999999999999343 | 5272412.7779998071 | -5.8630136986301318E-2 | أخرى | 84.358604448000008 | 87.469327987020009 | 3.1107235390200003 | 0.96460000000000001 | No | 45382 | Out | 45359 | within time | 31 | 54 | Within Time | 39.250135528333338 | 48.083491221666655 | 0 | 0 | 0 | 87.333626749999993 | 50.38635 | 0.65940553165265203 | 0.90698068078008476 | 5.893013698630134E-2 | 106.00999999999999 | -9.0999999999999943 | R | 3.54 | Regular | R | أخرى | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 36 | AP356 | 26/25/2/1/AP356/1 | مشروع تنفيذ خطوط مياه ومحطة ضخ لتغذية مستشفى مكة المكرمة 500 سرير | الغربي | وحدة عمل مكة | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45722 | 46271 | 0.76502732240437155 | 5599655 | 5.5996550000000003 | 6439603.25 | 6.4396032500000002 | 0 | 6.4396032500000002 | لا | تحت التنفيذ | متقدم | مؤسسة غدير مكة | شركة بيت الخبرة للاستشارات الهندسية | جاري | 46985 | 0 | 0.60291438979963574 | 0.6539162112932605 | 0.7103825136612022 | 0.76502732240437155 | 0.82149362477231325 | 0.87613843351548271 | 0.93260473588342441 | 0.98907103825136611 | 1.0437158469945356 | 1.1001821493624773 | 1.1548269581056467 | 1.2112932604735884 | Null | 0 | 0 | 0 | 0 | 0 | 7.31 | 17.43 | 21.75 | 22.53 | 35.130000000000003 | 47.31 | 49.3 | 53.33 | 53.33 | 66.02 | 66.02 | 0 | 0 | 0.63 | 1.92 | 10.41 | 16.16 | 17.059999999999999 | 22.5 | 28.6 | 37.090000000000003 | 42.52 | 52.24 | 52.24 | 65.89 | 65.89 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | مشاريع مكة المكرمة | No | 28.6 | 35.130000000000003 | -6.5300000000000011 | Good Progress | 0 | 0 | 7.31 | 10.120000000000001 | 4.32 | 0.78000000000000114 | 12.600000000000001 | 12.18 | 1.9899999999999949 | 4.0300000000000011 | 0 | 12.689999999999998 | 5.501666666666666 | 0.30807435258333332 | 549 | 0.76502732240437155 | 129.00000000000003 | 4.3000000000000007 | 0.23497267759562845 | 0.4667 | 2613358.9885000004 | 607757.90430232557 | 3005362.8367750002 | 698921.58994767431 | 3.6178294573643403E-3 | 0.1085348837209302 | 23297.386331589143 | 7.2564957805907179E-3 | -0.23172732240437155 | المشاريع الاستراتيجية | المشاريع الحرجة | نعم | 4.2514260656499996 | 4.2430545814250005 | -8.371484224999115E-3 | 1.0012999999999999 | No | 45707 | within time | 45666 | within time | 15 | 56 | Within Time | 2.4885800095833335 | 2.6683852404166668 | 0 | 0 | 0 | 5.1569652500000007 | 3684491.44 | 1.168817 | 0.20873018069863231 | 0.47408956801198482 | 0.39412732240437154 | 63.814999999999998 | -21.294999999999995 | R | -0.13 | Regular | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 37 | NA-00087 | 27/23/2/04/0005/1 | عقد انشاء خلايا مطمر الحمأة الجديد بمنطقه عشيره حسب اشتراطات الالتزام البيئي | الغربي | وحدة عمل الطائف | مشاريع الحزمة الأولى | صرف | محطات معالجة صرف صحي | 45621 | 45986 | 1.4273972602739726 | 25715892 | 25.715892 | 29573275.800000001 | 29.573275800000001 | 0 | 29.573275800000001 | نعم | منجز في تاريخه | 46053 | 46053 | لا | استلام ابتدائي | استلام ابتدائي | شركة سعودي بناء للمقاولات العامة | شركة بيت الخبرة للاستشارات الهندسية | جاري | 46985 | 0 | 1.1835616438356165 | 1.2602739726027397 | 1.3452054794520547 | 1.4273972602739726 | 1.5123287671232877 | 1.5945205479452054 | 1.6794520547945206 | 1.7643835616438357 | 1.8465753424657534 | 1.9315068493150684 | 2.0136986301369864 | 2.0986301369863014 | Time Overrun | 0 | 0 | 0.38 | 5.49 | 12.26 | 13.54 | 33.200000000000003 | 41.57 | 49.27 | 62.48 | 71.66 | 78.42 | 88.38 | 88.38 | 88.38 | 88.38 | 88.38 | 88.38 | 88.38 | 0 | 0.86 | 5.49 | 13.28 | 18.16 | 33.19 | 48.65 | 63.59 | 76.44 | 86.53 | 92.32 | 96.2 | 100 | 100 | 100 | 100 | 100 | 100 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | منجز حسب الخطة | ضمن الخطة الأساسية | No | 96.2 | 88.38 | 7.8200000000000074 | Good Progress | 19.660000000000004 | 8.3699999999999974 | 7.7000000000000028 | 13.209999999999994 | 9.18 | 6.7600000000000051 | 9.9599999999999937 | 0 | 0 | 0 | 0 | 0 | 6.2366666666666655 | 1.6038144643999996 | 365 | 1.4273972602739726 | -156 | -5.2 | -0.42739726027397262 | 0.11620000000000004 | 2988186.6504000016 | -574651.27892307716 | 3436414.6479600011 | -660848.9707615386 | -7.4487179487179515E-4 | -2.2346153846153852E-2 | -22028.299025384626 | 1.7550539419087143E-3 | -0.5435972602739727 | المشاريع الاستراتيجية | نعم | 26.136861152040002 | 29.573275800000001 | 3.4364146479599995 | 0.88380000000000003 | No | 45598 | Out | 45574 | within time | 23 | 47 | Within Time | 25.586793800000002 | 0 | 0 | 0 | 0 | 25.586793800000002 | 19.078818999999999 | 0.74190772771949731 | 0.89040599085422478 | 0.42739726027397262 | 107.08999999999999 | -7.0899999999999892 | Troubled | 11.62 | Delayed | Troubled | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 38 | AP41 | 01/23/2/01/0054/1 | عقد استكمال تنفيذ مشاريع المياه بمحافظة وادي الدواسر | الأوسط | منطقة الرياض | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45722 | 46440 | 0.58495821727019504 | 10535325 | 10.535325 | 12115623.75 | 12.115623749999999 | 0 | 12.115623749999999 | لا | متوقع تعثره (مدة منقضية) | تحت التنفيذ | منتظم | شركة العرض الانشائي للمقاولات شركة شخص واحد | مكتب الياردة للاستشارات الهندسية | جاري | 46984 | 0 | 0.46100278551532031 | 0.5 | 0.54317548746518107 | 0.58495821727019504 | 0.628133704735376 | 0.66991643454038996 | 0.71309192200557103 | 0.75626740947075211 | 0.79805013927576607 | 0.84122562674094703 | 0.88300835654596099 | 0.92618384401114207 | Null | متوقع تعثره (مدة منقضية) | 0 | 0 | 0 | 0 | 0 | 4.59 | 14.35 | 27.47 | 35.75 | 42.26 | 48.04 | 53.08 | 54.09 | 54.09 | 54.09 | 54.09 | 0 | 0 | 0.75 | 4.9400000000000004 | 11.19 | 18.059999999999999 | 27.94 | 36.799999999999997 | 45.92 | 47.87 | 54.16 | 60.39 | 60.39 | 75.099999999999994 | 54.09 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 45.92 | 42.26 | 3.6600000000000037 | Good Progress | 0 | 0 | 4.59 | 9.76 | 13.12 | 8.2800000000000011 | 6.509999999999998 | 5.7800000000000011 | 5.0399999999999991 | 1.0100000000000051 | 0 | 0 | 4.5075000000000003 | 0.47487977437500006 | 718 | 0.58495821727019504 | 297.99999999999994 | 9.9333333333333318 | 0.41504178272980496 | 0.45909999999999995 | 4836767.7074999996 | 486922.92357382551 | 5562282.8636249993 | 559961.36210989929 | 1.5406040268456378E-3 | 4.6218120805369127E-2 | 18665.378736996649 | 1.6847149779735681E-2 | -4.4058217270194988E-2 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 168 | نعم | نعم | 6.5533408863750005 | 6.5533408863750005 | 0 | 1 | No | 45718 | within time | 45656 | Out | 4 | 66 | Within Time | 4.7487977437500009 | 3.8517129862499981 | 0 | 0 | 0 | 8.6005107299999999 | 505062.20187496173 | 2.8876719999999998 | 0.27409424958413714 | 0.48172036782729016 | 0.10625821727019508 | 61.5625 | -7.4025000000000034 | R | 0 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 39 | O403 | 7/25/2/1/O403/1 | مشروع استكمال مرحلة 3 - د من مراحل استكمال مشروع مياه القرى الشامل بمنطقة حائل | الشمالي | منطقة حائل | عامة | مياه | خطوط وشبكات | 45805 | 46354 | 0.61384335154826963 | 27316430.699999999 | 27.316430699999998 | 31413895.309999999 | 31.413895309999997 | 0 | 31.413895309999997 | نعم | 46387 | نعم | تحت التنفيذ | متقدم | شركة الإعمار التطويرية | شركة عبدالله عبدالرحمن السعيد للاستشارات الهندسية شركة مهنية شخص واحد | جاري | 46999 | 0 | 0.45173041894353372 | 0.50273224043715847 | 0.55919854280510017 | 0.61384335154826963 | 0.67030965391621133 | 0.72495446265938068 | 0.78142076502732238 | 0.83788706739526408 | 0.89253187613843354 | 0.94899817850637525 | 1.0036429872495447 | 1.0601092896174864 | Null | 0 | 0 | 0 | 0 | 15.6 | 24.2 | 35.200000000000003 | 43 | 50 | 55 | 61.5 | 61.5 | 75 | 75 | 0 | 0 | 1.01 | 4.7300000000000004 | 9.1199999999999992 | 15.92 | 23.41 | 31.26 | 40.299999999999997 | 40.299999999999997 | 56.91 | 56.91 | 0 | 0 | 3400 | 13750 | No | 15.92 | 43 | -27.08 | Good Progress | 0 | 0 | 0 | 15.6 | 8.6 | 11.000000000000004 | 7.7999999999999972 | 7 | 5 | 6.5 | 0 | 13.5 | 6.25 | 1.7072769187499999 | 549 | 0.61384335154826963 | 211.99999999999997 | 7.0666666666666655 | 0.38615664845173037 | 0.38500000000000001 | 10516825.819499999 | 1488230.06879717 | 12094349.694349999 | 1711464.579389151 | 1.816037735849057E-3 | 5.4481132075471707E-2 | 57048.819312971711 | 5.5008607198748036E-3 | 1.1566484517303577E-3 | ميزانية عامة | 23.560421482499997 | 17.877647820920998 | -5.6827736615789988 | 1.1809000000000001 | No | 45795 | within time | 45687 | Out | 10 | 118 | Within Time | 13.999670733750001 | 14.400599576249995 | 0 | 0 | 0 | 28.400270309999996 | 18.579657999999998 | 0.68016419143662132 | 0.50342411053088942 | 0.37974335154826966 | 68.75 | -37.489999999999995 | R | -18.09 | Regular | R | ميزانية عامة | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 40 | 10224 | 26/23/2/02/0006/1 | إنشاء وتخفيض شبكة تخفيض منسوب المياه السطحية الخاصة ببرنامج مكافحة حمى الضنك بمحافظة جدة لأحياء (البحرة). | الغربي | وحدة عمل مكة | مشاريع المدن الساحلية | صرف | خطوط وشبكات | 45309 | 46040 | 1.1395348837209303 | 163251000 | 163.251 | 187738650 | 187.73865000000001 | 0 | 187.73865000000001 | نعم | 46295 | نعم | متوقع تعثره (مدة منقضية) | إيقاف جزئي | متأخر | شركة بن عميرة للمقاولات | شركة بيت الخبرة للاستشارات الهندسية | جاري | 46985 | 0 | 1.0177838577291383 | 1.0560875512995895 | 1.0984952120383038 | 1.1395348837209303 | 1.1819425444596443 | 1.2229822161422708 | 1.265389876880985 | 1.3077975376196991 | 1.3488372093023255 | 1.3912448700410396 | 1.4322845417236663 | 1.4746922024623803 | Null | متوقع تعثره (مدة منقضية) | 45866 | Other Projects Interference | 0 | 0.17799999999999999 | 0.46 | 0.80600000000000005 | 1.752 | 1.93 | 2.2829999999999999 | 2.2829999999999999 | 8.2200000000000006 | 13.39 | 21.19 | 31.06 | 38.229999999999997 | 43.56 | 48 | 53.99 | 60.39 | 61.84 | 63.58 | 69.53 | 78.400000000000006 | 84.32 | 85 | 85 | 85 | 85 | 85 | 85 | 0 | 0.95 | 1.7 | 2.79 | 4 | 4.79 | 6.26 | 6.26 | 13.21 | 18.37 | 25.29 | 33.659999999999997 | 40.74 | 46.71 | 52.58 | 58.78 | 65.010000000000005 | 70.69 | 77.05 | 83.19 | 88.35 | 94.27 | 96.63 | 99.74 | 100 | 100 | 100 | 100 | 0 | 0 | 0 | 0 | 0 | 0 | 49120 | 0 | 0 | No | 68.97999999999999 | 63.129999999999995 | 5.8499999999999943 | Good Progress | 5.990000000000002 | 6.3999999999999986 | 1.4500000000000028 | 1.7399999999999949 | 5.9500000000000028 | 8.8700000000000045 | 5.9199999999999875 | 0.68000000000000682 | 0 | 0 | 0 | 0 | 3.0833333333333335 | 5.0335725 | 731 | 1.1395348837209303 | -102.00000000000001 | -3.4000000000000004 | -0.13953488372093026 | 0.15 | 24487650 | -7202249.9999999991 | 28160797.5 | -8282587.4999999991 | -1.4705882352941174E-3 | -4.4117647058823525E-2 | -276086.24999999994 | -0.28953488372093028 | مشاريع التحول الوطني | 159.57785250000001 | 187.73865000000001 | 28.160797500000001 | 0.85 | No | 45299 | within time | 45252 | within time | 10 | 57 | Within Time | 50.335724999999996 | 128.90936300000001 | 0 | 0 | 0 | 179.24508800000001 | 112.80857 | 0.6910130412677411 | 0.85591448068362286 | 0.17323488372093032 | 94.25 | 5.4899999999999949 | R | 15 | Delayed | R | مشاريع التحول الوطني | ||||||||||||||||||||||||||||||||||||||||||||||||||||
| 41 | 10236 | 01/23/2/02/0027/1 | تنفيذ شبكات الصرف الصحي بمحافظة الزلفي ( المرحلة الخامسة ) | الأوسط | منطقة الرياض | عامة | صرف | خطوط وشبكات | 45424 | 46269 | 0.84970414201183431 | 24590000 | 24.59 | 28278500 | 28.278500000000001 | 0 | 28.278500000000001 | نعم | 46356 | نعم | جاري الإستلام الإبتدائي | متقدم | شركة ماءك للمقاولات | مكتب الياردة للاستشارات الهندسية | جاري | 46984 | 0 | 0.74437869822485203 | 0.77751479289940828 | 0.81420118343195269 | 0.84970414201183431 | 0.88639053254437872 | 0.92189349112426033 | 0.95857988165680474 | 0.99526627218934915 | 1.0307692307692307 | 1.0674556213017752 | 1.1029585798816568 | 1.1396449704142011 | Null | 0 | 0 | 0 | 0 | 2.04 | 2.04 | 8.49 | 13.12 | 16.71 | 21.26 | 25.06 | 28.95 | 31.54 | 35.01 | 38.08 | 40.85 | 46.08 | 53.47 | 60.85 | 66.569999999999993 | 71.260000000000005 | 74.27 | 76.88 | 76.88 | 82.06 | 82.06 | 0 | 0 | 0 | 1.1950000000000001 | 1.1950000000000001 | 9.19 | 13.592000000000001 | 18.202999999999999 | 23.265000000000001 | 28.14 | 34.130000000000003 | 39.15 | 43.22 | 49.13 | 55.36 | 43.83 | 50.17 | 55.87 | 62.5 | 69.510000000000005 | 72.61 | 75.95 | 75.95 | 83 | 72.45 | 0 | 0 | 0 | 0 | 0 | 0 | 28653 | 0 | 0 | No | 44.296999999999997 | 49.859999999999992 | -5.5629999999999953 | Good Progress | 3.4699999999999989 | 3.0700000000000003 | 2.7700000000000031 | 5.2299999999999969 | 7.3900000000000006 | 7.3800000000000026 | 5.7199999999999918 | 4.6900000000000119 | 3.0099999999999909 | 2.6099999999999994 | 0 | 5.1800000000000068 | 4.21 | 1.035239 | 845 | 0.84970414201183431 | 127.00000000000001 | 4.2333333333333334 | 0.15029585798816569 | 0.23120000000000004 | 5685208.0000000009 | 1342962.5196850395 | 6537989.2000000011 | 1544406.8976377954 | 1.820472440944882E-3 | 5.4614173228346462E-2 | 51480.229921259845 | 3.6295913978494632E-3 | -8.0904142011834351E-2 | ميزانية عامة | 23.205337100000001 | 20.48777325 | -2.7175638500000012 | 1.0961000000000001 | No | 45418 | within time | 45364 | within time | 6 | 60 | Within Time | 9.2909216666666659 | 18.193876333333336 | 0 | 0 | 0 | 27.484798000000001 | 19.474768999999998 | 0.79197921919479453 | 0.71828869721577404 | 0.15460414201183426 | 83.89 | -11.280000000000001 | R | -9.61 | Regular | R | ميزانية عامة | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 42 | NA-00119 | 25/24/02/11/NA-00119/1 | مشروع تصميم وتنفيذ ربط مشروع وسط جدة بخدمة المياه | الغربي | وحدة عمل جدة | على حساب جهات أخرى ( حكومية / خاصة) | مياه | خطوط وشبكات | 45678 | 46224 | 0.8498168498168498 | 16840000 | 16.84 | 19366000 | 19.366 | 0 | 19.366 | نعم | 46295 | نعم | متوقع تعثره (مدة منقضية) | تحت التنفيذ | منتظم | شركة صرح الحديثة للمقاولات | شركة بيت الخبرة للاستشارات الهندسية | جاري | 46985 | 0 | 0.68681318681318682 | 0.73809523809523814 | 0.79487179487179482 | 0.8498168498168498 | 0.90659340659340659 | 0.96153846153846156 | 1.0183150183150182 | 1.075091575091575 | 1.13003663003663 | 1.1868131868131868 | 1.2417582417582418 | 1.2985347985347986 | Null | متوقع تعثره (مدة منقضية) | 0 | 0 | 0 | 0 | 0 | 3.26 | 6.15 | 10.26 | 17.84 | 21.75 | 30.92 | 38.85 | 45.95 | 51 | 65.62 | 65.62 | 78.34 | 78.34 | 0 | 0 | 3.01 | 4.5599999999999996 | 6.87 | 10.86 | 15.58 | 21.28 | 25.37 | 30.79 | 38.380000000000003 | 46.62 | 55.73 | 65.19 | 65.19 | 80.569999999999993 | 80.569999999999993 | 0 | 0 | 0 | 0 | 0 | 0 | 4280 | 0 | 0 | No | 38.380000000000003 | 38.85 | -0.46999999999999886 | Good Progress | 3.26 | 2.8900000000000006 | 4.1099999999999994 | 7.58 | 3.91 | 9.1700000000000017 | 7.93 | 7.1000000000000014 | 5.0499999999999972 | 14.620000000000005 | 0 | 12.719999999999999 | 6.5283333333333333 | 1.0993713333333333 | 546 | 0.8498168498168498 | 82.000000000000014 | 2.7333333333333338 | 0.1501831501831502 | 0.34379999999999994 | 5789591.9999999991 | 2118143.4146341458 | 6658030.7999999989 | 2435864.9268292673 | 4.1926829268292666E-3 | 0.12578048780487799 | 81195.497560975578 | 6.910379999999999E-3 | -0.19361684981684973 | أخرى | 15.171324400000001 | 15.603186199999998 | 0.43186179999999652 | 0.97770000000000024 | No | 45664 | within time | 45637 | within time | 14 | 41 | Within Time | 9.2086733333333353 | 9.8739146666666642 | 0 | 0 | 0 | 19.082588000000001 | 5.0678840000000003 | 0.3009432304038005 | 0.46088700825114248 | 0.38361684981684985 | 65.534999999999997 | -9.8049999999999997 | R | 2.23 | Regular | R | أخرى | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 43 | AP1038-5 | 05/23/1/03/0015/1 | اتفاقية الخدمات الهندسية الاستشارية لإعداد الدراسات والتصاميم لمشاريع المياه والصرف الصحي بالقطاع الشرقي عقد (1) | الشرقي | المنطقة الشرقية | مشاريع الحزمة الأولى | استشاري | تصميم | 45329 | 46425 | 0.74178832116788318 | 102031777.13 | 102.03177712999999 | 117336543.7 | 117.33654370000001 | 0 | 117.33654370000001 | لا | تحت التنفيذ | استشاري | شركة دار الهندسة للتصميم و الإستشارات الهندسية | 0 | إتفاقية | 0.66058394160583944 | 0.68613138686131392 | 0.71441605839416056 | 0.74178832116788318 | 0.77007299270072993 | 0.79744525547445255 | 0.8257299270072993 | 0.85401459854014594 | 0.88138686131386856 | 0.90967153284671531 | 0.93704379562043794 | 0.96532846715328469 | Null | 0 | 0 | 0 | 0 | 0 | 27.15 | 27.15 | 87 | 87 | 87 | 87 | 69 | 69 | 69 | 0 | 0 | 0 | 0 | 0 | 78.84 | 96.4 | 96.63 | 96.8 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 0 | 0 | 0 | 25.75 | 25.75 | 93 | 93 | 93 | 93 | 80 | 80 | 80 | 0 | 0 | 0 | 0 | 0 | 46.44 | 97.3 | 97.44 | 97.59 | 97.74 | 97.89 | 98.04 | 98.19 | 98.19 | 98.47 | 98.47 | استشاري عالمي تصميم | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 17.739999999999995 | 31 | -13.260000000000005 | Good Progress | 0 | 0 | 78.84 | 17.560000000000002 | 0.22999999999998977 | 0.17000000000000171 | 3.2000000000000028 | 0 | 0 | 0 | 0 | 0 | 8.3333333333333339 | 8.5026480941666662 | 1096 | 0.74178832116788318 | 283.00000000000006 | 9.4333333333333353 | 0.25821167883211682 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.25821167883211682 | المشاريع الاستراتيجية | نعم | 117.33654370000001 | 115.54129458139001 | -1.7952491186100019 | 1.0153000000000001 | No | 45294 | Out | 45259 | Out | 35 | 70 | No | 85.026480941666676 | 29.39848275833333 | 0 | 0 | 0 | 114.42496370000001 | 77.938247000000004 | 0.76386248669076773 | 1.0076974225905186 | -0.23711167883211681 | 125 | -26.959999999999994 | R | -1.53 | Regular | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||
| 44 | NA-00176 | 24/25/2/1/NA-00176/1 | عقد تحويل مسار خطوط المياه المتعارضة مع مشروع وزارة النقل بطريق خريص القديم | الأوسط | وحدة عمل الرياض | على حساب جهات أخرى ( حكومية / خاصة) | مياه | خطوط وشبكات | 45847 | 46089 | 1.21900826446281 | 17826500 | 17.826499999999999 | 20500475 | 20.500475000000002 | 0 | 20.500475000000002 | نعم | 46173 | نعم | متوقع تعثره (مدة منقضية) | تحت التنفيذ | متأخر | شركة نظم البيئة للمقاولات | مكتب الياردة للاستشارات الهندسية | جاري | 46984 | 0 | 0.85123966942148765 | 0.96694214876033058 | 1.0950413223140496 | 1.21900826446281 | 1.3471074380165289 | 1.4710743801652892 | 1.5991735537190082 | 1.7272727272727273 | 1.8512396694214877 | 1.9793388429752066 | 2.1033057851239669 | 2.2314049586776861 | Null | متوقع تعثره (مدة منقضية) | 0 | 0 | 0 | 17.88 | 36.28 | 42.61 | 56.63 | 77.45 | 77.7 | 77.7 | 80.22 | 80.22 | 0 | 5.25 | 18.63 | 35.869999999999997 | 57.02 | 72.569999999999993 | 86.67 | 86.67 | 100 | 100 | 0 | 0 | 0 | 930 | No | 35.869999999999997 | 42.61 | -6.740000000000002 | Good Progress | 0 | 0 | 0 | 0 | 17.88 | 18.400000000000002 | 6.3299999999999983 | 14.020000000000003 | 20.82 | 0.25 | 0 | 2.519999999999996 | 6.6849999999999996 | 1.1917015249999998 | 242 | 1.21900826446281 | -53.000000000000014 | -1.7666666666666671 | -0.21900826446280997 | 0.22299999999999998 | 3975309.4999999995 | -2250175.1886792444 | 4571605.9249999998 | -2587701.4669811316 | -4.2075471698113194E-3 | -0.12622641509433957 | -86256.715566037703 | 1.3128225806451614E-2 | -0.44200826446280994 | أخرى | 16.445481045000001 | 20.500475000000002 | 4.0549939550000005 | 0.80220000000000002 | No | 45840 | within time | 45788 | within time | 7 | 59 | Within Time | 11.542658750000001 | 5.95835325 | 0 | 0 | 0 | 17.501012000000003 | 13.888857 | 0.77911294982189438 | 0.57074676193290841 | 0.64880826446280992 | 76.685000000000002 | -4.1150000000000091 | R | 19.78 | Delayed | EL | أخرى | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 45 | NA-00136 | 5/25/2/2/NA-00136/1 | مشروع ايصال خدمات الصرف الصحي لمشروع إستاد الدمام الجديد في المدينة الرياضية (أرامكو) | الشرقي | المنطقة الشرقية | على حساب جهات أخرى ( حكومية / خاصة) | صرف | خطوط وشبكات | 45839 | 46023 | 1.6467391304347827 | 2281107.4500000002 | 2.2811074500000004 | 2623273.56 | 2.6232735599999999 | 0 | 2.6232735599999999 | نعم | 46112 | نعم | استلام ابتدائي | استلام ابتدائي | شركة نبراس المتحدة للمقاولات | شركة الخدمات الهندسية والفنية للإستشارات المهنية | جاري | 46996 | 0 | 1.1630434782608696 | 1.3152173913043479 | 1.4836956521739131 | 1.6467391304347827 | 1.8152173913043479 | 1.9782608695652173 | 2.1467391304347827 | 2.3152173913043477 | 2.4782608695652173 | 2.6467391304347827 | 2.8097826086956523 | 2.9782608695652173 | Time Overrun | 0 | 0 | 3.05 | 26.14 | 44.86 | 60.37 | 75.86 | 75.86 | 75.86 | 75.86 | 75.86 | 75.86 | 4.0999999999999996 | 19.96 | 36.58 | 58.26 | 83.62 | 100 | 100 | 100 | 100 | 100 | 0 | 0 | 0 | 2630 | No | 58.26 | 60.37 | -2.1099999999999994 | Good Progress | 0 | 0 | 0 | 3.05 | 23.09 | 18.72 | 15.509999999999998 | 15.490000000000002 | 0 | 0 | 0 | 0 | 6.3216666666666663 | 0.14420400929750002 | 184 | 1.6467391304347827 | -119.00000000000001 | -3.9666666666666672 | -0.64673913043478271 | 0.2414 | 550659.33843 | -138821.68195714284 | 633258.23738400009 | -159644.93379428572 | -2.0285714285714282E-3 | -6.0857142857142853E-2 | -5321.4977931428566 | 3.1729359129383313E-3 | -0.88813913043478276 | أخرى | نعم | 1.9900153226159998 | 2.6232735599999999 | 0.63325823738400011 | 0.75859999999999994 | No | 45839 | within time | 45827 | within time | 0 | 12 | Within Time | 3.4578199999999999 | 0 | 0 | 0 | 0 | 3.4578199999999999 | 2.0528629999999999 | 0.89994138592638395 | 0.7654889518826864 | 0.81053913043478265 | 94.825000000000003 | 5.1749999999999972 | Troubled | 24.14 | Delayed | SV | أخرى | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 46 | NA-00107 | 06/23/2/01/0069/1 | تنفيذ خطوط فرعية للمياه باحياء متفرقة بغرب مدينة ابها المرحلة الاولى | الجنوبي | منطقة عسير | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45630 | 46043 | 1.2397094430992737 | 4311900 | 4.3118999999999996 | 4958685 | 4.958685 | 0 | 4.958685 | نعم | منجز في تاريخه | 46112 | 46081 | نعم | ضمن المتعثر خلال العام 2026 | استلام ابتدائي | استلام ابتدائي | شركة كنز المعمار للمقاولات شخص واحد | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | 0 | تم معالجته | 1.0242130750605327 | 1.0920096852300243 | 1.1670702179176755 | 1.2397094430992737 | 1.3147699757869249 | 1.387409200968523 | 1.4624697336561743 | 1.5375302663438257 | 1.6101694915254237 | 1.6852300242130751 | 1.757869249394673 | 1.8329297820823245 | Null | متوقع تعثره (مدة منقضية) | 0 | 0 | 0 | 3 | 9.2200000000000006 | 14.87 | 21.17 | 30.04 | 37.07 | 50.71 | 63.43 | 65.209999999999994 | 65.27 | 66.58 | 70.11 | 70.11 | 70.11 | 70.11 | 70.11 | 0 | 0 | 1.31 | 3.83 | 10.53 | 20.95 | 33.869999999999997 | 45.29 | 59.33 | 73.42 | 84.93 | 65.27 | 75.52 | 93.52 | 100 | 100 | 100 | 100 | 0 | 0 | 0 | 1680 | 0 | 0 | 10100 | 0 | 0 | منجز حسب الخطة | ضمن الخطة الأساسية | No | 65.27 | 65.27 | 0 | Good Progress | 6.3000000000000025 | 8.8699999999999974 | 7.0300000000000011 | 13.64 | 12.719999999999999 | 1.779999999999994 | 6.0000000000002274E-2 | 1.3100000000000023 | 3.5300000000000011 | 0 | 0 | 0 | 4.6033333333333335 | 0.19849112999999999 | 413 | 1.2397094430992737 | -99.000000000000028 | -3.3000000000000012 | -0.23970944309927367 | 0.2989 | 1288826.9099999999 | -390553.60909090895 | 1482150.9465000001 | -449136.65045454534 | -3.0191919191919184E-3 | -9.0575757575757559E-2 | -14971.221681818179 | 4.5369193682460512E-3 | -0.53860944309927361 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | 3.4765340535 | 4.958685 | 1.4821509465 | 0.70110000000000006 | No | 45617 | within time | 45617 | within time | 13 | 13 | Within Time | 1.9849112999999998 | 2.7498447000000001 | 0 | 0 | 0 | 4.734756 | 1723013.52 | 2.5320079999999998 | 0.58721398919269929 | 0.6697327644832527 | 0.48450944309927368 | 80.39 | 13.129999999999995 | R | 29.89 | Troubled | EL | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 47 | P353-2 | 05/23/2/02/0017/1 | مشروع استكمال مرافق الصرف الصحي بقرية العليا المرحلة الثانية - الجزء الأول | الشرقي | المنطقة الشرقية | مشاريع الحزمة الأولى | صرف | خطوط وشبكات | 45410 | 46025 | 1.1902439024390243 | 24361575 | 24.361574999999998 | 28015811.25 | 28.015811249999999 | 0 | 28.015811249999999 | لا | ضمن المتعثر خلال العام 2026 | تحت التنفيذ | متعثر | شركة ربوة التعمير راكو | شركة الخدمات الهندسية والفنية للإستشارات المهنية | جاري | 46996 | ضعف السيولة | 0 | 1.0455284552845527 | 1.0910569105691057 | 1.1414634146341462 | 1.1902439024390243 | 1.2406504065040651 | 1.2894308943089432 | 1.3398373983739837 | 1.3902439024390243 | 1.4390243902439024 | 1.4894308943089432 | 1.5382113821138212 | 1.5886178861788618 | Null | متوقع تعثره (مدة منقضية) | ضعف اّداء المقاول فني وإداري | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 4 | 7.6 | 8.08 | 13.96 | 14.98 | 21 | 22.98 | 25.54 | 26.75 | 29.36 | 32.97 | 36.44 | 48.95 | 52.01 | 53.27 | 53.93 | 54.43 | 54.43 | 54.68 | 54.68 | 0 | 0 | 0 | 2.4500000000000002 | 5.32 | 5.32 | 11.13 | 17.510000000000002 | 25.89 | 33.47 | 41.39 | 19.11 | 26.9 | 35.39 | 49.24 | 63.16 | 76.45 | 90.19 | 97.61 | 100 | 73.12 | 77.67 | 100 | 100 | 100 | 100 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 12200 | 0 | 0 | No | 74.11 | 43.93 | 30.18 | Low Progress | 2.5599999999999987 | 1.2100000000000009 | 2.6099999999999994 | 3.6099999999999994 | 3.4699999999999989 | 12.510000000000005 | 3.0599999999999952 | 1.2600000000000051 | 0.65999999999999659 | 0.5 | 0 | 0.25 | 2.6416666666666666 | 0.64355160624999996 | 615 | 1.1902439024390243 | -116.99999999999997 | -3.899999999999999 | -0.19024390243902434 | 0.45569999999999999 | 11101569.727499999 | -2846556.3403846161 | 12766805.186624998 | -3273539.7914423081 | -3.8948717948717958E-3 | -0.11684615384615386 | -109117.99304807695 | 7.9761512915129153E-3 | -0.64594390243902433 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | 15.319045591499998 | 28.015811249999999 | 12.6967656585 | 0.54679999999999995 | No | 45382 | Out | 45290 | Out | 28 | 120 | No | 6.3847627812500001 | 17.622360468749999 | 0 | 0 | 0 | 24.007123249999999 | 12906884.242875 | 8.0301050000000007 | 0.32962175064625343 | 0.53446170201872789 | 0.45904390243902427 | 61.195 | 16.475000000000001 | R | 45.32 | Troubled | Troubled | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||
| 48 | 10177 | 26/22/2/12/0004/1 | تنفيذ خط الصرف الصحي الناقل الرئيسي على طريق جدة القديم لخدمة مشروع مسار - الشمالي | الغربي | وحدة عمل مكة | على حساب جهات أخرى ( حكومية / خاصة) | صرف | خطوط وشبكات | 45292 | 46023 | 1.1627906976744187 | 64200000 | 64.2 | 73830000 | 73.83 | 0 | 73.83 | نعم | 46295 | نعم | متوقع تعثره (مدة منقضية) | إيقاف جزئي | متأخر | شركة بن عميرة للمقاولات | شركة بيت الخبرة للاستشارات الهندسية | جاري | 46985 | 0 | 1.0410396716826265 | 1.0793433652530779 | 1.121751025991792 | 1.1627906976744187 | 1.2051983584131327 | 1.2462380300957592 | 1.2886456908344732 | 1.3310533515731875 | 1.3720930232558139 | 1.414500683994528 | 1.4555403556771547 | 1.4979480164158687 | Null | متوقع تعثره (مدة منقضية) | اسباب خاصة بالمقاول | ضعف آداء المقاول | ضعف آداء مقاول | •تعثر المقاول بسبب ضعف الاداء وجارى اصدار الانذار النهائى وفى حال عدم تحسن أداء المقاول خلال فترة الانذار النهائى سيتم استكمال الاجراءات النظامية حيال سحب المشروع. | صدر خطاب انذار نهائى للمقاول وقدم المقاول خطة تصحيحية وتم استكمال التوريدات - جاري تمديد العقد 156 يوم مقابل تغيير المسار والايقاف الجزئي | تكثيف الجهود مع المقاول لخروج المشروع من التعثر | اعادة جدولة الاعمال المتبقية | إجراءات خاصة بالمقاول | 45921 | V.Order | 0 | 0 | 0 | 0 | 2.0299999999999998 | 2.0699999999999998 | 2.13 | 2.13 | 18.5 | 23.18 | 32 | 39.5 | 49.5 | 50.5 | 53.44 | 58.34 | 58.44 | 59 | 63.1 | 72 | 76 | 79 | 82.06 | 83.22 | 83.22 | 83.22 | 83.22 | 83.22 | 0 | 0 | 0.94 | 2.36 | 5.38 | 5.38 | 7.03 | 7.03 | 26.54 | 31.97 | 41.58 | 48.96 | 59.39 | 64.430000000000007 | 72.400000000000006 | 82.44 | 82.81 | 82.89 | 86.34 | 91.74 | 94.19 | 98.42 | 99.94 | 100 | 100 | 100 | 100 | 100 | 0 | 0 | 0 | 0 | 0 | 0 | 3547 | 0 | 0 | No | 56.84 | 47 | 9.8400000000000034 | Good Progress | 4.9000000000000057 | 9.9999999999994316E-2 | 0.56000000000000227 | 4.1000000000000014 | 8.8999999999999986 | 4 | 3 | 3.0600000000000023 | 1.1599999999999966 | 0 | 0 | 0 | 2.4816666666666669 | 1.5932300000000004 | 731 | 1.1627906976744187 | -119.00000000000004 | -3.9666666666666681 | -0.16279069767441867 | 0.1678 | 10772760 | -2715821.848739495 | 12388674 | -3123195.1260504192 | -1.410084033613445E-3 | -4.2302521008403343E-2 | -104106.50420168064 | 3.6356666666666664E-3 | -0.33059069767441868 | أخرى | 61.441325999999997 | 73.83 | 12.388674000000002 | 0.83219999999999994 | No | 45279 | within time | 45230 | Out | 13 | 62 | Within Time | 15.932300000000003 | 57.897699999999993 | 0 | 0 | 0 | 73.83 | 46.627606999999998 | 0.72628671339563855 | 0.82660351147631428 | 0.16339069767441872 | 89.504999999999995 | 10.495000000000005 | R | 16.78 | Delayed | R | أخرى | |||||||||||||||||||||||||||||||||||||||||||
| 49 | O1000 | 09/23/2/11/0002/1 | تنفيذ مشروع نقل المياه الى عدد من الاودية بمحافظتي المخواة وقلوة بمنطقة الباحة | الجنوبي | منطقة الباحة | عامة | مياه | خطوط وشبكات | 45432 | 46290 | 0.82750582750582746 | 135894126.40000001 | 135.8941264 | 156278245.38999999 | 156.27824539 | 0 | 156.27824539 | نعم | 46356 | نعم | تحت التنفيذ | منتظم | شركة صرح الحديثة للمقاولات | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | 0 | 0.72377622377622375 | 0.75641025641025639 | 0.79254079254079257 | 0.82750582750582746 | 0.86363636363636365 | 0.89860139860139865 | 0.93473193473193472 | 0.97086247086247091 | 1.0058275058275059 | 1.0419580419580419 | 1.0769230769230769 | 1.1130536130536131 | Null | 0 | 0 | 0 | 0 | 0.76 | 0.76 | 2.2200000000000002 | 4 | 7.5 | 18.75 | 19.010000000000002 | 19.13 | 19.559999999999999 | 22.88 | 33 | 35.200000000000003 | 40.5 | 45.12 | 50 | 55.66 | 58.28 | 60.5 | 64.2 | 64.2 | 72 | 72 | 0 | 0 | 0 | 0 | 0 | 6.0999999999999999E-2 | 0.76200000000000001 | 1.79 | 2.7509999999999999 | 12.53 | 17.03 | 23.81 | 30.81 | 29.42 | 34.99 | 39.69 | 48.61 | 58.36 | 65.61 | 58.22 | 61.87 | 68.53 | 68.53 | 79.680000000000007 | 79.680000000000007 | 0 | 0 | 0 | 36000 | 0 | 30000 | 32300 | 0 | 0 | No | 63.82 | 48.16 | 15.660000000000004 | Low Progress | 3.3200000000000003 | 10.120000000000001 | 2.2000000000000028 | 5.2999999999999972 | 4.6199999999999974 | 4.8800000000000026 | 5.6599999999999966 | 2.6200000000000045 | 2.2199999999999989 | 3.7000000000000028 | 0 | 7.7999999999999972 | 4.37 | 5.93857332368 | 858 | 0.82750582750582746 | 148.00000000000003 | 4.9333333333333345 | 0.17249417249417254 | 0.35799999999999998 | 48650097.251199998 | 9861506.1995675657 | 55947611.849619992 | 11340732.131679725 | 2.4189189189189183E-3 | 7.2567567567567562E-2 | 378024.40438932419 | -0.18550582750582745 | ميزانية عامة | 112.52033668079999 | 124.522505926752 | 12.002169245952018 | 0.92319999999999991 | No | 45421 | within time | 45400 | within time | 11 | 32 | Within Time | 50.552615020800005 | 98.863420339200019 | 0 | 0 | 0 | 149.41603536000002 | 88.313659999999999 | 0.64987106021088481 | 0.58661222307341387 | 0.24530582750582752 | 71.39 | -9.5200000000000031 | R | 7.68 | Delayed | R | ميزانية عامة | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 50 | P1644-1 | 01/23/2/12/0028/1 | عقد تنفيذ خط الصرف الصحي لخدمة احياء شمال وغرب مدينة السيح (1) | الأوسط | منطقة الرياض | مشاريع الحزمة الأولى | صرف | خطوط وشبكات | 45406 | 46419 | 0.72655478775913129 | 35945300 | 35.945300000000003 | 41337095 | 41.337094999999998 | 0 | 41.337094999999998 | لا | متوقع تعثره (مدة منقضية) | تحت التنفيذ | منتظم | شركة فداك العالمية للمقاولات | مكتب الياردة للاستشارات الهندسية | جاري | 46984 | ضعف السيولة | 0.63869693978282327 | 0.66633761105626854 | 0.69693978282329716 | 0.72655478775913129 | 0.75715695952615991 | 0.78677196446199404 | 0.81737413622902266 | 0.84797630799605128 | 0.87759131293188553 | 0.90819348469891414 | 0.93780848963474828 | 0.9684106614017769 | Null | متوقع تعثره (مدة منقضية) | 0 | 0 | 0 | 0 | 1.41 | 5.03 | 5.03 | 17.46 | 21.01 | 21.79 | 25.96 | 30.07 | 30.8 | 30.8 | 30.8 | 36.619999999999997 | 39.299999999999997 | 39.299999999999997 | 48.07 | 55.46 | 61.79 | 67.5 | 70.48 | 75.14 | 75.14 | 81.430000000000007 | 81.430000000000007 | 0 | 0 | 0 | 0.25 | 1.873 | 1.873 | 6.8440000000000003 | 10.105 | 14.544 | 19.172000000000001 | 23.92 | 31.04 | 37.42 | 43.75 | 50.58 | 44 | 49.98 | 57.63 | 63.06 | 62 | 68.19 | 74.760000000000005 | 80.39 | 80.39 | 92.51 | 81.430000000000007 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 4200 | 0 | 0 | No | 47.456000000000003 | 40 | 7.4560000000000031 | Good Progress | 0 | 5.8199999999999967 | 2.6799999999999997 | 0 | 8.7700000000000031 | 7.3900000000000006 | 6.3299999999999983 | 5.7100000000000009 | 2.980000000000004 | 4.6599999999999966 | 0 | 6.2900000000000063 | 4.2191666666666672 | 1.5165921158333335 | 1013 | 0.72655478775913129 | 277 | 9.2333333333333325 | 0.27344521224086871 | 0.24859999999999999 | 8936001.5800000001 | 967798.00505415176 | 10276401.817 | 1112967.7058122745 | 8.9747292418772555E-4 | 2.6924187725631765E-2 | 37098.923527075807 | 2.4845212240868719E-2 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 147 | نعم | نعم | 33.660796458500002 | 33.660796458500002 | 0 | 1 | No | 45398 | within time | 45372 | within time | 8 | 34 | Within Time | 13.281788350000003 | 23.118391649999996 | 0 | 0 | 0 | 36.400179999999999 | 10434739.9235 | 18.166575000000002 | 0.50539500296283524 | 0.67842874497577099 | 4.4654787759131342E-2 | 80.157499999999999 | -5.3974999999999937 | R | 0 | Regular | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||
| 51 | O1021 | 08/23/2/01/0003/1 | استكمال مشروع انشاء شبكات مياه الشرب بقرية المعظم بتبوك | الشمالي الغربي | منطقة تبوك | عامة | مياه | خطوط وشبكات | 45433 | 46034 | 1.1797004991680533 | 5454823.9699999997 | 5.4548239699999996 | 6273047.5700000003 | 6.2730475700000001 | 3.0315167599999997 | 9.3045643299999998 | نعم | منجز في تاريخه | 46112 | 46112 | لا | متوقع تعثره (مدة منقضية) | استلام ابتدائي | استلام ابتدائي | شركة الرصف والبناء السعودية للتجارة والصناعة والمقاولات | شركة فيوتشر كونسلت للاستشارات الهندسية | جاري | 46985 | ضعف آداء المقاول | 1.0316139767054908 | 1.0782029950083194 | 1.1297836938435941 | 1.1797004991680533 | 1.2312811980033278 | 1.281198003327787 | 1.3327787021630615 | 1.3843594009983362 | 1.4342762063227954 | 1.4858569051580699 | 1.5357737104825291 | 1.5873544093178036 | Null | متوقع تعثره (مدة منقضية) | 45739 | V.Order | 0 | 0 | 0 | 0 | 2.04 | 5.83 | 7.38 | 14.6 | 18.7 | 24.12 | 26.3 | 32.65 | 33.56 | 45.25 | 69.16 | 70.12 | 83.37 | 84.17 | 85.2 | 85.32 | 90 | 90 | 90.1 | 90.1 | 0 | 0 | 0 | 0 | 0 | 3.5 | 7.6 | 12.2 | 17.8 | 8.41 | 41.27 | 49.61 | 28.52 | 35.56 | 42.57 | 55.35 | 66.47 | 77.989999999999995 | 87.77 | 100 | 100 | 100 | 100 | 100 | 100 | 0 | 0 | 0 | 3456 | 0 | 1000 | 303 | 0 | 0 | منجز حسب الخطة | No | 75.569999999999993 | 76.790000000000006 | -1.2200000000000131 | Good Progress | 6.3499999999999979 | 0.91000000000000369 | 11.689999999999998 | 23.909999999999997 | 0.96000000000000796 | 13.25 | 0.79999999999999716 | 1.0300000000000011 | 0.11999999999999034 | 4.6800000000000068 | 0 | 9.9999999999994316E-2 | 5.3166666666666664 | 0.29001480773833327 | 601 | 1.1797004991680533 | -108.00000000000004 | -3.6000000000000014 | -0.17970049916805331 | 0.1 | 545482.397 | -151522.88805555549 | 627304.75699999998 | -174251.32138888881 | -9.2592592592592564E-4 | -2.7777777777777766E-2 | -5808.3773796296282 | 2.504970178926441E-3 | -0.27970049916805328 | ميزانية عامة | نعم | 5.6520158605699997 | 6.2730475700000001 | 0.62103170943000041 | 0.90099999999999991 | No | 45414 | Out | 45355 | Out | 19 | 78 | No | 2.8956023907416668 | 3.3774451792583333 | 0 | 0 | 0 | 6.2730475700000001 | 4.4902240000000004 | 0.82316570153225321 | 0.85907158261973593 | 0.17970049916805331 | 101.15 | -1.1500000000000057 | R | 9.9 | Delayed | R | ميزانية عامة | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 52 | A16-1 | 12/24/02/01/A16-1/1 | مشروع تغذية نقاط التسليم بمناطق الإمداد المرتبطة بمحطة تنقية جازان (الماطري) من بوابة الاستلام في محلية | الجنوبي | منطقة جازان | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45659 | 46754 | 0.44109589041095892 | 4999900 | 4.9999000000000002 | 5749885 | 5.7498849999999999 | 0 | 5.7498849999999999 | لا | ضمن المتعثر خلال العام 2026 | تحت التنفيذ | متأخر | مؤسسة سماء الاتفاق للمقاولات | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | 0 | تم معالجته | 0.35981735159817352 | 0.38538812785388127 | 0.41369863013698632 | 0.44109589041095892 | 0.46940639269406392 | 0.49680365296803652 | 0.52511415525114158 | 0.55342465753424652 | 0.58082191780821912 | 0.60913242009132418 | 0.63652968036529678 | 0.66484018264840183 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 4.67 | 9.6999999999999993 | 14.8 | 25.85 | 32.79 | 35.25 | 35.25 | 39.69 | 35.479999999999997 | 35.479999999999997 | 44.74 | 44.74 | 0 | 0 | 0 | 0.56000000000000005 | 2.83 | 6.26 | 7.69 | 10.14 | 11.78 | 16.309999999999999 | 21.88 | 27.87 | 33.950000000000003 | 40.78 | 40.78 | 65.98 | 65.98 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 21.88 | 35.25 | -13.370000000000001 | Good Progress | 0 | 4.67 | 5.0299999999999994 | 5.1000000000000014 | 11.05 | 6.9399999999999977 | 2.4600000000000009 | 0 | 4.4399999999999977 | -4.2100000000000009 | 0 | 9.2600000000000051 | 3.7283333333333335 | 0.18641293833333336 | 1095 | 0.44109589041095892 | 611.99999999999989 | 20.399999999999995 | 0.55890410958904102 | 0.64520000000000011 | 3225935.4800000004 | 158134.09215686281 | 3709825.8020000006 | 181854.20598039223 | 1.0542483660130723E-3 | 3.1627450980392165E-2 | 6061.8068660130739 | 3.2806201058201069E-2 | -8.6295890410959086E-2 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 365 | نعم | نعم | 2.5724985490000001 | 3.7937741229999999 | 1.2212755739999999 | 0.78760000000000008 | No | 45650 | within time | 45650 | within time | 9 | 9 | Within Time | 1.6716332333333335 | 3.7457017666666665 | 0 | 0 | 0 | 5.4173349999999996 | 759559.80849999993 | 1.6273329999999999 | 0.32547310946218921 | 0.35365103903338735 | 0.16239589041095892 | 46.435000000000002 | -12.484999999999999 | R | 21.24 | Delayed | SV | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 53 | AP129 | 06/23/2/01/0022/1 | مشروع تنفيد خط ناقل ومحطة توزيع المياه إلى مركز العطف بشمال بيشة | الجنوبي | منطقة عسير | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45357 | 46807 | 0.54137931034482756 | 22882600 | 22.8826 | 26314990 | 26.314990000000002 | 0 | 26.314990000000002 | لا | تحت التنفيذ | منتظم | شركة سالم هادي محمد ال مبارك للمقاولات شركة شخص واحد | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | ضعف السيولة | 0.48 | 0.49931034482758618 | 0.52068965517241383 | 0.54137931034482756 | 0.56275862068965521 | 0.58344827586206893 | 0.60482758620689658 | 0.62620689655172412 | 0.64689655172413796 | 0.6682758620689655 | 0.68896551724137933 | 0.71034482758620687 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 0.13 | 0.13 | 5.43 | 9.7899999999999991 | 11.93 | 13.73 | 15.34 | 17.93 | 19.45 | 20.55 | 22.56 | 24.3 | 28.86 | 38.32 | 46.14 | 51.63 | 51.82 | 51.95 | 52.07 | 52.07 | 52.4 | 52.4 | 0 | 0 | 0 | 3.17 | 5.64 | 5.64 | 11.45 | 13.82 | 15.79 | 16.3 | 17.72 | 18.22 | 18.89 | 20.29 | 22.32 | 24.63 | 37.03 | 48.13 | 56.11 | 61.46 | 53.07 | 54.39 | 55.87 | 55.87 | 61.06 | 61.06 | 0 | 0 | 0 | 0 | 0 | 0 | 2300 | 0 | 0 | 0 | No | 45.67 | 39.700000000000003 | 5.9699999999999989 | Good Progress | 1.1000000000000014 | 2.009999999999998 | 1.740000000000002 | 4.5599999999999987 | 9.4600000000000009 | 7.82 | 5.490000000000002 | 0.18999999999999773 | 0.13000000000000256 | 0.11999999999999744 | 0 | 0.32999999999999829 | 2.7458333333333336 | 0.62831805833333343 | 1450 | 0.54137931034482756 | 665 | 22.166666666666668 | 0.45862068965517244 | 0.4793 | 10967630.18 | 494780.30887218041 | 12612774.707 | 568997.35520300746 | 7.2075187969924818E-4 | 2.1622556390977443E-2 | 18966.57850676692 | 8.8836260257913243E-3 | -2.0679310344827562E-2 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 304 | نعم | نعم | 13.789054760000001 | 16.067932894000002 | 2.2788781340000011 | 0.91339999999999999 | No | 45333 | Out | 45300 | within time | 24 | 57 | Within Time | 6.2202534333333332 | 19.283484566666669 | 0 | 0 | 0 | 25.503738000000002 | 1829186.8819667951 | 9.9142250000000001 | 0.43326479508447469 | 0.52045494806423753 | 1.0679310344827608E-2 | 60.057500000000005 | -5.667500000000004 | R | 8.66 | Delayed | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||
| 54 | P1652 | 01/23/2/02/0033/1 | عقد تنفيذ شبكات الصرف الصحي بحوطة بني تميم و الخرج (المرحلة الثانية) | الأوسط | منطقة الرياض | مشاريع الحزمة الأولى | صرف | خطوط وشبكات | 45505 | 46702 | 0.53216374269005851 | 42393701.899999999 | 42.393701899999996 | 48752757.189999998 | 48.752757189999997 | 0 | 48.752757189999997 | لا | تحت التنفيذ | منتظم | شركة السبق العربي للتجارة والمقاولات | مكتب الياردة للاستشارات الهندسية | جاري | 46984 | 0 | 45961 | 0.45781119465329989 | 0.48120300751879697 | 0.5071010860484545 | 0.53216374269005851 | 0.55806182121971593 | 0.58312447786131993 | 0.60902255639097747 | 0.63492063492063489 | 0.65998329156223889 | 0.68588137009189643 | 0.71094402673350043 | 0.73684210526315785 | Null | 0 | 0 | 0 | 0 | 0 | 0.89 | 2.0699999999999998 | 3.9 | 7.78 | 9.8800000000000008 | 10.38 | 12.66 | 16.670000000000002 | 21.63 | 30.01 | 38.04 | 42.22 | 48.15 | 52.62 | 55.24 | 55.24 | 58.01 | 58.01 | 0 | 0 | 0 | 1.1439999999999999 | 5.0049999999999999 | 8.0090000000000003 | 11.43 | 17.239999999999998 | 19.84 | 24.2 | 29.81 | 36.5 | 41.57 | 30.74 | 36.409999999999997 | 42.36 | 46.21 | 50.88 | 57.16 | 57.16 | 70.14 | 58.01 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 37.354999999999997 | 41.33 | -3.9750000000000014 | Good Progress | 0.5 | 2.2799999999999994 | 4.0100000000000016 | 4.9599999999999973 | 8.3800000000000026 | 8.0299999999999976 | 4.18 | 5.93 | 4.4699999999999989 | 2.6200000000000045 | 0 | 2.769999999999996 | 4.0108333333333333 | 1.7003407270391664 | 1197 | 0.53216374269005851 | 560 | 18.666666666666668 | 0.46783625730994149 | 0.4476 | 18975420.97044 | 1016540.4091307143 | 21821734.118244 | 1169021.4706202142 | 7.9928571428571429E-4 | 2.3978571428571429E-2 | 38967.382354007139 | -8.5467283702213275E-3 | 2.0236257309941497E-2 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 287 | نعم | نعم | 28.281474445918999 | 28.281474445918999 | 0 | 1 | No | 45496 | within time | 45455 | within time | 9 | 50 | Within Time | 16.024819318199995 | 21.633902871800004 | 0 | 0 | 0 | 37.658722189999999 | 4789470.8663455993 | 9.7175960000000003 | 0.22922263365728865 | 0.48260624273980263 | 7.0063742690058495E-2 | 60.182499999999997 | -9.3024999999999949 | R | 0 | Regular | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 55 | 10226 | 05/23/2/15/0003/1 | مناقصة مشروع انشاء محطة ضخ المياه بالسلمانية بالظهران بمحافظة الخبر | الشرقي | المنطقة الشرقية | مبادرات | مياه | محطات الضخ | 45266 | 45997 | 1.198358413132695 | 10398155.5 | 10.3981555 | 11957878.83 | 11.95787883 | 3.4850607899999999 | 15.442939620000001 | نعم | منجز متقدم | 46203 | 46081 | نعم | متوقع تعثره (مدة منقضية) | استلام ابتدائي | استلام ابتدائي | شركة نظم البيئة للمقاولات | شركة الخدمات الهندسية والفنية للإستشارات المهنية | جاري | 46996 | 0 | 45930 | 1.076607387140903 | 1.1149110807113543 | 1.1573187414500683 | 1.198358413132695 | 1.240766073871409 | 1.2818057455540355 | 1.3242134062927498 | 1.3666210670314638 | 1.4076607387140903 | 1.4500683994528043 | 1.491108071135431 | 1.533515731874145 | Null | متوقع تعثره (مدة منقضية) | تعارض مع جهات خارجية | إجراءات خارجية | 0 | 0 | 0 | 0 | 1.07 | 2.86 | 8.25 | 9.3000000000000007 | 16.28 | 16.28 | 25.74 | 27.87 | 35.979999999999997 | 41.33 | 47.39 | 47.39 | 52.66 | 56.38 | 59.6 | 64.23 | 80.34 | 84.43 | 94.38 | 97.03 | 97.56 | 97.56 | 97.56 | 97.56 | 97.56 | 97.56 | 0 | 0.76 | 2.8 | 5.73 | 8.83 | 13.4 | 17.54 | 17.54 | 27.3 | 34.770000000000003 | 41.99 | 50.13 | 56.88 | 63.83 | 70.150000000000006 | 75.55 | 81.489999999999995 | 86.32 | 77.75 | 83.8 | 88.47 | 95.12 | 99.42 | 100 | 100 | 100 | 100 | 100 | 0 | 0 | 0 | 8640 | 0 | 7000 | 713.6 | 500 | 0 | ضمن الخطة متقدم | ضمن الخطة الأساسية | No | 53.13 | 61.050000000000004 | -7.9200000000000017 | Good Progress | 3.720000000000006 | 3.2199999999999989 | 4.6300000000000026 | 16.11 | 4.0900000000000034 | 9.9499999999999886 | 2.6500000000000057 | 0.53000000000000114 | 0 | 0 | 0 | 0 | 3.7416666666666671 | 0.38906431829166671 | 731 | 1.198358413132695 | -145.00000000000003 | -4.8333333333333339 | -0.19835841313269498 | 2.4399999999999977E-2 | 253714.99419999975 | -52492.757420689595 | 291772.24345199973 | -60366.671059034423 | -1.6827586206896532E-4 | -5.0482758620689601E-3 | -2012.2223686344805 | 3.6519999999999972E-4 | -0.22275841313269495 | مشاريع التحول الوطني | نعم | 11.666106586548 | 11.95787883 | 0.29177224345199981 | 0.97560000000000002 | No | 45258 | within time | 45190 | Out | 8 | 76 | Within Time | 15.442939620000001 | 0 | 0 | 0 | 0 | 15.442939620000001 | 9.2190429999999992 | 0.88660368658652966 | 0.98432708018095383 | 0.204158413132695 | 108.785 | -8.7849999999999966 | R | 2.44 | Regular | R | مشاريع التحول الوطني | |||||||||||||||||||||||||||||||||||||||||||
| 56 | O987 | 07/23/2/11/0019/1 | مشروع انشاء خطوط ناقلة بمدينة حائل رقم (2) | الشمالي | منطقة حائل | عامة | مياه | خطوط وشبكات | 45468 | 46361 | 0.75475923852183646 | 77058970 | 77.058970000000002 | 88617815.5 | 88.617815500000006 | 0 | 88.617815500000006 | نعم | 46387 | نعم | تحت التنفيذ | منتظم | شركة ضيف الله العتيبي للمقاولات | شركة عبدالله عبدالرحمن السعيد للاستشارات الهندسية شركة مهنية شخص واحد | جاري | 46999 | ضعف آداء المقاول | 45869 | 0.65509518477043671 | 0.6864501679731243 | 0.72116461366181406 | 0.75475923852183646 | 0.78947368421052633 | 0.82306830907054873 | 0.85778275475923849 | 0.89249720044792835 | 0.92609182530795076 | 0.96080627099664051 | 0.99440089585666291 | 1.0291153415453527 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 0.4 | 1.35 | 5.7 | 7.5 | 11.76 | 15.6 | 19.7 | 29.2 | 32 | 41.16 | 46.45 | 46.8 | 48.8 | 50.2 | 52.2 | 53.9 | 53.9 | 57.9 | 57.9 | 0 | 0 | 0 | 0 | 0.51 | 3.73 | 7.59 | 11.31 | 19.91 | 24.75 | 29.92 | 34.270000000000003 | 39.1 | 44.34 | 51.06 | 56.35 | 46.7 | 49.51 | 52.49 | 52.84 | 55.64 | 55.64 | 62.54 | 62.54 | 0 | 0 | 0 | 0 | 0 | 0 | 29760 | 0 | 0 | No | 41.92 | 47.449999999999996 | -5.529999999999994 | Good Progress | 4.0999999999999996 | 9.5 | 2.8000000000000007 | 9.1599999999999966 | 5.2900000000000063 | 0.34999999999999432 | 2 | 1.4000000000000057 | 2 | 1.6999999999999957 | 0 | 4 | 3.5249999999999999 | 2.7163286924999999 | 893 | 0.75475923852183646 | 219.00000000000003 | 7.3000000000000007 | 0.24524076147816354 | 0.46100000000000002 | 35524185.170000002 | 4866326.7356164381 | 40852812.945500001 | 5596275.7459589038 | 2.105022831050228E-3 | 6.3150684931506842E-2 | 186542.52486529679 | 1.8994586466165413E-2 | -0.21575923852183648 | ميزانية عامة | 51.309715174500006 | 55.421581813700001 | 4.1118666391999952 | 0.9536 | No | 45445 | Out | 45406 | Out | 23 | 62 | No | 24.594654591666668 | 59.592503908333342 | 0 | 0 | 0 | 84.18715850000001 | 42.102451000000002 | 0.5463666462191229 | 0.50475782841865957 | 0.22985923852183643 | 60.775000000000006 | -7.9350000000000023 | R | 4.6399999999999997 | Regular | R | ميزانية عامة | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 57 | 10175 | 26/23/2/11/0001/1 | تنفيذ خط المياه قطر 1400مم لتوفير الاحتياجات المائية لمشروع مسار بمكة المكرمة | الغربي | وحدة عمل مكة | على حساب جهات أخرى ( حكومية / خاصة) | مياه | خطوط وشبكات | 45266 | 46109 | 1.0391459074733096 | 48224900 | 48.224899999999998 | 55458635 | 55.458635000000001 | 0 | 55.458635000000001 | لا | ضمن خط الأساس - المتعثر بداية العام | إيقاف جزئي | متعثر | شركة العزم للانشاء والتعمير | شركة بيت الخبرة للاستشارات الهندسية | جاري | 46985 | 0 | 0.93357058125741399 | 0.96678529062870699 | 1.0035587188612101 | 1.0391459074733096 | 1.0759193357058126 | 1.1115065243179123 | 1.1482799525504153 | 1.1850533807829182 | 1.2206405693950177 | 1.2574139976275207 | 1.2930011862396205 | 1.3297746144721234 | Null | ضمن خط الأساس - المتعثر بداية العام | 45958 | V.Order | 0 | 0 | 0.21 | 2.48 | 6.99 | 7.19 | 13.99 | 13.99 | 26.72 | 32.229999999999997 | 38.520000000000003 | 44.24 | 45.99 | 46.2 | 46.3 | 48.37 | 50.7 | 50.83 | 57.9 | 58 | 58.22 | 58.59 | 58.59 | 58.59 | 60.85 | 60.85 | 70.2 | 70.2 | 0 | 0.9 | 5.9 | 7.5 | 10.9 | 10.9 | 15.2 | 15.2 | 28.6 | 35.9 | 43.4 | 49.1 | 55.96 | 63.5 | 70.959999999999994 | 71.709999999999994 | 73.63 | 74.27 | 82.34 | 73.81 | 77.73 | 79.17 | 79.33 | 100 | 63.85 | 63.85 | 100 | 100 | 0 | 0 | 0 | 0 | 0 | 0 | 4300 | 0 | 4300 | 0 | No | 35.770000000000003 | 20.07 | 15.700000000000003 | Low Progress | 2.0700000000000003 | 2.3300000000000054 | 0.12999999999999545 | 7.07 | 0.10000000000000142 | 0.21999999999999886 | 0.37000000000000455 | 0 | 0 | 2.259999999999998 | 0 | 9.3500000000000014 | 1.9916666666666671 | 0.96047925833333347 | 843 | 1.0391459074733096 | -32.999999999999986 | -1.0999999999999994 | -3.9145907473309594E-2 | 0.39149999999999996 | 18880048.350000001 | -17163680.318181828 | 21712055.602499999 | -19738232.3659091 | -1.1863636363636368E-2 | -0.35590909090909106 | -657941.07886363659 | -0.43064590747330955 | أخرى | 38.931961770000001 | 55.458635000000001 | 16.52667323 | 0.70199999999999996 | No | 45250 | Out | 45208 | within time | 16 | 58 | Within Time | 5.8472691250000022 | 47.545167874999997 | 0 | 0 | 0 | 53.392437000000001 | 28.506784 | 0.59112168195268422 | 0.58938397647489804 | 0.24584590747330959 | 64.564999999999998 | 35.435000000000002 | Troubled | 29.8 | Troubled | Troubled | أخرى | |||||||||||||||||||||||||||||||||||||||||||||||||||||
| 58 | P1740 | 24/23/2/12/0049/1 | عقد تنفيذ خطوط صرف صحى رئيسية بحي المهدية (مرحلة أولي) | الأوسط | وحدة عمل الرياض | مشاريع الحزمة الأولى | صرف | خطوط وشبكات | 45434 | 46391 | 0.7398119122257053 | 64254149 | 64.254148999999998 | 73892271.349999994 | 73.892271349999987 | 0 | 73.892271349999987 | نعم | 46326 | نعم | تحت التنفيذ | متقدم | شركة نظم البيئة للمقاولات | مكتب الياردة للاستشارات الهندسية | جاري | 46984 | 0 | 0.64681295715778475 | 0.67607105538140022 | 0.70846394984326022 | 0.7398119122257053 | 0.7722048066875653 | 0.8035527690700105 | 0.83594566353187039 | 0.86833855799373039 | 0.89968652037617558 | 0.93207941483803558 | 0.96342737722048066 | 0.99582027168234066 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 7.9 | 13.01 | 17.899999999999999 | 22.1 | 25.76 | 31.11 | 36.93 | 41 | 44.54 | 51 | 55.65 | 62.04 | 70.63 | 74.260000000000005 | 81.150000000000006 | 82.91 | 84.21 | 84.21 | 87.43 | 87.43 | 0 | 0 | 0 | 0.15 | 0.15 | 1.78 | 5.34 | 10.18 | 15.19 | 20.22 | 25.74 | 31.3 | 36.880000000000003 | 43.49 | 50.53 | 56.14 | 63.28 | 69.040000000000006 | 72.930000000000007 | 75.87 | 78.89 | 81.8 | 81.8 | 87.33 | 87.33 | 0 | 0 | 0 | 0 | 0 | 0 | 9122 | 0 | 0 | No | 62.750000000000007 | 56.360000000000007 | 6.3900000000000006 | Good Progress | 4.07 | 3.5399999999999991 | 6.4600000000000009 | 4.6499999999999986 | 6.3900000000000006 | 8.5899999999999963 | 3.6300000000000097 | 6.8900000000000006 | 1.7599999999999909 | 1.2999999999999972 | 0 | 3.2200000000000131 | 4.2083333333333339 | 2.7040287704166666 | 957 | 0.7398119122257053 | 249.00000000000003 | 8.3000000000000007 | 0.2601880877742947 | 0.15790000000000007 | 10145730.127100004 | 1222377.1237469884 | 11667589.646165004 | 1405733.6923090366 | 6.3413654618473913E-4 | 1.9024096385542175E-2 | 46857.789743634545 | -1.6913519230769222E-2 | 0.10228808777429463 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | 64.604012841304993 | 64.530120569954988 | -7.3892271350004535E-2 | 1.0010000000000001 | No | 45425 | within time | 45375 | within time | 9 | 59 | Within Time | 25.316134705999996 | 41.627838643999993 | 0 | 0 | 0 | 66.943973349999993 | 9245655.5175000001 | 44.391893000000003 | 0.69087979050193327 | 0.81714549307062245 | -1.8888087774294737E-2 | 93.775000000000006 | -14.885000000000005 | R | -0.1 | Regular | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 59 | 700 | 05/22/2/11/0007/1 | مشاريع تحسين شبكات المياه في مدينة الدمام - مشروع رقم) 1 شبكة المياه الاستراتيجية في شمال الدمام | الشرقي | المنطقة الشرقية | المشاريع الملحة | مياه | خطوط وشبكات | 44763 | 45963 | 1.1491666666666667 | 226097983 | 226.097983 | 260012680.44999999 | 260.01268045 | 0 | 260.01268045 | نعم | 46295 | نعم | متوقع تعثره (مدة منقضية) | تحت التنفيذ | متأخر | شركة الأعمال المدنية المحدودة | شركة آي ال اف وشركاهم الهندسية | جاري | 46224 | 0 | مستهدفات | 1.075 | 1.0983333333333334 | 1.1241666666666668 | 1.1491666666666667 | 1.175 | 1.2 | 1.2258333333333333 | 1.2516666666666667 | 1.2766666666666666 | 1.3025 | 1.3274999999999999 | 1.3533333333333333 | Null | متوقع تعثره (مدة منقضية) | اسباب خارجية | وجود 5 ايقافات جزئية للتعارض مع جهات خارجية | ضعف اّداء المقاول فني وإداري | 0 | 0 | 34.799999999999997 | 37.049999999999997 | 38.130000000000003 | 38.479999999999997 | 39.04 | 41.35 | 44.01 | 44.01 | 48.01 | 50.01 | 51.01 | 52 | 52.71 | 54.27 | 56.02 | 58.93 | 60.72 | 62.51 | 65.790000000000006 | 69.900000000000006 | 72.680000000000007 | 78.41 | 84.73 | 86.32 | 87.95 | 87.95 | 89.6 | 89.6 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 78.41 | 88.93 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | حى النخيل -حى القزاز -حى غرناطه -حى القادسية -حى الضباب-حى بدر-حى احد-ضاحية الملك فهد | 0 | 0 | 0 | 0 | 0 | 0 | 21837 | 0 | 0 | استكمال منظومة برنامج مشاريع تحسين جودة مياه الشرب بالمنطقة الشرقية | تحسين جودة المياه | No | 0 | 27.4 | -27.4 | Good Progress | 2.9099999999999966 | 1.7899999999999991 | 1.7899999999999991 | 3.2800000000000082 | 4.1099999999999994 | 2.7800000000000011 | 5.7299999999999898 | 6.3200000000000074 | 1.5899999999999892 | 1.6300000000000097 | 0 | 1.6499999999999915 | 2.7983333333333325 | 6.3269752242833315 | 1200 | 1.1491666666666667 | -179 | -5.9666666666666668 | -0.14916666666666667 | 0.12049999999999997 | 27244806.951499991 | -4566168.7628212273 | 31331527.994224995 | -5251094.0772444122 | -6.7318435754189926E-4 | -2.0195530726256978E-2 | -175036.4692414804 | -8.0782122905027915E-3 | -0.26966666666666661 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | 232.97136168319997 | 260.01268045 | 27.041318766800032 | 0.89599999999999991 | No | 44720 | Out | 44704 | within time | 43 | 59 | Within Time | 60.160904976583332 | 161.72674547341666 | 0 | 0 | 0 | 221.88765045 | 55698395.774500027 | 129.406396 | 0.57234652995555468 | 0.85217740782273865 | 0.14916666666666667 | 93.125 | 6.875 | R | 10.4 | Delayed | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||
| 60 | P1811 | 01/23/2/01/0052/1 | عقد استكمال مشاريع المياه بمحافظتي شقراء ومرات (المرحلة الثانية) | الأوسط | منطقة الرياض | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45705 | 46458 | 0.58034528552456843 | 22542100 | 22.542100000000001 | 25923415 | 25.923414999999999 | 0 | 25.923414999999999 | نعم | 46203 | نعم | تحت التنفيذ | متقدم | شركة صرح الحديثة للمقاولات | مكتب الياردة للاستشارات الهندسية | جاري | 46984 | 0 | 0.46215139442231074 | 0.49933598937583001 | 0.54050464807436915 | 0.58034528552456843 | 0.62151394422310757 | 0.66135458167330674 | 0.70252324037184599 | 0.74369189907038513 | 0.7835325365205843 | 0.82470119521912355 | 0.86454183266932272 | 0.90571049136786186 | Null | 0 | 0 | 0 | 0 | 0.92 | 6.74 | 13.79 | 23.53 | 30.86 | 37.869999999999997 | 46.5 | 54 | 63.15 | 68.22 | 68.22 | 82.1 | 82.1 | 0 | 0 | 0 | 1.25 | 5.3 | 10.32 | 16.52 | 25.43 | 33.32 | 41.18 | 50.34 | 54.14 | 57.85 | 57.85 | 72.55 | 72.55 | 0 | 0 | 0 | 0 | 0 | 0 | 33120 | 0 | 0 | No | 41.18 | 46.5 | -5.32 | Good Progress | 0.92 | 5.82 | 7.0499999999999989 | 9.740000000000002 | 7.3299999999999983 | 7.009999999999998 | 8.6300000000000026 | 7.5 | 9.1499999999999986 | 5.07 | 0 | 13.879999999999995 | 6.8416666666666659 | 1.5422553416666664 | 753 | 0.58034528552456843 | 315.99999999999994 | 10.533333333333331 | 0.41965471447543157 | 0.31780000000000003 | 7163879.3799999999 | 680115.13101265836 | 8238461.2870000005 | 782132.40066455712 | 1.0056962025316459E-3 | 3.0170886075949376E-2 | 26071.080022151906 | 0.10185471447543154 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | 21.283123714999999 | 18.8074375825 | -2.4756861324999981 | 1.0954999999999999 | No | 45692 | within time | 45650 | within time | 13 | 55 | Within Time | 12.81518385 | 7.9550241499999998 | 0 | 0 | 0 | 20.770208 | 10575349.4 | 7.9891860000000001 | 0.35441178949609842 | 0.54192063060457418 | 7.6945285524568363E-2 | 74.525000000000006 | -20.385000000000005 | R | -9.5500000000000007 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 61 | P1886 | 06/23/2/01/0025/1 | مشروع انشاء خزان التجميع ومحطة التوزيع رقم 1 على طريق تثليث الامواه | الجنوبي | منطقة عسير | مشاريع الحزمة الأولى | مياه | خزانات | 45399 | 46481 | 0.68669131238447323 | 10694891 | 10.694891 | 12299124.65 | 12.29912465 | 0 | 12.29912465 | لا | تحت التنفيذ | متقدم | شركة مشروعات المياه والطاقة للمقاولات | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | 0 | 0.60443622920517559 | 0.63031423290203326 | 0.65896487985212571 | 0.68669131238447323 | 0.71534195933456557 | 0.74306839186691309 | 0.77171903881700554 | 0.80036968576709799 | 0.82809611829944552 | 0.85674676524953786 | 0.88447319778188538 | 0.91312384473197783 | Null | 0 | 0 | 0 | 0 | 7.01 | 8.4 | 8.4 | 9.64 | 11.34 | 12.74 | 18.39 | 22.51 | 28.56 | 30.83 | 37.5 | 39.729999999999997 | 44.37 | 49.41 | 54.62 | 60.67 | 64.88 | 69.819999999999993 | 73.77 | 79.680000000000007 | 79.680000000000007 | 85.45 | 85.45 | 0 | 0 | 0 | 0 | 1.131 | 1.131 | 6.6870000000000003 | 9.0440000000000005 | 12.693 | 16.245999999999999 | 24.78 | 30.25 | 36.57 | 42.64 | 49.19 | 53.98 | 58.93 | 64.56 | 70.260000000000005 | 74.8 | 79.31 | 70.040000000000006 | 70.58 | 70.58 | 74.459999999999994 | 74.459999999999994 | 0 | 0 | 0 | 0 | 0 | 0 | 710 | 0 | 0 | 0 | No | 62.106999999999999 | 52.139999999999993 | 9.9670000000000059 | Good Progress | 6.6700000000000017 | 2.2299999999999969 | 4.6400000000000006 | 5.0399999999999991 | 5.2100000000000009 | 6.0500000000000043 | 4.2099999999999937 | 4.9399999999999977 | 3.9500000000000028 | 5.9100000000000108 | 0 | 5.769999999999996 | 4.5516666666666667 | 0.4867957886833334 | 1082 | 0.68669131238447323 | 338.99999999999994 | 11.299999999999999 | 0.31330868761552677 | 0.20319999999999994 | 2173201.851199999 | 192318.74789380524 | 2499182.1288799993 | 221166.56007787606 | 5.9941002949852502E-4 | 1.7982300884955751E-2 | 7372.2186692625364 | 3.3669111111111101E-3 | 0.11010868761552683 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 175 | نعم | نعم | 10.509602013424999 | 9.1579282143899992 | -1.3516737990349998 | 1.1099000000000001 | No | 45376 | Out | 45347 | within time | 23 | 52 | Within Time | 4.353711877916667 | 6.6861737720833325 | 0 | 0 | 0 | 11.039885649999999 | 736963.54902799986 | 5.8418289999999997 | 0.54622613732108161 | 0.70203469700812116 | -0.1064086876155268 | 83.474999999999994 | -13.434999999999988 | R | -10.99 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 62 | P1414 | 04/23/2/01/0021/1 | تنفيذ خطوط مياه رئيسية بمدينة بريدة (مرحلة ثالثة) | الشمالي | منطقة القصيم | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45440 | 46327 | 0.79143179255918827 | 64000000 | 64 | 73600000 | 73.599999999999994 | 0 | 73.599999999999994 | نعم | منجز متقدم | 46142 | 46112 | نعم | استلام ابتدائي | استلام ابتدائي | شركة عبدالله محمد سليمان الصيخان وأولاده للتجارة والمقاولات | شركة عبدالله عبدالرحمن السعيد للاستشارات الهندسية شركة مهنية شخص واحد | جاري | 46999 | 0 | 0.69109357384441938 | 0.72266065388951517 | 0.75760992108229985 | 0.79143179255918827 | 0.82638105975197296 | 0.86020293122886138 | 0.89515219842164595 | 0.93010146561443063 | 0.96392333709131905 | 0.99887260428410374 | 1.0326944757609922 | 1.0676437429537768 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 10 | 19 | 25 | 32.549999999999997 | 32.549999999999997 | 49 | 54 | 59 | 63.15 | 67.5 | 71.989999999999995 | 80 | 88 | 92 | 100 | 100 | 100 | 100 | 100 | 100 | 0 | 0 | 0 | 0 | 0 | 1.08 | 4.46 | 7.84 | 11.32 | 20.43 | 26.07 | 31.51 | 36.79 | 42.97 | 46.58 | 53.92 | 59.76 | 65.3 | 70.88 | 76.31 | 82.35 | 87.57 | 87.57 | 93.52 | 93.52 | 0 | 0 | 0 | 0 | 0 | 0 | 127290 | 0 | 0 | ضمن الخطة متقدم | No | 63.039999999999992 | 67 | -3.960000000000008 | Good Progress | 5 | 4.1499999999999986 | 4.3500000000000014 | 4.4899999999999949 | 8.0100000000000051 | 8 | 4 | 8 | 0 | 0 | 0 | 0 | 3.8333333333333335 | 2.4533333333333336 | 887 | 0.79143179255918827 | 185 | 6.166666666666667 | 0.20856820744081173 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.20856820744081173 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | نعم | 73.599999999999994 | 68.830719999999985 | -4.7692800000000091 | 1.0648000000000002 | No | 45421 | Out | 45403 | within time | 19 | 37 | Within Time | 24.533333333333335 | 47.448737666666659 | 0 | 0 | 0 | 71.982070999999991 | 5630400.0000000075 | 55.940606000000002 | 0.87407196875000004 | 1.0088177935491756 | 2.8331792559188274E-2 | 111.5 | -29.150000000000006 | R | -6.48 | Regular | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||
| 63 | P1463-10 | 1/25/2/1/P1463-10/1 | استبدال شبكات المياه بمحافظة رماح | الأوسط | منطقة الرياض | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45764 | 46978 | 0.3113673805601318 | 10924235 | 10.924234999999999 | 12562870.25 | 12.56287025 | 0 | 12.56287025 | لا | تحت التنفيذ | متقدم | شركة قلاع الانشاء للمقاولات المحدودة | مكتب الياردة للاستشارات الهندسية | جاري | 46984 | 0 | 0.23805601317957167 | 0.26112026359143325 | 0.28665568369028005 | 0.3113673805601318 | 0.3369028006589786 | 0.36161449752883029 | 0.38714991762767709 | 0.41268533772652388 | 0.43739703459637563 | 0.46293245469522243 | 0.48764415156507412 | 0.51317957166392092 | Null | 0 | 0 | 0 | 0 | 1.68 | 7.58 | 18.78 | 23.41 | 33.229999999999997 | 39.71 | 47.68 | 57.83 | 57.83 | 65.95 | 65.95 | 0 | 0 | 0 | 0.59 | 2.0099999999999998 | 5.81 | 9.48 | 26.19 | 28.88 | 32.24 | 37.14 | 37.14 | 47.94 | 47.94 | No | 26.19 | 33.229999999999997 | -7.0399999999999956 | Good Progress | 0 | 0 | 1.68 | 5.9 | 11.200000000000001 | 4.629999999999999 | 9.8199999999999967 | 6.480000000000004 | 7.9699999999999989 | 10.149999999999999 | 0 | 8.1200000000000045 | 5.4958333333333336 | 0.60037774854166659 | 1214 | 0.3113673805601318 | 836 | 27.866666666666667 | 0.6886326194398682 | 0.42170000000000002 | 4606749.8995000003 | 165313.99160885168 | 5297762.3844250003 | 190111.09035017944 | 5.0442583732057417E-4 | 1.5132775119617225E-2 | 6337.0363450059813 | 6.7184579339723115E-3 | 0.26693261943986818 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 355 | نعم | نعم | 8.2852129298749997 | 6.0226399978499989 | -2.2625729320250008 | 1.1801000000000001 | No | 45754 | within time | 45684 | Out | 10 | 80 | Within Time | 5.2645709170833328 | 4.8530653329166666 | 0 | 0 | 0 | 10.11763625 | 1528873.5540407118 | 2.4258380000000002 | 0.22206021748891344 | 0.39798376361104526 | 2.25673805601318E-2 | 56.197500000000005 | -23.957500000000003 | R | -18.010000000000002 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 64 | AP105 | 13/23/2/11/0002/1 | مشروع تنفيد خط ناقل من مركز قطن إلى ثار بمنطقة نجران | الجنوبي | منطقة نجران | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45431 | 46494 | 0.66886171213546564 | 27398210.399999999 | 27.3982104 | 31507941.960000001 | 31.50794196 | 0 | 31.50794196 | لا | تحت التنفيذ | متقدم | شركة نبراس المتحدة للمقاولات | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | 0 | 0.58513640639698961 | 0.61147695202257757 | 0.64063969896519291 | 0.66886171213546564 | 0.69802445907808086 | 0.7262464722483537 | 0.75540921919096893 | 0.78457196613358415 | 0.81279397930385699 | 0.84195672624647222 | 0.87017873941674506 | 0.89934148635936029 | Null | 0 | 0 | 0 | 0 | 1.05 | 1.05 | 7.36 | 10.01 | 11.91 | 19.32 | 26.5 | 29.12 | 35.18 | 41.27 | 46.05 | 52.78 | 57.41 | 61.85 | 67.89 | 72.209999999999994 | 73.66 | 75.040000000000006 | 77.14 | 77.14 | 86.71 | 86.71 | 0 | 0 | 0 | 0 | 0 | 1.6 | 2.14 | 3.25 | 4.66 | 10.29 | 20.39 | 32.26 | 42.42 | 53.81 | 63.53 | 67.86 | 76.239999999999995 | 78.03 | 86.35 | 73.44 | 75.17 | 77.77 | 77.77 | 80.44 | 80.44 | 0 | 0 | 0 | 0 | 0 | 0 | 25000 | 0 | 0 | 0 | No | 83.1 | 60.3 | 22.799999999999997 | Low Progress | 6.0900000000000034 | 4.779999999999994 | 6.730000000000004 | 4.6299999999999955 | 4.4400000000000048 | 6.0399999999999991 | 4.3199999999999932 | 1.4500000000000028 | 1.3800000000000097 | 2.0999999999999943 | 0 | 9.5699999999999932 | 4.2941666666666665 | 1.1765248182599999 | 1063 | 0.66886171213546564 | 352.00000000000006 | 11.733333333333336 | 0.33113828786453436 | 0.2286 | 6263230.8974399995 | 533798.08784999978 | 7202715.5320560001 | 613867.80102749984 | 6.494318181818181E-4 | 1.9482954545454543E-2 | 20462.260034249997 | 6.4943181818181818E-3 | 0.10253828786453437 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 145 | نعم | نعم | 27.320536473516 | 25.344988512623999 | -1.9755479608920012 | 1.0627 | No | 45420 | within time | 45384 | within time | 11 | 47 | Within Time | 9.5802409032 | 18.305681056800001 | 0 | 0 | 0 | 27.885921960000001 | 1564684.3977335999 | 15.279028 | 0.55766518239454066 | 0.74073079775434936 | -6.5538287864534306E-2 | 86.54249999999999 | -11.372499999999988 | R | -6.27 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 65 | AP142 | 06/23/2/01/0064/1 | مشروع إيصال خدمات المياه والصرف الصحي للجهات الحكومية والخاصة بالقطاع الجنوبي لعام 2023 | الجنوبي | منطقة عسير | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45616 | 46192 | 0.91319444444444442 | 19141870 | 19.141870000000001 | 22013150.5 | 22.013150499999998 | 0 | 22.013150499999998 | نعم | 46265 | نعم | متوقع تعثره (مدة منقضية) | تحت التنفيذ | متأخر | شركة ماكسون للمقاولات | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | 0 | 0.75868055555555558 | 0.80729166666666663 | 0.86111111111111116 | 0.91319444444444442 | 0.96701388888888884 | 1.0190972222222223 | 1.0729166666666667 | 1.1267361111111112 | 1.1788194444444444 | 1.2326388888888888 | 1.2847222222222223 | 1.3385416666666667 | Null | متوقع تعثره (مدة منقضية) | 0 | 0 | 0 | 0 | 2.11 | 3.51 | 4.8099999999999996 | 10.31 | 14.69 | 20.49 | 27.71 | 35.96 | 43.3 | 52.68 | 57.59 | 64.150000000000006 | 70.180000000000007 | 70.180000000000007 | 75.239999999999995 | 75.239999999999995 | 0 | 0 | 0 | 0.99 | 2.2799999999999998 | 4.6100000000000003 | 7.69 | 12.42 | 19.89 | 29.02 | 39.590000000000003 | 51.84 | 62.58 | 57.43 | 62.72 | 70.67 | 70.67 | 87.06 | 87.06 | 0 | 0 | 0 | 0 | 0 | 0 | 19760 | 0 | 0 | No | 62.58 | 52.68 | 9.8999999999999986 | Good Progress | 5.5000000000000009 | 4.379999999999999 | 5.7999999999999989 | 7.2200000000000024 | 8.25 | 7.3399999999999963 | 9.3800000000000026 | 4.9100000000000037 | 6.5600000000000023 | 6.0300000000000011 | 0 | 5.0599999999999881 | 5.8691666666666658 | 1.1234682534166667 | 576 | 0.91319444444444442 | 50.000000000000014 | 1.6666666666666672 | 8.680555555555558E-2 | 0.29819999999999991 | 5708105.6339999987 | 3424863.3803999983 | 6564321.4790999983 | 3938592.8874599976 | 5.9639999999999962E-3 | 0.17891999999999991 | 131286.42958199992 | 1.2954590163934425E-2 | -0.21139444444444433 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | 16.562694436199997 | 19.164648825299999 | 2.6019543891000012 | 0.88179999999999992 | No | 45592 | Out | 45545 | Out | 24 | 71 | No | 10.427533682500002 | 7.8368368174999965 | 0 | 0 | 0 | 18.264370499999998 | 8728177.9100000001 | 7.4595900000000004 | 0.38970017035953125 | 0.57815306347329432 | 0.33889444444444439 | 75.197500000000005 | -12.477500000000006 | R | 11.82 | Delayed | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 66 | AP1038-9 | 03/23/1/03/0017/1 | اتفاقية الخدمات الهندسية الاستشارية لإعداد الدراسات والتصاميم لمشاريع المياه والصرف الصحي بالقطاع الشمالي الغربي عقد (1) | الشمالي الغربي | منطقة المدينة المنورة | مشاريع الحزمة الأولى | استشاري | تصميم | 45311 | 46407 | 0.75821167883211682 | 106796889.81 | 106.79688981 | 122816423.28 | 122.81642328 | 0 | 122.81642328 | لا | تحت التنفيذ | استشاري | فرع شركة أياسا انخيريا إي اركيتوركورا اس ايه | 0 | إتفاقية | 0.67700729927007297 | 0.70255474452554745 | 0.7308394160583942 | 0.75821167883211682 | 0.78649635036496346 | 0.81386861313868608 | 0.84215328467153283 | 0.87043795620437958 | 0.8978102189781022 | 0.92609489051094895 | 0.95346715328467158 | 0.98175182481751821 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 15 | 15 | 15 | 15 | 15 | 82 | 0 | 0 | 0 | 0 | 0 | 37.450000000000003 | 46.47 | 46.47 | 46.47 | 46.47 | 49.16 | 49.16 | 49.16 | 49.16 | 49.16 | 49.16 | 0 | 0 | 0 | 0 | 0 | 0 | 45 | 45 | 45 | 45 | 45 | 95 | 0 | 0 | 0 | 0 | 0 | 47.69 | 57.34 | 59.73 | 61.04 | 62.12 | 66.19 | 70.52 | 72.55 | 72.55 | 74.83 | 74.83 | استشاري عالمي تصميم | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 17.119999999999997 | 31.47 | -14.350000000000001 | Good Progress | 0 | 0 | 37.450000000000003 | 9.019999999999996 | 0 | 0 | 0 | 2.6899999999999977 | 0 | 0 | 0 | 0 | 4.0966666666666667 | 4.3751125858829996 | 1096 | 0.75821167883211682 | 264.99999999999994 | 8.8333333333333321 | 0.24178832116788318 | 0.50840000000000007 | 54295538.779403999 | 6146664.7674796991 | 62439869.595552005 | 7068664.482515322 | 1.9184905660377366E-3 | 5.7554716981132098E-2 | 235622.14941717745 | 6.3988275862068969E-2 | -0.26661167883211689 | المشاريع الاستراتيجية | نعم | 60.376553684447991 | 91.903529540423989 | 31.526975855975998 | 0.74330000000000007 | No | 45294 | Out | 45582 | within time | 17 | -271 | Within Time | 43.751125858830008 | 68.224390421169986 | 0 | 0 | 0 | 111.97551627999999 | 35.596473000000003 | 0.33331001551944917 | 0.49324403175880399 | 9.6311678832116887E-2 | 61.449999999999996 | 9.07 | R | 25.67 | Troubled | Troubled | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||
| 67 | 10282 | 04/23/2/02/0028/1 | مشروع تنفيذ شبكات الصرف الصحي جنوب محافظة الرس | الشمالي | منطقة القصيم | مشاريع الحزمة الأولى | صرف | خطوط وشبكات | 45494 | 46494 | 0.64800000000000002 | 43184210 | 43.18421 | 49661841.5 | 49.661841500000001 | 0 | 49.661841500000001 | لا | تحت التنفيذ | منتظم | مجموعة سعد علي العيسى للمقاولات (شركة شخص واحد) | شركة عبدالله عبدالرحمن السعيد للاستشارات الهندسية شركة مهنية شخص واحد | جاري | 46999 | 0 | 0.55900000000000005 | 0.58699999999999997 | 0.61799999999999999 | 0.64800000000000002 | 0.67900000000000005 | 0.70899999999999996 | 0.74 | 0.77100000000000002 | 0.80100000000000005 | 0.83199999999999996 | 0.86199999999999999 | 0.89300000000000002 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 1.02 | 2.5739999999999998 | 2.57 | 6.5 | 9.51 | 14.9 | 23.39 | 31.88 | 42.97 | 51.68 | 55.3 | 61.33 | 66.05 | 72.180000000000007 | 72.5 | 72.5 | 73.7 | 73.7 | 0 | 0 | 0 | 0 | 0.31 | 0.72 | 3.52 | 4.4400000000000004 | 13.1 | 18.79 | 23.38 | 31.55 | 36.049999999999997 | 42.95 | 48.63 | 53.57 | 60.1 | 64.900000000000006 | 72.14 | 70.61 | 70.61 | 75.64 | 75.64 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 45000 | 0 | 0 | No | 59.38 | 60.309999999999995 | -0.92999999999999261 | Good Progress | 5.3900000000000006 | 8.49 | 8.4899999999999984 | 11.09 | 8.7100000000000009 | 3.6199999999999974 | 6.0300000000000011 | 4.7199999999999989 | 6.1300000000000097 | 0.31999999999999318 | 0 | 1.2000000000000028 | 5.3491666666666662 | 2.3099953665833333 | 1000 | 0.64800000000000002 | 352 | 11.733333333333333 | 0.35199999999999998 | 0.27500000000000002 | 11875657.75 | 1012129.9218750001 | 13657006.4125 | 1163949.41015625 | 7.8125000000000004E-4 | 2.34375E-2 | 38798.313671875003 | 5.4639934533551567E-3 | 7.6999999999999957E-2 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 163 | نعم | نعم | 36.6007771855 | 37.564216910600003 | 0.96343972510000242 | 0.98059999999999992 | No | 45480 | within time | 45451 | within time | 14 | 43 | Within Time | 22.668111565833335 | 22.394838934166664 | 0 | 0 | 0 | 45.062950499999999 | 2767157.8083800003 | 23.497388999999998 | 0.5441199225365011 | 0.66411357426584972 | -1.0000000000000009E-3 | 82.097499999999997 | -9.957499999999996 | R | 1.94 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 68 | P1350 | 04/23/2/02/0033/1 | تنفيذ شبكات الصرف الصحي ببعض أحياء محافظة رياض الخبراء - مرحلة ثانية | الشمالي | منطقة القصيم | مشاريع الحزمة الأولى | صرف | خطوط وشبكات | 45510 | 46551 | 0.60710854947166182 | 22230031 | 22.230031 | 25564535.649999999 | 25.56453565 | 0 | 25.56453565 | لا | تحت التنفيذ | متقدم | شركة سعد فضي الحربي للمقاولات | شركة عبدالله عبدالرحمن السعيد للاستشارات الهندسية شركة مهنية شخص واحد | جاري | 46999 | 0 | 0.52161383285302598 | 0.54851104707012488 | 0.57829010566762729 | 0.60710854947166182 | 0.63688760806916422 | 0.66570605187319887 | 0.69548511047070127 | 0.72526416906820368 | 0.75408261287223821 | 0.78386167146974062 | 0.81268011527377526 | 0.84245917387127767 | Null | 0 | 0 | 0 | 0 | 0.2 | 2.06 | 7.5 | 10.33 | 14.85 | 15.97 | 21.9 | 26.54 | 30.25 | 35.22 | 42.27 | 48.01 | 53.8 | 60.2 | 63.36 | 68.510000000000005 | 68.510000000000005 | 72.650000000000006 | 72.650000000000006 | 0 | 0 | 0 | 1.35 | 1.35 | 2.61 | 8.3699999999999992 | 11.28 | 14.79 | 18.190000000000001 | 22.59 | 27.52 | 33.68 | 40.549999999999997 | 47.1 | 53.72 | 59.37 | 62.09 | 64.94 | 64.94 | 72.23 | 72.23 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 32000 | 0 | 0 | No | 52.37 | 51.739999999999995 | 0.63000000000000256 | Good Progress | 5.9299999999999979 | 4.6400000000000006 | 3.7100000000000009 | 4.9699999999999989 | 7.0500000000000043 | 5.7399999999999949 | 5.7899999999999991 | 6.4000000000000057 | 3.1599999999999966 | 5.1500000000000057 | 0 | 4.1400000000000006 | 4.7233333333333336 | 1.0499984642333333 | 1041 | 0.60710854947166182 | 409.00000000000006 | 13.633333333333335 | 0.39289145052833818 | 0.31489999999999996 | 7000236.7618999993 | 513464.7991613691 | 8050272.2761849985 | 590484.5190355744 | 7.6992665036674797E-4 | 2.309779951100244E-2 | 19682.817301185813 | 5.5308422273781885E-3 | 7.7991450528338224E-2 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 221 | نعم | نعم | 18.572635149725002 | 18.465264099995 | -0.107371049730002 | 1.0042 | No | 45496 | within time | 45449 | Out | 14 | 61 | Within Time | 9.7330485728333347 | 12.522168077166665 | 0 | 0 | 0 | 22.255216650000001 | 1938303.092983 | 9.7245819999999998 | 0.43745247138881632 | 0.60464503464719388 | 1.3408549471661813E-2 | 74.37 | -12.280000000000001 | R | -0.42 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 69 | P1436 | 04/23/2/01/0012/1 | تنفيذ شبكات مياه ببعض مراكز وقرى منطقة القصيم (مرحلة أولى) | الشمالي | منطقة القصيم | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45419 | 46984 | 0.46198083067092649 | 53938873.850000001 | 53.93887385 | 62029704.93 | 62.029704930000001 | 0 | 62.029704930000001 | لا | تحت التنفيذ | منتظم | شركة الاصايل للمقاولات | شركة عبدالله عبدالرحمن السعيد للاستشارات الهندسية شركة مهنية شخص واحد | جاري | 46999 | 0 | 0.40511182108626198 | 0.42300319488817889 | 0.44281150159744409 | 0.46198083067092649 | 0.48178913738019169 | 0.50095846645367414 | 0.52076677316293929 | 0.54057507987220443 | 0.55974440894568689 | 0.57955271565495203 | 0.59872204472843449 | 0.61853035143769963 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 8.69 | 13.31 | 16.52 | 20.84 | 26.58 | 32.61 | 35.6 | 35.9 | 36.299999999999997 | 36.299999999999997 | 44.41 | 51.7 | 55.76 | 57.8 | 61.2 | 62.94 | 64.31 | 64.31 | 66.28 | 66.28 | 0 | 0 | 0.1 | 0.71 | 0.71 | 2.34 | 3.46 | 4.88 | 6.78 | 9.3800000000000008 | 12.48 | 15.62 | 19.79 | 23.9 | 27.24 | 32.479999999999997 | 36.43 | 40.700000000000003 | 45.05 | 49.64 | 53.91 | 58.21 | 58.21 | 66.27 | 66.28 | 0 | 0 | 0 | 0 | 0 | 0 | 300280 | 0 | 0 | 0 | No | 40.169999999999995 | 41.28 | -1.1100000000000065 | Good Progress | 0.29999999999999716 | 0.39999999999999858 | 0 | 8.11 | 7.2900000000000063 | 4.0599999999999952 | 2.0399999999999991 | 3.4000000000000057 | 1.7399999999999949 | 1.3700000000000045 | 0 | 1.9699999999999989 | 2.5566666666666666 | 1.3790372080983335 | 1565 | 0.46198083067092649 | 842 | 28.066666666666666 | 0.53801916932907345 | 0.3569 | 19250784.077064998 | 685894.91961039184 | 22138401.689516999 | 788779.15758374101 | 4.2387173396674581E-4 | 1.2716152019002376E-2 | 26292.6385861247 | 6.832812351543943E-3 | 0.18111916932907346 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 352 | نعم | نعم | 41.113288427604004 | 41.113288427604004 | 0 | 1 | No | 45316 | Out | 45273 | Out | 103 | 146 | No | 12.9048755686125 | 45.620709361387497 | 0 | 0 | 0 | 58.525584929999994 | 4984064.8097917093 | 27.633526 | 0.51231188246248494 | 0.61515149419993176 | -3.4419169329073518E-2 | 68.87 | -14.960000000000008 | R | 0 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 70 | 10259 | 06/23/2/08/0030/1 | مشروع إنشاء خزانات ومحطات توزيع المياه بامتداد جنوب محافظة تثليث | الجنوبي | منطقة عسير | مشاريع الحزمة الأولى | مياه | خزانات | 45468 | 46619 | 0.58557775847089488 | 27446950 | 27.446950000000001 | 31563992.5 | 31.563992500000001 | 0 | 31.563992500000001 | لا | تحت التنفيذ | متأخر | شركة مشروعات المياه والطاقة للمقاولات | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | 0 | 45930 | 0.50825369244135532 | 0.53258036490008687 | 0.55951346655082534 | 0.58557775847089488 | 0.61251086012163336 | 0.6385751520417029 | 0.66550825369244138 | 0.69244135534317985 | 0.71850564726324939 | 0.74543874891398787 | 0.7715030408340573 | 0.79843614248479577 | Null | 0 | 0 | 0 | 0 | 0 | 3.35 | 4.5 | 10.38 | 13.78 | 17.04 | 17.04 | 20.440000000000001 | 22.4 | 22.68 | 29.21 | 36.9 | 38.19 | 47.04 | 48.34 | 49.76 | 50.72 | 52.65 | 52.65 | 53.75 | 53.75 | 0 | 0 | 0 | 0 | 0.23300000000000001 | 1.929 | 3.629 | 5.7489999999999997 | 15.48 | 18.82 | 22 | 25.45 | 31.83 | 43.8 | 51.76 | 61.08 | 68.33 | 48.34 | 50.18 | 52.88 | 57.1 | 57.1 | 64.319999999999993 | 64.319999999999993 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 44.711000000000006 | 37.96 | 6.7510000000000048 | Good Progress | 1.9599999999999973 | 0.28000000000000114 | 6.5300000000000011 | 7.6899999999999977 | 1.2899999999999991 | 8.8500000000000014 | 1.3000000000000043 | 1.4199999999999946 | 0.96000000000000085 | 1.9299999999999997 | 0 | 1.1000000000000014 | 2.7758333333333329 | 0.7618815870833332 | 1151 | 0.58557775847089488 | 477 | 15.9 | 0.41442224152910512 | 0.47350000000000003 | 12996130.824999999 | 817366.71855345904 | 14945550.44875 | 939971.72633647802 | 9.9266247379454923E-4 | 2.9779874213836481E-2 | 31332.390877882597 | 1.4472102564102562E-2 | -5.9077758470894914E-2 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 275 | نعم | نعم | 16.96564596875 | 20.301959975999999 | 3.3363140072499995 | 0.89429999999999998 | No | 45445 | Out | 45403 | Out | 23 | 65 | No | 7.3672188291666663 | 23.020513670833335 | 0 | 0 | 0 | 30.387732500000002 | 2974590.6532000001 | 11.353566000000001 | 0.41365492340679022 | 0.49966689671891168 | 8.3777758470894859E-2 | 58.087499999999999 | -5.207499999999996 | R | 10.57 | Delayed | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 71 | P1611-1 | 24/23/2/11/0058/1 | عقد تنفيذ الخط الناقل للمياه الى مركزي العيينة والجبيلة بمحافظة الدرعية | الأوسط | وحدة عمل الرياض | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45522 | 46704 | 0.52453468697123518 | 93021476 | 93.021476000000007 | 106974697.40000001 | 106.97469740000001 | 0 | 106.97469740000001 | لا | تحت التنفيذ | منتظم | شركة عبر المملكة السعودية للتجارة والصناعة والمقاولات (سبك) | مكتب الياردة للاستشارات الهندسية | جاري | 46984 | 0 | 0.44923857868020306 | 0.47292724196277497 | 0.49915397631133673 | 0.52453468697123518 | 0.550761421319797 | 0.57614213197969544 | 0.60236886632825715 | 0.62859560067681897 | 0.65397631133671741 | 0.68020304568527923 | 0.70558375634517767 | 0.73181049069373938 | Null | 0 | 0 | 0 | 0.53 | 2.2599999999999998 | 7.19 | 16.95 | 19.73 | 21.55 | 23.39 | 26.43 | 30.24 | 35.49 | 42.2 | 47.01 | 50.12 | 52.86 | 53.53 | 55.55 | 55.55 | 60.02 | 60.02 | 0 | 0 | 0.59 | 2.41 | 5.86 | 9.5500000000000007 | 12.28 | 16.5 | 19.86 | 23.87 | 29.18 | 35.14 | 42.82 | 49.14 | 50.29 | 53.66 | 57.25 | 60.38 | 60.38 | 59.92 | 60.02 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 47.879999999999995 | 47.86 | 1.9999999999996021E-2 | Good Progress | 1.8399999999999999 | 3.0399999999999991 | 3.8099999999999987 | 5.2500000000000036 | 6.7100000000000009 | 4.8099999999999952 | 3.1099999999999994 | 2.740000000000002 | 0.67000000000000171 | 2.019999999999996 | 0 | 4.470000000000006 | 3.205833333333334 | 2.9821134847666673 | 1182 | 0.52453468697123518 | 562 | 18.733333333333334 | 0.47546531302876482 | 0.44450000000000001 | 41348046.082000002 | 2207191.0719928825 | 47550252.9943 | 2538269.732791815 | 7.909252669039146E-4 | 2.372775800711744E-2 | 84608.991093060511 | -6.32690909090909E-2 | 3.0965313028764818E-2 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 245 | نعم | نعم | 64.206213379480019 | 64.206213379480019 | 0 | 1 | No | 45509 | within time | 45469 | within time | 13 | 53 | Within Time | 26.852199405333334 | 73.103658994666674 | 0 | 0 | 0 | 99.955858400000011 | 8970898.1239640024 | 35.377809999999997 | 0.38031873413834022 | 0.53061803981212319 | -1.206531302876479E-2 | 62.477499999999999 | -5.2274999999999991 | R | 0 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 72 | AP618 | 25/23/2/02/0037/1 | مشروع تنفيذ الخطوط الفرعية غير المنفذة للصرف الصحى للعقد (12ن) جزء من حى الشاطىء (6) بجدة | الغربي | وحدة عمل جدة | مشاريع المدن الساحلية | صرف | خطوط وشبكات | 45575 | 46305 | 0.77671232876712326 | 20853200 | 20.853200000000001 | 23981180 | 23.981179999999998 | 0 | 23.981179999999998 | نعم | 46387 | نعم | تحت التنفيذ | متأخر | مؤسسة بناء و انماء للإنشاء و التعمير | شركة بيت الخبرة للاستشارات الهندسية | جاري | 46985 | 0 | 0.65479452054794518 | 0.69315068493150689 | 0.73561643835616441 | 0.77671232876712326 | 0.81917808219178079 | 0.86027397260273974 | 0.90273972602739727 | 0.9452054794520548 | 0.98630136986301364 | 1.0287671232876712 | 1.0698630136986302 | 1.1123287671232878 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 0.81 | 2.81 | 5.24 | 9.98 | 10.98 | 17.05 | 22.82 | 30.23 | 37.47 | 46.1 | 50.95 | 53.41 | 53.41 | 57.16 | 62.23 | 0 | 0 | 0 | 2.6 | 5.36 | 8.26 | 11 | 13.95 | 18.010000000000002 | 22.37 | 26.64 | 31.19 | 35.950000000000003 | 42.14 | 49.77 | 57.78 | 65.17 | 65.17 | 76.989999999999995 | 76.989999999999995 | 0 | 0 | 0 | 0 | 0 | 0 | 11630 | 0 | 0 | No | 42.14 | 37.47 | 4.6700000000000017 | Good Progress | 2.4300000000000002 | 4.74 | 1 | 6.07 | 5.77 | 7.41 | 7.2399999999999984 | 8.6300000000000026 | 4.8500000000000014 | 2.4599999999999937 | 0 | 3.75 | 4.5291666666666659 | 0.94447618333333327 | 730 | 0.77671232876712326 | 163.00000000000003 | 5.4333333333333345 | 0.22328767123287674 | 0.46590000000000004 | 9715505.8800000008 | 1788129.9165644171 | 11172831.762 | 2056349.4040490794 | 2.8582822085889566E-3 | 8.5748466257668701E-2 | 68544.980134969315 | 1.155828510638298E-2 | -0.2426123287671233 | مشاريع التحول الوطني | 14.923488313999998 | 18.463110481999998 | 3.5396221679999993 | 0.85240000000000005 | No | 45564 | within time | 45516 | within time | 11 | 59 | Within Time | 8.7930993333333323 | 10.474470666666665 | 0 | 0 | 0 | 19.267569999999999 | 9.0395319999999995 | 0.43348416549977936 | 0.46300706230021715 | 0.27901232876712323 | 59.6875 | -1.9074999999999989 | R | 14.76 | Delayed | R | مشاريع التحول الوطني | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 73 | 1249 | 05/18/2/13/0118/1 | تصميم وتنفيذ خطوط أنابيب ناقلة ومحطات ضخ لمياه الشرب والصرف الصحي بالمنطقة الشرقية المرحلة الثانية | الشرقي | المنطقة الشرقية | مبادرات | صرف | خطوط وشبكات | 43165 | 45696 | 1.1762149348083761 | 63323335.93 | 63.323335929999999 | 71844037.120000005 | 71.84403712000001 | 0 | 71.84403712000001 | نعم | 46387 | نعم | متوقع تعثره (مدة منقضية) | تحت التنفيذ | منتظم | شركة تيكتون العربية للمقاولات | شركة الخدمات الهندسية والفنية للإستشارات المهنية | جاري | 46996 | 0 | 1.1410509679968392 | 1.1521137890161992 | 1.1643619122876334 | 1.1762149348083761 | 1.1884630580798103 | 1.2003160806005531 | 1.2125642038719873 | 1.2248123271434215 | 1.2366653496641644 | 1.2489134729355986 | 1.2607664954563413 | 1.2730146187277755 | Null | متوقع تعثره (مدة منقضية) | ضعف اّداء المقاول فني وإداري | 0 | 0 | 78.650000000000006 | 78.760000000000005 | 80.02 | 80.62 | 82.12 | 83.22 | 74.23 | 74.23 | 77.98 | 83.2 | 85.48 | 86.55 | 87.32 | 88.35 | 90.02 | 90.53 | 93.26 | 93.74 | 93.97 | 95.06 | 95.45 | 95.91 | 97.2 | 97.59 | 97.71 | 97.71 | 98.26 | 98.66 | 100 | 100 | 100 | 100 | 100 | 100 | 74.12 | 74.12 | 83.85 | 93.15 | 98.06 | 99.46 | 99.97 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 0 | 0 | 0 | 0 | 0 | 0 | 10607 | 0 | 10000 | Ok | المشاريع المنقولة المدرجة ضمن خطة الاستلام 2026 م | 1.9399999999999977 | 10.429999999999993 | -8.4899999999999949 | Good Progress | 0.51000000000000512 | 2.730000000000004 | 0.47999999999998977 | 0.23000000000000398 | 1.0900000000000034 | 0.39000000000000057 | 0.45999999999999375 | 1.2900000000000063 | 0.39000000000000057 | 0.11999999999999034 | 0 | 0.55000000000001137 | 0.68666666666666742 | 0.43482024005266717 | 2531 | 1.1762149348083761 | -446 | -14.866666666666667 | -0.17621493480837613 | 2.2900000000000063E-2 | 1450104.392797004 | -97540.654224013721 | 1645228.4500480047 | -110665.5908104039 | -5.1345291479820766E-5 | -1.5403587443946229E-3 | -3688.8530270134629 | -0.19911493480837619 | مشاريع التحول الوطني | 70.881327022592004 | 71.84403712000001 | 0.9627100974080065 | 0.98659999999999992 | No | 43165 | within time | 43164 | within time | 0 | 1 | Within Time | 4.0579704441808317 | 67.786066675819171 | 0 | 0 | 0 | 71.844037119999996 | 52.914442999999999 | 0.83562311149389878 | 0.98019070002613229 | 0.17621493480837613 | 99.26 | 0.73999999999999488 | R | 1.34 | Regular | R | مشاريع التحول الوطني | ||||||||||||||||||||||||||||||||||||||||||||||||||
| 74 | AP1460 | 25/25/2/0/AP1460/1 | تصميم شبكات المياه والخط المغذى لعدد ( 7) مشاريع بمحافظة جدة بالشبكة العمومية | الغربي | وحدة عمل جدة | على حساب جهات أخرى ( حكومية / خاصة) | استشاري | تصميم | 45615 | 45796 | 2.9116022099447512 | 3460100 | 3.4601000000000002 | 3979115 | 3.9791150000000002 | 0 | 3.9791150000000002 | لا | إيقاف جزئي | استشاري | شركة فؤاد فهد الصالح وخالد حمد الضويلع للاستشارات الهندسية | 0 | 2.4198895027624308 | 2.5745856353591159 | 2.7458563535911602 | 2.9116022099447512 | 3.0828729281767955 | 3.2486187845303869 | 3.4198895027624308 | 3.5911602209944751 | 3.7569060773480665 | 3.9281767955801103 | 4.0939226519337018 | 4.2651933701657461 | Time Overrun | 45683 | Other Projects Interference | 90.85 | 90.85 | 90.85 | 90.85 | 90.85 | 90.85 | 90.85 | 90.85 | 90.85 | 90.85 | 90.85 | 90.85 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | No | 100 | 90.85 | 9.1500000000000057 | Good Progress | 0 | 90.85 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 7.5708333333333329 | 0.26195840416666666 | 181 | 2.9116022099447512 | -345.99999999999994 | -11.533333333333331 | -1.9116022099447512 | 9.1500000000000054E-2 | 316599.1500000002 | -27450.793352601177 | 364089.0225000002 | -31568.412355491353 | -2.6445086705202334E-4 | -7.9335260115606984E-3 | -1052.2804118497118 | -2.0031022099447511 | أخرى | نعم | 3.6150259775000002 | 3.9791150000000006 | 0.36408902250000041 | 0.90849999999999986 | No | 45615 | within time | 45601 | within time | 0 | 14 | Within Time | 2.6195840416666667 | 1.3595309583333335 | 0 | 0 | 0 | 3.9791150000000002 | 3.0926900000000002 | 0.89381520765295797 | 0.91669354632462263 | 1.9116022099447512 | 113.5625 | -13.5625 | Troubled | 9.15 | Delayed | Troubled | أخرى | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 75 | NA-00095 | 13/23/2/01/0008/1 | مشروع استكمال ربط شبكات المياه والخطوط الناقلة وتحسينها في مواقع متفرقة من محافظات منطقة نجران لمشروع إيصال | الجنوبي | منطقة نجران | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45630 | 46735 | 0.46334841628959278 | 6184910 | 6.1849100000000004 | 7112646.5 | 7.1126465000000003 | 0 | 7.1126465000000003 | لا | تحت التنفيذ | متقدم | شركة نبراس المتحدة للمقاولات | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | 0 | 0.38280542986425337 | 0.40814479638009049 | 0.43619909502262444 | 0.46334841628959278 | 0.49140271493212667 | 0.51855203619909507 | 0.5466063348416289 | 0.57466063348416285 | 0.60180995475113119 | 0.62986425339366514 | 0.65701357466063348 | 0.68506787330316743 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2.79 | 7.75 | 13.85 | 17.73 | 27.15 | 37.94 | 63.67 | 69.3 | 73.73 | 73.73 | 75.22 | 75.22 | 0 | 0 | 7.0000000000000007E-2 | 0.51 | 1.65 | 3.4 | 6.29 | 10.3 | 14.55 | 18.55 | 24.39 | 31.51 | 41.19 | 45.99 | 51.04 | 51.04 | 60.79 | 60.79 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 31.51 | 37.94 | -6.4299999999999962 | Good Progress | 0 | 2.79 | 4.96 | 6.1 | 3.8800000000000008 | 9.4199999999999982 | 10.79 | 25.730000000000004 | 5.6299999999999955 | 4.4300000000000068 | 0 | 1.4899999999999949 | 6.2683333333333335 | 0.38769077516666672 | 1105 | 0.46334841628959278 | 593 | 19.766666666666666 | 0.53665158371040722 | 0.26269999999999993 | 1624775.8569999998 | 82197.766795952775 | 1868492.2355499999 | 94527.431815345699 | 4.4300168634064068E-4 | 1.3290050590219222E-2 | 3150.9143938448556 | 4.426981481481479E-2 | 0.27395158371040729 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 315 | نعم | نعم | 5.3501326973000003 | 4.3237778073499999 | -1.0263548899500003 | 1.1443000000000001 | No | 45630 | within time | 45540 | Out | 0 | 90 | Within Time | 3.8001117858333338 | 0.97557971416666689 | 0 | 0 | 0 | 4.7756915000000006 | 768176.05492999987 | 1.534829 | 0.24815704674764869 | 0.63828394659172638 | 5.1448416289592791E-2 | 82.474999999999994 | -36.484999999999992 | R | -14.43 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 76 | P522 | 11/25/2/11/P522/1 | مشروع إنشاء الخطوط الناقلة من محطة تنقية المياه بالحميمة الى مركزي الجابرية وضبيعة والتجمعات السكنية التابعة لهما | الشمالي | منطقة حائل | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45686 | 46775 | 0.41873278236914602 | 47343276 | 47.343276000000003 | 54444767.399999999 | 54.444767399999996 | 0 | 54.444767399999996 | لا | تحت التنفيذ | منتظم | شركة العزم للانشاء والتعمير | شركة عبدالله عبدالرحمن السعيد للاستشارات الهندسية شركة مهنية شخص واحد | جاري | 46999 | 0 | 0.33700642791551882 | 0.36271808999081728 | 0.39118457300275483 | 0.41873278236914602 | 0.44719926538108357 | 0.47474747474747475 | 0.50321395775941236 | 0.5316804407713499 | 0.55922865013774103 | 0.58769513314967858 | 0.61524334251606982 | 0.64370982552800737 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 4.3 | 10.25 | 28.4 | 43.6 | 51.5 | 59 | 66 | 71.8 | 74.5 | 74.5 | 81 | 81 | 0 | 0 | 0 | 0.05 | 0.4 | 1.5 | 2.91 | 6.07 | 11.03 | 17.059999999999999 | 22.54 | 29.67 | 37.130000000000003 | 43.34 | 43.34 | 54.52 | 81 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 22.54 | 59 | -36.46 | Good Progress | 0 | 4.3 | 5.95 | 18.149999999999999 | 15.200000000000003 | 7.8999999999999986 | 7.5 | 7 | 5.7999999999999972 | 2.7000000000000028 | 0 | 6.5 | 6.75 | 3.19567113 | 1089 | 0.41873278236914602 | 633 | 21.1 | 0.58126721763085398 | 0.255 | 12072535.380000001 | 572158.07488151663 | 13883415.687000001 | 657981.78611374402 | 4.0284360189573459E-4 | 1.2085308056872038E-2 | 21932.72620379147 | 3.8425619834710741E-3 | 0.32626721763085398 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 359 | نعم | نعم | 44.100261593999996 | 44.100261593999996 | 0 | 1 | No | 45672 | within time | 45620 | Out | 14 | 66 | Within Time | 29.392283850000002 | 16.07787154999999 | 0 | 0 | 0 | 45.470155399999996 | 6693965.7693859097 | 23.981866 | 0.50655273623227925 | 0.66336026959672001 | 0.122032782369146 | 86.25 | -49.12 | R | 0 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 77 | AP1038-8 | 04/23/1/03/0009/1 | اتفاقية الخدمات الهندسية الاستشارية لإعداد الدراسات والتصاميم لمشاريع المياه والصرف الصحي بالقطاع الشمالي عقد (2) | الشمالي | منطقة القصيم | مشاريع الحزمة الأولى | استشاري | تصميم | 45323 | 46419 | 0.74726277372262773 | 91418560.859999999 | 91.418560859999999 | 105131344.98999999 | 105.13134498999999 | 0 | 105.13134498999999 | لا | تحت التنفيذ | استشاري | كونهوا للهندسة والاستشارات المحدودة | 0 | إتفاقية | 0.66605839416058399 | 0.69160583941605835 | 0.7198905109489051 | 0.74726277372262773 | 0.77554744525547448 | 0.8029197080291971 | 0.83120437956204385 | 0.85948905109489049 | 0.88686131386861311 | 0.91514598540145986 | 0.94251824817518248 | 0.97080291970802923 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 22.9 | 22.9 | 22.9 | 22.9 | 22.9 | 0 | 0 | 0 | 0 | 0 | 58.63 | 55.9 | 55 | 55.32 | 57.75 | 57.9 | 57.9 | 57.9 | 57.9 | 57.9 | 57.9 | 0 | 0 | 0 | 0 | 0 | 0 | 17.968015051740359 | 29 | 29 | 29 | 29 | 29 | 0 | 0 | 0 | 0 | 0 | 48.98 | 66.53 | 68.41 | 70.22 | 72.11 | 73.989999999999995 | 75.95 | 77.83 | 77.83 | 81.239999999999995 | 81.239999999999995 | استشاري عالمي تصميم | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 43.11 | 34.85 | 8.259999999999998 | Good Progress | 0 | 0 | 58.63 | -2.730000000000004 | -0.89999999999999858 | 0.32000000000000028 | 2.4299999999999997 | 0.14999999999999858 | 0 | 0 | 0 | 0 | 4.8250000000000002 | 4.4109455614950006 | 1096 | 0.74726277372262773 | 277 | 9.2333333333333325 | 0.25273722627737227 | 0.42100000000000004 | 38487214.122060001 | 4168290.3381292424 | 44260296.240789995 | 4793533.8888942236 | 1.5198555956678701E-3 | 4.5595667870036105E-2 | 159784.4629631408 | 5.9454447022428466E-3 | -0.16826277372262777 | المشاريع الاستراتيجية | نعم | 60.871048749209997 | 85.408704669875988 | 24.537655920665991 | 0.76660000000000006 | No | 45316 | within time | 45259 | Out | 7 | 64 | Within Time | 44.109455614950008 | 56.998067375049978 | 0 | 0 | 0 | 101.10752298999998 | 37.427503999999999 | 0.40940815134157649 | 0.58138021800279083 | 7.3627737226277246E-3 | 72.375 | 3.5750000000000028 | R | 23.34 | Delayed | SV | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||
| 78 | 10229 | 04/23/2/01/0014/1 | إنشاء شبكات مياه شرب متفرقة بمدينة بريدة.(مرحلة ثانية) | الشمالي | منطقة القصيم | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45337 | 46427 | 0.73853211009174313 | 24541184.32 | 24.541184319999999 | 28222361.969999999 | 28.222361969999998 | 0 | 28.222361969999998 | لا | تحت التنفيذ | منتظم | شركة عبد المحسن شعبان القحطانى للمقاولات | شركة عبدالله عبدالرحمن السعيد للاستشارات الهندسية شركة مهنية شخص واحد | جاري | 46999 | 0 | 0.65688073394495416 | 0.68256880733944958 | 0.71100917431192656 | 0.73853211009174313 | 0.76697247706422023 | 0.79449541284403669 | 0.82293577981651378 | 0.85137614678899087 | 0.87889908256880733 | 0.90733944954128443 | 0.93486238532110089 | 0.96330275229357798 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 0.34 | 1.65 | 1.65 | 6 | 8.5 | 12.4 | 16.600000000000001 | 19.8 | 26 | 30.7 | 38.200000000000003 | 45.6 | 51.1 | 62.2 | 69.64 | 72.2 | 74 | 74.3 | 75.48 | 77.69 | 77.69 | 80.099999999999994 | 80.099999999999994 | 0 | 0 | 0 | 1.06 | 3.67 | 5.46 | 5.46 | 11.42 | 15.72 | 21.15 | 25.98 | 38.74 | 43.71 | 48.93 | 56.58 | 61.55 | 64.959999999999994 | 72.010000000000005 | 76.87 | 82.08 | 73.16 | 74.28 | 78.489999999999995 | 75.489999999999995 | 75.489999999999995 | 80.290000000000006 | 80.290000000000006 | 0 | 0 | 0 | 0 | 0 | 0 | 82500 | 0 | 0 | 0 | No | 52.01 | 61.6 | -9.5900000000000034 | Good Progress | 7.5000000000000036 | 7.3999999999999986 | 5.5 | 11.100000000000001 | 7.4399999999999977 | 2.5600000000000023 | 1.7999999999999972 | 0.29999999999999716 | 1.1800000000000068 | 2.2099999999999937 | 0 | 2.4099999999999966 | 4.1166666666666663 | 1.0102787545066665 | 1090 | 0.73853211009174313 | 285 | 9.5 | 0.26146788990825687 | 0.22310000000000002 | 5475138.2217920003 | 576330.33913600002 | 6296408.9555070009 | 662779.89005336852 | 7.8280701754385976E-4 | 2.3484210526315791E-2 | 22092.66300177895 | 3.8367889908256847E-2 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 150 | نعم | نعم | 22.606111937969995 | 22.659734425713001 | 5.362248774300582E-2 | 0.99809999999999977 | No | 45327 | within time | 45259 | Out | 10 | 78 | Within Time | 9.6099187599733327 | 17.328320210026668 | 0 | 0 | 0 | 26.93823897 | 1450629.4052579999 | 16.140135000000001 | 0.65767547277033778 | 0.74791887902355669 | -4.2678899082568833E-3 | 86.649999999999991 | -8.1599999999999966 | R | 0.19 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||
| 79 | AP319 | 12/23/2/01/0002/1 | مشروع استكمال تنفيذ المرحلة الثالثة لشبكات مياه الشرب بقري صبيا بمنطقة جازان | الجنوبي | منطقة جازان | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45536 | 46626 | 0.55596330275229355 | 10986700 | 10.986700000000001 | 12634705 | 12.634705 | 0 | 12.634705 | لا | تحت التنفيذ | متقدم | شركة العرض الانشائي للمقاولات شركة شخص واحد | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | 0 | 0.47431192660550459 | 0.5 | 0.52844036697247709 | 0.55596330275229355 | 0.58440366972477065 | 0.61192660550458711 | 0.6403669724770642 | 0.66880733944954129 | 0.69633027522935775 | 0.72477064220183485 | 0.75229357798165142 | 0.7807339449541284 | Null | 0 | 0 | 0 | 0 | 0 | 3.64 | 7.89 | 11.18 | 15.22 | 20.45 | 26.34 | 32.5 | 41.29 | 48.76 | 51.54 | 57.17 | 59.81 | 63.29 | 63.29 | 63.29 | 70.02 | 70.02 | 0 | 0 | 0 | 2.5000000000000001E-2 | 3.0009999999999999 | 5.65 | 8.82 | 12.5 | 18.350000000000001 | 22.17 | 26.79 | 31.07 | 36.65 | 40.97 | 47.06 | 58.28 | 60.67 | 60.67 | 60.67 | 67.930000000000007 | 67.930000000000007 | 0 | 0 | 0 | 0 | 0 | 0 | 29700 | 0 | 5000 | 0 | No | 47.035000000000004 | 57.17 | -10.134999999999998 | Good Progress | 5.2299999999999986 | 5.8900000000000006 | 6.16 | 8.7899999999999991 | 7.4699999999999989 | 2.7800000000000011 | 5.6300000000000026 | 2.6400000000000006 | 3.4799999999999969 | 0 | 0 | 6.7299999999999969 | 4.5666666666666664 | 0.50172596666666669 | 1090 | 0.55596330275229355 | 484 | 16.133333333333333 | 0.44403669724770645 | 0.36709999999999998 | 4033217.57 | 249992.82458677684 | 4638200.2055000002 | 287491.74827479338 | 7.5847107438016526E-4 | 2.2754132231404958E-2 | 9583.0582758264463 | 1.2819132E-2 | 7.6936697247706465E-2 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 215 | نعم | نعم | 8.8468204410000002 | 8.5827551065000005 | -0.26406533449999969 | 1.0208999999999999 | No | 45508 | Out | 45483 | within time | 28 | 53 | Within Time | 4.4010889083333335 | 6.6111700916666667 | 0 | 0 | 0 | 11.012259 | 929828.84530001157 | 4.8622009999999998 | 0.442553359971602 | 0.6007586777135423 | -2.6836697247706431E-2 | 73.510000000000005 | -12.840000000000003 | R | -2.09 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 80 | NA-00173 | 6/25/2/12/NA-00173/1 | ترحيل خدمات المياه المتعارضة مع مشروع استكمال تقاطع المدينة العسكرية | الجنوبي | منطقة عسير | على حساب جهات أخرى ( حكومية / خاصة) | مياه | خطوط وشبكات | 45797 | 46052 | 1.3529411764705883 | 3516800 | 3.5167999999999999 | 4044320 | 4.0443199999999999 | 0 | 4.0443199999999999 | نعم | 46142 | نعم | متوقع تعثره (مدة منقضية) | تحت التنفيذ | متعثر | شركة اتحاد الرواد للمقاولات | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | ضعف أداء المقاول | 0 | 1.003921568627451 | 1.1137254901960785 | 1.2352941176470589 | 1.3529411764705883 | 1.4745098039215687 | 1.5921568627450979 | 1.7137254901960783 | 1.8352941176470587 | 1.9529411764705882 | 2.0745098039215688 | 2.1921568627450982 | 2.3137254901960786 | Time Overrun | متوقع تعثره (مدة منقضية) | 45897 | Other Projects Interference | 14.05 | 14.05 | 14.05 | 14.05 | 25.05 | 36.36 | 75.92 | 75.92 | 75.92 | 75.92 | 28.7 | 53.89 | 77.22 | 77.22 | 25.05 | 50.36 | 100 | 100 | 100 | 100 | 0 | 0 | 0 | 710 | No | 77.22 | 14.05 | 63.17 | Low Progress | 0 | 0 | 0 | 14.05 | 0 | 0 | 0 | 11 | 11.309999999999999 | 39.56 | 0 | 0 | 6.3266666666666671 | 0.22249621333333333 | 255 | 1.3529411764705883 | -90.000000000000014 | -3.0000000000000004 | -0.35294117647058831 | 0.24079999999999999 | 846845.43999999994 | -282281.8133333333 | 973872.25599999994 | -324624.08533333329 | -2.6755555555555552E-3 | -8.0266666666666653E-2 | -10820.802844444443 | 3.3682453987730061E-3 | -0.59374117647058833 | أخرى | 3.070447744 | 4.0443199999999999 | 0.97387225599999994 | 0.75919999999999999 | No | 45761 | Out | 45761 | within time | 36 | 36 | Within Time | 2.2249621333333334 | 1.1129178666666668 | 0 | 0 | 0 | 3.3378800000000002 | 1.51434 | 0.43060168334849863 | 0.25158332201964068 | 1.1024411764705884 | 44.03 | 6.3299999999999983 | Troubled | 24.08 | Delayed | SV | أخرى | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 81 | 1008 | 25/22/2/11/0005/1 | إنشاء خطوط مياه قطر ( 400 ملم) وأكبر حول خليج أبحر وشارع الأمير عبدالله الفيصل وشمال مطار الملك عبد العزيز | الغربي | وحدة عمل جدة | المشاريع الملحة | مياه | خطوط وشبكات | 44810 | 45879 | 1.2460243217960711 | 76536935 | 76.536935 | 88017475.25 | 88.017475250000004 | 0 | 88.017475250000004 | نعم | 46387 | نعم | متوقع تعثره (مدة منقضية) | تحت التنفيذ | متأخر | شركة الإنجاز للتجارة والمقاولات | شركة فيوتشر كونسلت للاستشارات الهندسية | منتهي | 46130 | 0 | 1.1627689429373247 | 1.1889616463985033 | 1.2179607109448083 | 1.2460243217960711 | 1.2750233863423761 | 1.303086997193639 | 1.3320860617399439 | 1.3610851262862489 | 1.3891487371375117 | 1.4181478016838167 | 1.4462114125350796 | 1.4752104770813845 | Null | متوقع تعثره (مدة منقضية) | اسباب داخلية | معاملة أمر تغيير بالتخفيض لدى لجنة المفاوضات والترسية بالقطاع | 0 | 0 | 32.36 | 37.659999999999997 | 41.81 | 45.25 | 51.08 | 56.31 | 57.65 | 57.65 | 59.94 | 64.504000000000005 | 70 | 75.02 | 75.02 | 75.02 | 75.02 | 75.02 | 75.02 | 79.09 | 79.09 | 79.09 | 79.09 | 79.09 | 79.09 | 79.09 | 79.09 | 79.09 | 79.09 | 79.09 | 29.69 | 40.68 | 51.34 | 61.63 | 70.78 | 78 | 86.74 | 86.74 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 78.599999999999994 | 79.73 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | خليج أبحر وشارع الأمير عبد الله وشمال مطار الملك عبد العزيز | 0 | 0 | 0 | 0 | 0 | 0 | 46299 | 0 | 0 | شمال جدة | No | 0 | 9.0900000000000034 | -9.0900000000000034 | Good Progress | 0 | 0 | 4.0700000000000074 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.33916666666666728 | 0.25958777120833382 | 1069 | 1.2460243217960711 | -263.00000000000006 | -8.7666666666666693 | -0.24602432179607114 | 0.20909999999999995 | 16003873.108499996 | -1825536.8564828888 | 18404454.074774995 | -2099367.3849553219 | -7.9505703422053195E-4 | -2.3851711026615961E-2 | -69978.912831844078 | 1.3922999999999994E-2 | -0.4551243217960711 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | 69.613021175225001 | 88.017475250000004 | 18.404454074775003 | 0.79089999999999994 | No | 44801 | within time | 44623 | Out | 9 | 187 | Within Time | 2.5958777120833383 | 81.422148537916669 | 0 | 0 | 0 | 84.018026250000005 | 19823428.600000001 | 49.908889000000002 | 0.65208894241714799 | 0.79609122283566491 | 0.24602432179607114 | 80.107500000000002 | 19.892499999999998 | R | 20.91 | Delayed | SV | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||
| 82 | P347 | 05/23/2/02/0019/1 | إستكمال شبكات الصرف الصحي لمدينتي الهفوف والمبرز ( المرحلة الأولى ) شرق المحدود وعين نجم والجامعيين- الجزء الأول | الشرقي | المنطقة الشرقية | مشاريع الحزمة الأولى | صرف | خطوط وشبكات | 45385 | 46530 | 0.66113537117903931 | 55252540 | 55.252540000000003 | 63540421 | 63.540421000000002 | 0 | 63.540421000000002 | لا | متوقع تعثره (مدة منقضية) | إيقاف جزئي | متأخر | شركة إعمار السعودية للإنشاء والتطوير | شركة الخدمات الهندسية والفنية للإستشارات المهنية | جاري | 46996 | 0 | 45838 | 0.58340611353711791 | 0.60786026200873366 | 0.63493449781659383 | 0.66113537117903931 | 0.68820960698689959 | 0.71441048034934496 | 0.74148471615720524 | 0.76855895196506552 | 0.79475982532751088 | 0.82183406113537116 | 0.84803493449781664 | 0.87510917030567681 | Null | متوقع تعثره (مدة منقضية) | ضعف اّداء المقاول فني وإداري | 45911 | V.Order | 0 | 0 | 0 | 0.5 | 0.5 | 5.7 | 6.5 | 10 | 12 | 12 | 18 | 19.75 | 20.6 | 21.99 | 22.65 | 32.4 | 33.89 | 34.22 | 35.17 | 36.200000000000003 | 36.729999999999997 | 38.619999999999997 | 38.619999999999997 | 40.83 | 40.83 | 0 | 0 | 0 | 2.56 | 9.7799999999999994 | 9.7799999999999994 | 18.71 | 23.27 | 28.61 | 12.6 | 15.86 | 18.940000000000001 | 21.65 | 24.22 | 28.77 | 34.17 | 42.03 | 50.93 | 57.79 | 65.209999999999994 | 37.619999999999997 | 40.86 | 45.63 | 45.63 | 56.81 | 56.81 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 73480 | 0 | 0 | No | 36.599999999999994 | 25.17 | 11.429999999999993 | Low Progress | 0.85000000000000142 | 1.389999999999997 | 0.66000000000000014 | 9.75 | 1.490000000000002 | 0.32999999999999829 | 0.95000000000000284 | 1.0300000000000011 | 0.52999999999999403 | 1.8900000000000006 | 0 | 2.2100000000000009 | 1.7566666666666666 | 0.97060295266666674 | 1145 | 0.66113537117903931 | 388 | 12.933333333333334 | 0.33886462882096069 | 0.61380000000000001 | 33914009.052000001 | 2622217.194742268 | 39001110.4098 | 3015549.7739536082 | 1.5819587628865979E-3 | 4.7458762886597942E-2 | 100518.3257984536 | 1.10484E-2 | -0.27493537117903932 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 345 | نعم | نعم | 25.943553894299999 | 36.097313170100001 | 10.153759275800002 | 0.84019999999999995 | No | 45372 | within time | 45350 | within time | 13 | 35 | Within Time | 8.6884619149999995 | 48.746300085000001 | 0 | 0 | 0 | 57.434761999999999 | 7515560.9958799994 | 12.731583000000001 | 0.23042529809489301 | 0.36283606608687646 | 0.28493537117903933 | 41.47 | -0.60999999999999943 | R | 15.98 | Delayed | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||
| 83 | 10202 | 01/23/2/01/0026/1 | عقد تنفيذ شبكات المياه بمحافظة عفيف | الأوسط | منطقة الرياض | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45396 | 46551 | 0.64588744588744584 | 32734350 | 32.734349999999999 | 37644502.5 | 37.644502500000002 | 0 | 37.644502500000002 | لا | تحت التنفيذ | منتظم | شركة قلاع الانشاء للمقاولات المحدودة | مكتب الياردة للاستشارات الهندسية | جاري | 46984 | 0 | 0.5688311688311688 | 0.59307359307359309 | 0.61991341991341986 | 0.64588744588744584 | 0.67272727272727273 | 0.69870129870129871 | 0.72554112554112549 | 0.75238095238095237 | 0.77835497835497836 | 0.80519480519480524 | 0.83116883116883122 | 0.858008658008658 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5.82 | 8.5399999999999991 | 14.53 | 22.64 | 26.84 | 32.24 | 34.450000000000003 | 36.979999999999997 | 42.19 | 45.49 | 51.33 | 56.16 | 62.01 | 66.010000000000005 | 70.97 | 72.61 | 73.459999999999994 | 73.459999999999994 | 76.95 | 76.95 | 0 | 0 | 0 | 0.46300000000000002 | 2.4929999999999999 | 2.4929999999999999 | 8.5860000000000003 | 13.484999999999999 | 17.879000000000001 | 22.308 | 26.25 | 32.65 | 38.93 | 43.47 | 48.73 | 54.03 | 59.19 | 66.19 | 72.569999999999993 | 65.319999999999993 | 68.930000000000007 | 72.64 | 76.45 | 76.45 | 83.98 | 76.95 | 0 | 0 | 0 | 0 | 0 | 0 | 80000 | 0 | 0 | 0 | No | 47.440999999999988 | 51.480000000000004 | -4.0390000000000157 | Good Progress | 2.529999999999994 | 5.2100000000000009 | 3.3000000000000043 | 5.8399999999999963 | 4.8299999999999983 | 5.8500000000000014 | 4.0000000000000071 | 4.9599999999999937 | 1.6400000000000006 | 0.84999999999999432 | 0 | 3.4900000000000091 | 3.5416666666666665 | 1.1593415624999999 | 1155 | 0.64588744588744584 | 409.00000000000006 | 13.633333333333335 | 0.35411255411255416 | 0.26540000000000008 | 8687696.4900000021 | 637239.35134474339 | 9990850.9635000024 | 732825.25404645491 | 6.4889975550122265E-4 | 1.9466992665036677E-2 | 24427.508468215165 | 4.5658862559241724E-3 | 8.8712554112554076E-2 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 160 | نعم | نعم | 28.967444673750002 | 28.967444673750002 | 0 | 1 | No | 45369 | Out | 45343 | within time | 27 | 53 | Within Time | 10.641391612499998 | 23.752221887500003 | 0 | 0 | 0 | 34.393613500000001 | 8587403.6710000001 | 18.742716999999999 | 0.57257031222553678 | 0.71378693206555277 | -4.341255411255418E-2 | 81.594999999999999 | -8.9549999999999983 | R | 0 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 84 | 10238 | 25/23/2/02/0023/1 | مشروع تنفيذ الخطوط الفرعية غير المنفذة للصرف الصحى للعقد (12د) حى الشاطىء(2) بجدة | الغربي | وحدة عمل جدة | مشاريع المدن الساحلية | صرف | خطوط وشبكات | 45343 | 46073 | 1.0945205479452054 | 50121350 | 50.12135 | 57639552.5 | 57.639552500000001 | 0 | 57.639552500000001 | نعم | 46295 | نعم | ضمن المتعثر خلال العام 2026 | تحت التنفيذ | متعثر | شركة تي ايه انفرا بروجكتس السعودية | شركة بيت الخبرة للاستشارات الهندسية | جاري | 46985 | ضعف السيولة | 0 | 0.9726027397260274 | 1.010958904109589 | 1.0534246575342465 | 1.0945205479452054 | 1.1369863013698631 | 1.178082191780822 | 1.2205479452054795 | 1.263013698630137 | 1.3041095890410959 | 1.3465753424657534 | 1.3876712328767122 | 1.4301369863013698 | Null | متوقع تعثره (مدة منقضية) | اسباب خاصة بالمقاول | ضعف كفاءة المقاول الفنية والمالية لانجاز الأعمال وفق البرنامج الزمني المعتمد | ضعف اّداء المقاول فني وإداري | 0 | 0 | 0 | 0 | 0 | 0 | 0.16 | 1.33 | 1.33 | 3.98 | 6.13 | 7.83 | 13.52 | 18.36 | 20.8 | 22.92 | 23.87 | 25.25 | 26.3 | 30.38 | 34.11 | 40.619999999999997 | 47.56 | 63.48 | 66.31 | 67.569999999999993 | 67.569999999999993 | 69.38 | 69.38 | 0 | 0 | 0.13 | 1.1599999999999999 | 2.97 | 6.23 | 6.23 | 13.88 | 19.09 | 25.08 | 31.07 | 37.21 | 43.39 | 50.35 | 57.57 | 64.67 | 71.78 | 78.16 | 83.71 | 88.01 | 92.05 | 63.48 | 74.709999999999994 | 87.82 | 100 | 100 | 100 | 0 | 0 | 0 | 0 | 0 | 0 | 16418 | 0 | 0 | No | 66.97 | 39.730000000000004 | 27.239999999999995 | Low Progress | 0.94999999999999929 | 1.379999999999999 | 1.0500000000000007 | 4.0799999999999983 | 3.7300000000000004 | 6.509999999999998 | 6.9400000000000048 | 15.919999999999995 | 2.8300000000000054 | 1.2599999999999909 | 0 | 1.8100000000000023 | 3.8716666666666661 | 1.9405316008333329 | 730 | 1.0945205479452054 | -68.999999999999915 | -2.2999999999999972 | -9.4520547945205369E-2 | 0.32430000000000009 | 16254353.805000002 | -7067110.3500000099 | 18692506.875750002 | -8127176.902500011 | -4.7000000000000071E-3 | -0.14100000000000021 | -270905.89675000042 | 6.0003333333333349E-3 | -0.41882054794520546 | مشاريع التحول الوطني | 39.990321524499997 | 57.639552500000001 | 17.649230975500004 | 0.69379999999999997 | No | 45328 | within time | 45271 | Out | 15 | 72 | Within Time | 18.649318979166662 | 33.311050520833341 | 0 | 0 | 0 | 51.960369499999999 | 26.745124000000001 | 0.5336074148042701 | 0.63820551193336594 | 0.45972054794520545 | 75.094999999999999 | -0.38500000000000512 | R | 30.62 | Troubled | Troubled | مشاريع التحول الوطني | |||||||||||||||||||||||||||||||||||||||||||||||||
| 85 | 10288 | 06/23/2/12/0036/1 | مشروع تنفيذ خطوط فرعية للصرف الصحي بأحياء متفرقة في مدينة خميس مشيط – مرحلة ثالثة | الجنوبي | منطقة عسير | مشاريع الحزمة الأولى | صرف | خطوط وشبكات | 45508 | 46432 | 0.68614718614718617 | 10488650 | 10.48865 | 12061947.5 | 12.0619475 | 0 | 12.0619475 | لا | متوقع تعثره (مدة منقضية) | تحت التنفيذ | منتظم | شركة بكري أحمد حسن ال صعب للمقاولات شركة شخص واحد | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | 0 | 0.58982683982683981 | 0.62012987012987009 | 0.65367965367965364 | 0.68614718614718617 | 0.71969696969696972 | 0.75216450216450215 | 0.7857142857142857 | 0.81926406926406925 | 0.85173160173160178 | 0.88528138528138534 | 0.91774891774891776 | 0.95129870129870131 | Null | متوقع تعثره (مدة منقضية) | 45880 | Permissions | 0 | 0 | 0.6 | 0.7 | 1.3 | 4.9000000000000004 | 10.11 | 14.51 | 16.66 | 19.14 | 20.2 | 21 | 27 | 34 | 36.549999999999997 | 38.99 | 41 | 43 | 43 | 46 | 46 | 0 | 0 | 0 | 0.76200000000000001 | 5.2270000000000003 | 10.686999999999999 | 14.5 | 19.2 | 25.5 | 34.049999999999997 | 43.89 | 53.63 | 28.81 | 36.57 | 47.34 | 37.5 | 44.87 | 44.66 | 56.72 | 56.72 | 46.42 | 46 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 12500 | 0 | 0 | No | 32.272999999999996 | 35.849999999999994 | -3.5769999999999982 | Good Progress | 2.1500000000000004 | 2.4800000000000004 | 1.0599999999999987 | 0.80000000000000071 | 6 | 7 | 2.5499999999999972 | 2.4400000000000048 | 2.009999999999998 | 2 | 0 | 3 | 2.624166666666667 | 0.27523965708333337 | 924 | 0.68614718614718617 | 290 | 9.6666666666666661 | 0.31385281385281383 | 0.56999999999999995 | 5978530.5 | 618468.67241379316 | 6875310.0750000002 | 711238.97327586217 | 1.9655172413793102E-3 | 5.8965517241379301E-2 | 23707.965775862067 | 2.2351181102362207E-2 | -0.25614718614718612 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 243 | نعم | نعم | 5.5484958500000001 | 5.5484958500000001 | 0 | 1 | No | 45490 | Out | 45448 | within time | 18 | 60 | Within Time | 2.4901803208333337 | 8.8919981791666665 | 0 | 0 | 0 | 11.3821785 | 1335016.3493000001 | 3.2160250000000001 | 0.30661953635596573 | 0.39109918651237624 | 0.23744718614718618 | 46.862500000000004 | -2.2025000000000077 | R | 0 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 86 | NA-00056 | 07/23/2/11/0030/1 | مشروع خطوط نقل محطتي تنقية الاجفر وتربة مع تجهيز الآبار ومحطات الضخ والخطوط الناقلة وايصال التيار الكهربائي المرحلة الأولى | الشمالي | منطقة حائل | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45595 | 46406 | 0.67447595561035756 | 105713727 | 105.71372700000001 | 121570786.05 | 121.57078605 | 0 | 121.57078605 | لا | تحت التنفيذ | متقدم | شركة مسعود بالعيد حيدر ال حيدر وشركاه للتجاره والمقاولات العامه | شركة عبدالله عبدالرحمن السعيد للاستشارات الهندسية شركة مهنية شخص واحد | جاري | 46999 | 0 | 45716 | 0.56473489519112208 | 0.5992601726263872 | 0.63748458692971643 | 0.67447595561035756 | 0.71270036991368679 | 0.74969173859432803 | 0.78791615289765726 | 0.82614056720098639 | 0.86313193588162762 | 0.90135635018495686 | 0.93834771886559798 | 0.97657213316892721 | Null | 0 | 0 | 0 | 0 | 0 | 0.81 | 8.75 | 15 | 21.51 | 29.8 | 33.770000000000003 | 40.06 | 47.31 | 52.6 | 55.63 | 63.91 | 65.08 | 67.34 | 67.34 | 69.86 | 70.19 | 0 | 0 | 0 | 0 | 2.2000000000000002 | 4.53 | 7.68 | 10.23 | 13.75 | 19.28 | 26.04 | 31.81 | 37.6 | 43.32 | 49.41 | 55.87 | 65.83 | 65.83 | 68.239999999999995 | 68.239999999999995 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 43.32 | 55.63 | -12.310000000000002 | Good Progress | 6.5100000000000016 | 8.2899999999999991 | 3.9700000000000024 | 6.2899999999999991 | 7.25 | 5.2899999999999991 | 3.0300000000000011 | 8.279999999999994 | 1.1700000000000017 | 2.2600000000000051 | 0 | 2.519999999999996 | 4.5716666666666663 | 4.8328792193499996 | 811 | 0.67447595561035756 | 264 | 8.8000000000000007 | 0.32552404438964244 | 0.32659999999999995 | 34526103.238199994 | 3923420.8225227264 | 39705018.723929994 | 4511933.945901135 | 1.237121212121212E-3 | 3.7113636363636356E-2 | 150397.79819670453 | 5.0759083333333319E-3 | -1.0759556103575041E-3 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | 85.330534728494982 | 82.959904400519989 | -2.3706303279749932 | 1.0194999999999999 | No | 45581 | within time | 45532 | Out | 14 | 63 | Within Time | 46.108803926500016 | 62.741167123499977 | 0 | 0 | 0 | 108.84997104999999 | 41492109.278864995 | 53.517564999999998 | 0.50624991208568393 | 0.64235190595919911 | 0.18037595561035757 | 77.625 | -21.755000000000003 | R | -1.95 | Regular | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 87 | P719 | 12/23/2/09/0006/1 | استكمال اعمال المواقع العامة لمحطات منطقة جازان | الجنوبي | منطقة جازان | مشاريع الحزمة الأولى | أخرى | أخرى | 45578 | 46723 | 0.49257641921397383 | 15746660 | 15.74666 | 18108659 | 18.108658999999999 | 0 | 18.108658999999999 | لا | تحت التنفيذ | متأخر | شركة العرض الانشائي للمقاولات شركة شخص واحد | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | 0 | 0.41484716157205243 | 0.43930131004366813 | 0.46637554585152841 | 0.49257641921397383 | 0.51965065502183405 | 0.54585152838427953 | 0.5729257641921397 | 0.6 | 0.62620087336244545 | 0.65327510917030562 | 0.6794759825327511 | 0.70655021834061138 | Null | 0 | 0 | 0 | 0 | 0.28000000000000003 | 0 | 3.27 | 4.47 | 4.97 | 7.27 | 15.55 | 15.9 | 19.39 | 27.67 | 30.18 | 30.42 | 34.869999999999997 | 40.340000000000003 | 40.340000000000003 | 45.76 | 45.76 | 0 | 0 | 0 | 0 | 1.83 | 4.4400000000000004 | 6.08 | 8.4 | 11.79 | 14.61 | 21.09 | 28.22 | 35.700000000000003 | 43.79 | 36.51 | 42.9 | 50.16 | 50.16 | 64.260000000000005 | 64.260000000000005 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 43.79 | 30.18 | 13.61 | Low Progress | 0.5 | 2.2999999999999998 | 8.2800000000000011 | 0.34999999999999964 | 3.49 | 8.2800000000000011 | 2.509999999999998 | 0.24000000000000199 | 4.4499999999999957 | 5.470000000000006 | 0 | 5.4199999999999946 | 3.4408333333333334 | 0.54181632616666664 | 1145 | 0.49257641921397383 | 580.99999999999989 | 19.366666666666664 | 0.50742358078602612 | 0.59660000000000002 | 9394457.3559999987 | 485083.85659208265 | 10803625.9594 | 557846.43508089508 | 1.0268502581755596E-3 | 3.0805507745266789E-2 | 18594.881169363172 | 9.0776133518776086E-3 | -8.9176419213973901E-2 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 333 | نعم | نعم | 8.2865223583999992 | 11.636624273400001 | 3.3501019150000015 | 0.81499999999999995 | No | 45536 | Out | 45502 | Out | 42 | 76 | No | 4.7069391183333344 | 11.122001881666666 | 0 | 0 | 0 | 15.828941 | 2068008.8578000003 | 2.7570389999999998 | 0.17508722484641187 | 0.3047335495150218 | 0.12747641921397385 | 40.7425 | 2.1574999999999989 | R | 18.5 | Delayed | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 88 | P1605-2 | 01/23/2/01/0041/1 | عقد استكمال مشاريع المياه بمحافظة الخرج (المرحلة الاولي) | الأوسط | منطقة الرياض | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45545 | 46699 | 0.51733102253032925 | 178900000 | 178.9 | 205735000 | 205.73500000000001 | 0 | 205.73500000000001 | لا | تحت التنفيذ | منتظم | شركة فداك العالمية للمقاولات | مكتب الياردة للاستشارات الهندسية | جاري | 46984 | 0 | 0.44020797227036396 | 0.46447140381282498 | 0.49133448873483537 | 0.51733102253032925 | 0.54419410745233965 | 0.57019064124783359 | 0.59705372616984398 | 0.62391681109185437 | 0.64991334488734831 | 0.6767764298093587 | 0.70277296360485264 | 0.72963604852686303 | Null | 0 | 0 | 0 | 0.15 | 2.36 | 10.24 | 16.11 | 26.95 | 34.21 | 38.29 | 44.41 | 50.21 | 53.12 | 60.57 | 64.17 | 65.72 | 66.66 | 67 | 67.3 | 67.3 | 68.31 | 68.31 | 0 | 0 | 0 | 0.58299999999999996 | 1.7170000000000001 | 3.49 | 6.94 | 10.18 | 13.51 | 18.82 | 23.73 | 30.35 | 38.11 | 44.26 | 50.95 | 66.650000000000006 | 68.34 | 70.05 | 70.05 | 73.680000000000007 | 68.31 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 50.367000000000004 | 63.36 | -12.992999999999995 | Good Progress | 4.0799999999999983 | 6.1199999999999974 | 5.8000000000000043 | 2.9099999999999966 | 7.4500000000000028 | 3.6000000000000014 | 1.5499999999999972 | 0.93999999999999773 | 0.34000000000000341 | 0.29999999999999716 | 0 | 1.0100000000000051 | 2.8416666666666668 | 5.0837416666666675 | 1154 | 0.51733102253032925 | 557 | 18.566666666666666 | 0.48266897746967075 | 0.32700000000000001 | 58500300.000000007 | 3150824.0574506288 | 67275345.000000015 | 3623447.6660682233 | 5.8707360861759428E-4 | 1.7612208258527828E-2 | 120781.58886894076 | 5.8815860517435316E-3 | 0.15566897746967073 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 164 | نعم | نعم | 140.53757850000002 | 140.53757850000002 | 0 | 1 | No | 45533 | within time | 45516 | within time | 12 | 29 | Within Time | 49.331675000000004 | 151.27908000000002 | 0 | 0 | 0 | 200.61075500000004 | 11546221.130652368 | 108.79212200000001 | 0.60811694801565119 | 0.67067850968408771 | -0.14916897746967084 | 75.185000000000002 | -6.8449999999999989 | R | 0 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 89 | P437-1 | 05/22/1/02/0016/1 | الاشراف علي تنفيذ خط الفائض البحري لمحطة معالجة الصرف الصحي غرب الدمام | الشرقي | المنطقة الشرقية | المشاريع الملحة | استشاري | إشراف | 45025 | 46243 | 0.9170771756978654 | 10420000 | 10.42 | 11983000 | 11.983000000000001 | 0 | 11.983000000000001 | لا | تحت التنفيذ | استشاري | (شركة المهندسون الاستشاريون العرب ( محرم - باخ | 0 | 0.84400656814449915 | 0.86699507389162567 | 0.89244663382594414 | 0.9170771756978654 | 0.94252873563218387 | 0.96715927750410513 | 0.9926108374384236 | 1.0180623973727423 | 1.0426929392446633 | 1.0681444991789819 | 1.0927750410509032 | 1.1182266009852218 | Null | 0 | 0 | 23.6 | 29.6 | 34.32 | 37.32 | 40.450000000000003 | 42.8 | 46.25 | 46.25 | 50.64 | 53.6 | 53.6 | 53.6 | 53.6 | 53.6 | 69.06 | 72.150000000000006 | 74.53 | 76.36 | 78.569999999999993 | 80.510000000000005 | 82.16 | 83.26 | 84.4 | 85.51 | 86.16 | 86.16 | 87.44 | 87.44 | 41.67 | 41.67 | 50 | 54.17 | 58.33 | 62.5 | 66.67 | 66.67 | 75 | 79.17 | 79.17 | 87.5 | 87.5 | 87.5 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | خدمات استشارية | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 20.83 | 29.660000000000004 | -8.8300000000000054 | Good Progress | 3.0900000000000034 | 2.3799999999999955 | 1.8299999999999983 | 2.2099999999999937 | 1.9400000000000119 | 1.6499999999999915 | 1.1000000000000085 | 1.1400000000000006 | 1.1099999999999994 | 0.64999999999999147 | 0 | 1.2800000000000011 | 1.5316666666666663 | 0.15959966666666664 | 1218 | 0.9170771756978654 | 100.99999999999994 | 3.3666666666666649 | 8.2922824302134601E-2 | 0.13840000000000002 | 1442128.0000000002 | 428354.85148514883 | 1658447.2000000002 | 492608.07920792111 | 1.3702970297029713E-3 | 4.1108910891089145E-2 | 16420.269306930706 | 1.9509719806763289E-3 | -5.5477175697865422E-2 | المشاريع الاستراتيجية | نعم | 10.477935199999999 | 11.982999999999999 | 1.5050647999999995 | 0.87440000000000007 | No | 45019 | within time | 44978 | within time | 6 | 47 | Within Time | 1.4848499999999996 | 8.4724660000000007 | 0 | 0 | 0 | 9.9573160000000005 | 7.1962970000000004 | 0.69062351247600773 | 0.84986939788714699 | -8.2922824302134601E-2 | 88.995000000000005 | 11.004999999999995 | R | 12.56 | Delayed | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 90 | P1437 | 04/23/2/01/0027/1 | تنفيذ شبكات مياه ببعض مراكز وقرى منطقة القصيم (مرحلة ثانية) | الشمالي | منطقة القصيم | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45470 | 46613 | 0.5879265091863517 | 38181252 | 38.181252000000001 | 43908439.799999997 | 43.908439799999996 | 0 | 43.908439799999996 | لا | تحت التنفيذ | منتظم | شركة الفلاح للمقاولات المحدودة | شركة عبدالله عبدالرحمن السعيد للاستشارات الهندسية شركة مهنية شخص واحد | جاري | 46999 | 0 | 45991 | 0.51006124234470696 | 0.53455818022747159 | 0.56167979002624668 | 0.5879265091863517 | 0.6150481189851269 | 0.6412948381452318 | 0.66841644794400701 | 0.6955380577427821 | 0.72178477690288712 | 0.74890638670166232 | 0.77515310586176733 | 0.80227471566054243 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2.14 | 2.14 | 4.8 | 6.47 | 8.1 | 13.44 | 13.44 | 15.75 | 24.42 | 27.24 | 31.3 | 34.159999999999997 | 38 | 41.6 | 41.6 | 44.34 | 44.34 | 0 | 0 | 0 | 0 | 0.08 | 0.84 | 1.9 | 6.15 | 15.69 | 21.02 | 25.37 | 31.51 | 38.28 | 43.55 | 51.35 | 19.940000000000001 | 25.37 | 32 | 38.799999999999997 | 46.99 | 55.92 | 55.92 | 46.11 | 46.11 | 0 | 0 | 0 | 0 | 0 | 0 | 117800 | 0 | 0 | 0 | No | 30.1 | 31.3 | -1.1999999999999993 | Good Progress | 1.63 | 5.34 | 0 | 2.3100000000000005 | 8.6700000000000017 | 2.8199999999999967 | 4.0600000000000023 | 2.8599999999999959 | 3.8400000000000034 | 3.6000000000000014 | 0 | 2.740000000000002 | 3.1558333333333337 | 1.2049366777000001 | 1143 | 0.5879265091863517 | 471 | 15.7 | 0.4120734908136483 | 0.58399999999999996 | 22297851.167999998 | 1420245.2973248407 | 25642528.843199998 | 1633282.0919235668 | 1.2399150743099786E-3 | 3.7197452229299363E-2 | 54442.736397452216 | 1.4914461538461538E-2 | -0.17192650918635166 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 310 | نعم | نعم | 19.469002207319999 | 20.246181591779997 | 0.77717938445999835 | 0.98230000000000006 | No | 45454 | Out | 45419 | within time | 16 | 51 | Within Time | 11.177561523000001 | 28.464473276999996 | 0 | 0 | 0 | 39.642034799999998 | 4655172.7875959994 | 9.3896470000000001 | 0.24592297287684542 | 0.34244214390066369 | 0.19992650918635174 | 43.627499999999998 | 3.3625000000000043 | R | 1.77 | Regular | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 91 | A11 | 04/23/2/02/0035/1 | مشروع إنشاء شبكات صرف صحي بأحياء محافظات منطقة القصيم (مرحلة ثانية) | الشمالي | منطقة القصيم | مشاريع الحزمة الأولى | صرف | خطوط وشبكات | 45533 | 46569 | 0.58783783783783783 | 72009569.629999995 | 72.009569630000001 | 82811005.069999993 | 82.811005069999993 | 0 | 82.811005069999993 | لا | تحت التنفيذ | متقدم | شركة الفهد للتجارة والصناعة والمقاولات | شركة عبدالله عبدالرحمن السعيد للاستشارات الهندسية شركة مهنية شخص واحد | جاري | 46999 | ضعف السيولة | 0.50193050193050193 | 0.52895752895752901 | 0.55888030888030893 | 0.58783783783783783 | 0.61776061776061775 | 0.64671814671814676 | 0.67664092664092668 | 0.70656370656370659 | 0.73552123552123549 | 0.76544401544401541 | 0.79440154440154442 | 0.82432432432432434 | Null | 0 | 0 | 0 | 0 | 1.03 | 3.28 | 4.51 | 6.5 | 11.3 | 15.5 | 22.44 | 26.65 | 33.9 | 40.99 | 46 | 50.5 | 55.09 | 61 | 62.5 | 62.5 | 68.5 | 68.5 | 0 | 0 | 0 | 0.11 | 2.5299999999999998 | 6.42 | 11.09 | 13.83 | 17.7 | 21.62 | 25.9 | 33.67 | 40.86 | 48.72 | 55.16 | 61.67 | 69.900000000000006 | 76.06 | 76.06 | 65.650000000000006 | 65.650000000000006 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 67789 | 0 | 0 | No | 55.05 | 49.47 | 5.5799999999999983 | Good Progress | 4.1999999999999993 | 6.9400000000000013 | 4.2099999999999973 | 7.25 | 7.0900000000000034 | 5.009999999999998 | 4.5 | 4.5900000000000034 | 5.9099999999999966 | 1.5 | 0 | 6 | 4.7666666666666666 | 3.4324561523633332 | 1036 | 0.58783783783783783 | 427 | 14.233333333333333 | 0.41216216216216217 | 0.375 | 27003588.611249998 | 1897207.630766979 | 31054126.901249994 | 2181788.7752634659 | 8.7822014051522248E-4 | 2.6346604215456676E-2 | 72726.292508782193 | 3.7162162162162171E-2 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 176 | نعم | نعم | 56.725538472949992 | 54.365424828454998 | -2.3601136444949944 | 1.0285 | No | 45496 | Out | 45475 | within time | 37 | 58 | Within Time | 30.724083042133334 | 42.554405027866657 | 0 | 0 | 0 | 73.278488069999995 | 4985222.5052139983 | 31.777652 | 0.44129762423633578 | 0.55334188459060296 | -2.8862162162162197E-2 | 69.39 | 0.51000000000000512 | R | -2.85 | Regular | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 92 | P1300-1 | 10/23/2/04/0004/1 | تطوير وتوسعة محطة معالجة الصرف الصحي بمدينة عرعر | الشمالي | منطقة الحدود الشمالية | مشاريع الحزمة الأولى | صرف | محطات معالجة صرف صحي | 45519 | 46183 | 0.93825301204819278 | 296618293 | 296.61829299999999 | 341111036.94999999 | 341.11103694999997 | 0 | 341.11103694999997 | نعم | 46234 | نعم | متوقع تعثره (مدة منقضية) | تحت التنفيذ | متأخر | شركة الأعمال المدنية المحدودة | شركة عبدالله عبدالرحمن السعيد للاستشارات الهندسية شركة مهنية شخص واحد | جاري | 46999 | 0 | 0.80421686746987953 | 0.84638554216867468 | 0.89307228915662651 | 0.93825301204819278 | 0.98493975903614461 | 1.0301204819277108 | 1.0768072289156627 | 1.1234939759036144 | 1.1686746987951808 | 1.2153614457831325 | 1.2605421686746987 | 1.3072289156626506 | Null | متوقع تعثره (مدة منقضية) | 0 | 0 | 0 | 0.18 | 1.81 | 2.56 | 3.7 | 6.78 | 10.16 | 16.989999999999998 | 20 | 24.9 | 28.14 | 33.18 | 36.01 | 39.31 | 43.26 | 46.13 | 50 | 54.27 | 54.27 | 60.28 | 60.28 | 0 | 0 | 7.0000000000000007E-2 | 2.48 | 5.38 | 8 | 11.25 | 14.4 | 16.98 | 21.72 | 26.64 | 30.64 | 38.01 | 45.18 | 39.270000000000003 | 45.18 | 50.92 | 49.6 | 56.27 | 56.27 | 82.35 | 82.35 | 40000 | 0 | 72000 | 0 | 0 | 0 | 0 | 0 | محطة معالجة | No | توسعة | 39.799999999999997 | 40.699999999999996 | -0.89999999999999858 | Good Progress | 3.0100000000000016 | 4.8999999999999986 | 3.240000000000002 | 5.0399999999999991 | 2.8299999999999983 | 3.3000000000000043 | 3.9499999999999957 | 2.8700000000000045 | 3.8699999999999974 | 4.2700000000000031 | 0 | 6.009999999999998 | 3.6075000000000004 | 10.700504919975002 | 664 | 0.93825301204819278 | 40.999999999999993 | 1.3666666666666665 | 6.174698795180722E-2 | 0.45729999999999998 | 135643545.38889998 | 99251374.674804881 | 155990077.19723499 | 114139080.87602562 | 1.1153658536585367E-2 | 0.334609756097561 | 3804636.0292008538 | 1.183841797752809E-2 | -0.39555301204819276 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | 205.62173307345998 | 280.90493892832495 | 75.283205854864974 | 0.7793000000000001 | No | 45496 | Out | 45474 | within time | 23 | 45 | Within Time | 92.14941635866667 | 224.51289859133328 | 0 | 0 | 0 | 316.66231494999994 | 137808858.9278 | 93.891017000000005 | 0.31653818802065592 | 0.46276482739944719 | 0.42905301204819279 | 56.952500000000001 | -7.3524999999999991 | R | 22.07 | Delayed | SV | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 93 | P351-1 | 05/23/2/02/0027/1 | مشروع شبكات الصرف الصحي لمخطط جنوب منسوبي التعليم ومخطط الرابية بمحافظة الأحساء-الجزء الأول | الشرقي | المنطقة الشرقية | مشاريع الحزمة الأولى | صرف | خطوط وشبكات | 45434 | 46580 | 0.61780104712041883 | 78391292 | 78.391292000000007 | 90149985.799999997 | 90.149985799999996 | 0 | 90.149985799999996 | لا | إيقاف جزئي | متقدم | شركة عبدالله محمد سليمان الصيخان وأولاده للتجارة والمقاولات | شركة الخدمات الهندسية والفنية للإستشارات المهنية | جاري | 46996 | 0 | 45930 | 0.54013961605584637 | 0.56457242582897038 | 0.59162303664921467 | 0.61780104712041883 | 0.64485165794066313 | 0.6710296684118674 | 0.69808027923211169 | 0.72513089005235598 | 0.75130890052356025 | 0.77835951134380454 | 0.8045375218150087 | 0.83158813263525311 | Null | اسباب داخلية | أوامر تغيير | معالجة وضع أوامر التغيير | أوامر مغايرة | إجراءات داخلية | 45879 | V.Order | 0 | 0 | 0 | 0 | 0.77 | 3.07 | 5.5 | 10.1 | 14.8 | 18.2 | 22 | 26.5 | 33.380000000000003 | 36.5 | 43.24 | 44.35 | 44.9 | 46 | 48.6 | 50.24 | 52.77 | 52.77 | 55.22 | 55.22 | 0 | 0 | 0 | 0.22 | 0.22 | 4.4400000000000004 | 8.3000000000000007 | 11.65 | 17.91 | 23.7 | 30.8 | 35.86 | 39.35 | 43.36 | 48.04 | 52.86 | 56.56 | 62.19 | 68.13 | 46.51 | 47.36 | 48.76 | 48.76 | 53.63 | 53.63 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 69100 | 0 | 0 | No | 56.48 | 40.5 | 15.979999999999997 | Low Progress | 4.5 | 6.8800000000000026 | 3.1199999999999974 | 6.740000000000002 | 1.1099999999999994 | 0.54999999999999716 | 1.1000000000000014 | 2.6000000000000014 | 1.6400000000000006 | 2.5300000000000011 | 0 | 2.4499999999999957 | 2.7683333333333331 | 2.1701322668666667 | 1146 | 0.61780104712041883 | 438 | 14.6 | 0.38219895287958117 | 0.47229999999999994 | 37024207.211599998 | 2535904.6035342463 | 42577838.293339998 | 2916290.2940643835 | 1.0783105022831049E-3 | 3.2349315068493145E-2 | 97209.676468812773 | 1.8037361904761903E-2 | -9.0101047120418776E-2 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 307 | نعم | نعم | 49.780822158759996 | 48.347437384540001 | -1.433384774219995 | 1.0159 | No | 45420 | within time | 45388 | within time | 14 | 46 | Within Time | 20.10083379033334 | 63.243372009666658 | 0 | 0 | 0 | 83.344205799999997 | 9490990.5050239991 | 29.926993 | 0.38176425259070862 | 0.48786248456788106 | 0.15270104712041888 | 56.905000000000001 | -9.5450000000000017 | R | -1.59 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||
| 94 | 10168 | 28/23/1/14/0001/1 | عقد إستشاري إدارة المشاريع PMO | المركز الرئيسي | المركز الرئيسي | مشاريع الحزمة الأولى | استشاري | إدارة المشاريع (PMO) | 45300 | 47127 | 0.46086480569239191 | 1499790000 | 1499.79 | 1724758500.01 | 1724.75850001 | 0 | 1724.75850001 | لا | تحت التنفيذ | استشاري | فرع شركة هيل انترناشيونال ميدل ايست ليمتد | 0 | 0.41215106732348111 | 0.42747673782156542 | 0.44444444444444442 | 0.46086480569239191 | 0.47783251231527096 | 0.4942528735632184 | 0.5112205801860974 | 0.52818828680897645 | 0.54460864805692388 | 0.56157635467980294 | 0.57799671592775037 | 0.59496442255062942 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 9.76 | 9.76 | 14.97 | 14.97 | 22.53 | 22.53 | 42.1 | 42.1 | 42.1 | 42.1 | 42.1 | 0 | 0 | 0 | 0 | 0 | 0 | 11.171960569550931 | 11.9934282584885 | 14.512595837897043 | 16.210295728368017 | 17.907995618838992 | 19.605695509309967 | 0 | 0 | 0 | 0 | 0 | 22.48 | 24.05 | 29.48 | 31.23 | 32.979999999999997 | 34.729999999999997 | 36.479999999999997 | 38.229999999999997 | 38.229999999999997 | 41.73 | 41.73 | خدمات استشارية | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 15.072004381161005 | 22.53 | -7.4579956188389964 | Good Progress | 0 | 0 | 9.76 | 0 | 5.2100000000000009 | 0 | 7.5600000000000005 | 0 | 19.57 | 0 | 0 | 0 | 3.5083333333333333 | 52.617632499999999 | 1827 | 0.46086480569239191 | 985.00000000000011 | 32.833333333333336 | 0.53913519430760815 | 0.57899999999999996 | 868378410 | 26448073.401015226 | 998635171.50579 | 30415284.411343854 | 5.8781725888324863E-4 | 1.7634517766497458E-2 | 1013842.8137114617 | -7.8058900523560191E-3 | -3.9864805692391814E-2 | المشاريع الاستراتيجية | نعم | 726.12332850421012 | 719.74172205417301 | -6.3816064500371112 | 1.0037 | No | 45295 | within time | 45253 | within time | 5 | 47 | Within Time | 325 | 450 | 525 | 389.18710399999986 | 0 | 1689.1871039999999 | 30.688628999999999 | 2.0461950673094233E-2 | 0.22534611020991491 | 0.11356480569239197 | 33.055 | 3.4249999999999972 | R | -0.37 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 95 | P140 | 06/23/2/01/0016/1 | مشروع تنفيذ شبكات مياه الشرب لمنطقة النماص - عقد رقم (1) بمحافظة النماص | الجنوبي | منطقة عسير | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45362 | 46882 | 0.51315789473684215 | 42749035.75 | 42.749035749999997 | 49161391.109999999 | 49.161391109999997 | 0 | 49.161391109999997 | لا | تحت التنفيذ | متأخر | شركة الأسس الحديثة للمقاولات | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | 0 | 0.45460526315789473 | 0.47302631578947368 | 0.49342105263157893 | 0.51315789473684215 | 0.53355263157894739 | 0.55328947368421055 | 0.5736842105263158 | 0.59407894736842104 | 0.6138157894736842 | 0.63421052631578945 | 0.65394736842105261 | 0.67434210526315785 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2.37 | 2.37 | 4.5 | 6.65 | 11.05 | 14.39 | 17 | 17.03 | 18.34 | 19.760000000000002 | 21.06 | 25.48 | 30.66 | 32.270000000000003 | 32.28 | 32.29 | 33.15 | 33.15 | 33.369999999999997 | 33.369999999999997 | 0 | 0 | 0 | 0 | 0.44 | 0.44 | 3.59 | 3.59 | 9.11 | 12.76 | 20.99 | 24.38 | 26.9 | 29.68 | 34.76 | 37.58 | 40.840000000000003 | 45.45 | 50.61 | 52.25 | 33.01 | 35.54 | 38.08 | 38.08 | 44.1 | 44.1 | 0 | 0 | 0 | 0 | 0 | 0 | 37100 | 0 | 0 | 0 | No | 43.14 | 27.770000000000003 | 15.369999999999997 | Low Progress | 3.0000000000001137E-2 | 1.3099999999999987 | 1.4200000000000017 | 1.2999999999999972 | 4.4200000000000017 | 5.18 | 1.610000000000003 | 9.9999999999980105E-3 | 9.9999999999980105E-3 | 0.85999999999999943 | 0 | 0.21999999999999886 | 1.3641666666666665 | 0.58316809602291653 | 1520 | 0.51315789473684215 | 739.99999999999989 | 24.666666666666664 | 0.48684210526315785 | 0.66849999999999998 | 28577730.398874998 | 1158556.6377922297 | 32864389.957034998 | 1332340.1333933109 | 9.0337837837837847E-4 | 2.7101351351351353E-2 | 44411.33777977703 | 1.1510734375E-2 | -0.18165789473684213 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 365 | نعم | نعم | 16.405156213406997 | 21.68017347951 | 5.2750172661030028 | 0.89269999999999994 | No | 45316 | Out | 45266 | Out | 46 | 96 | No | 5.7533077280208325 | 40.173116381979163 | 0 | 0 | 0 | 45.926424109999999 | 5423470.024685666 | 9.606147 | 0.22471026144724213 | 0.32352699836387588 | 0.18305789473684214 | 36.372500000000002 | -0.83250000000000313 | R | 10.73 | Delayed | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||
| 96 | P1498 | 08/23/2/01/0010/1 | شبكات المياه باحياء النظيم وجنوب تبوك | الشمالي الغربي | منطقة تبوك | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45529 | 46290 | 0.80551905387647826 | 4976870 | 4.9768699999999999 | 5723400.5 | 5.7234005000000003 | 0 | 5.7234005000000003 | نعم | 46234 | نعم | متوقع تعثره (مدة منقضية) | تحت التنفيذ | منتظم | شركة بصمة التشييد للمقاولات | شركة فيوتشر كونسلت للاستشارات الهندسية | جاري | 46985 | 0 | 0.68856767411300923 | 0.72536136662286466 | 0.76609724047306171 | 0.80551905387647826 | 0.84625492772667543 | 0.88567674113009198 | 0.92641261498028904 | 0.96714848883048621 | 1.0065703022339028 | 1.0473061760840998 | 1.0867279894875164 | 1.1274638633377136 | Null | متوقع تعثره (مدة منقضية) | 45966 | V.Order | 0 | 0 | 2.19 | 4 | 9.85 | 15.88 | 21.1 | 24.4 | 32.15 | 40.229999999999997 | 51.24 | 55.5 | 60.07 | 70.5 | 72 | 72.37 | 75.02 | 75.02 | 83.11 | 83.11 | 0 | 0 | 0.85 | 2.15 | 4.7300000000000004 | 8.2200000000000006 | 13.72 | 19.82 | 26.88 | 38.93 | 47.19 | 59.24 | 67.45 | 74.56 | 83.12 | 71.28 | 72.760000000000005 | 75.39 | 75.39 | 85.33 | 83.11 | 0 | 0 | 0 | 0 | 0 | 0 | 15100 | 0 | 0 | No | 80.97 | 68.31 | 12.659999999999997 | Low Progress | 3.2999999999999972 | 7.75 | 8.0799999999999983 | 11.010000000000005 | 4.259999999999998 | 4.57 | 10.43 | 1.5 | 0.37000000000000455 | 2.6499999999999915 | 0 | 8.0900000000000034 | 5.1674999999999995 | 0.25717975724999997 | 761 | 0.80551905387647826 | 148.00000000000003 | 4.9333333333333345 | 0.19448094612352174 | 0.24980000000000005 | 1243222.1260000002 | 252004.48499999999 | 1429705.4449 | 289805.15774999995 | 1.6878378378378379E-3 | 5.0635135135135137E-2 | 9660.1719250000006 | -5.5319053876478314E-2 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 120 | نعم | نعم | 4.7567181555500007 | 4.7567181555500007 | 0 | 1 | No | 45501 | Out | 45501 | within time | 28 | 28 | Within Time | 2.2362735866666665 | 2.7652749133333336 | 0 | 0 | 0 | 5.0015485000000002 | 411350.53769999999 | 2.8493499999999998 | 0.57251847044427517 | 0.72414586885213772 | 9.2719053876478275E-2 | 87.502499999999998 | -14.742499999999993 | R | 0 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 97 | NA-00028 | 01/23/2/13/0042/1 | عقد ترحيل خط المياه المعترض تنفيذ المرحلة الثالثة من استكمال ازدواج طريق الدوادمي - عرجاء - نفي - الرس (المجموعة الحادية عشر) | الأوسط | منطقة الرياض | على حساب جهات أخرى ( حكومية / خاصة) | مياه | خطوط وشبكات | 45554 | 46041 | 1.2073921971252566 | 9519649.5199999996 | 9.5196495199999998 | 10947596.949999999 | 10.947596949999999 | 0 | 10.947596949999999 | نعم | 46112 | نعم | متوقع تعثره (مدة منقضية) | جاري الإستلام الإبتدائي | متأخر | شركة الفلاح للمقاولات المحدودة | مكتب الياردة للاستشارات الهندسية | جاري | 46984 | 0 | 1.0246406570841888 | 1.0821355236139631 | 1.1457905544147844 | 1.2073921971252566 | 1.271047227926078 | 1.3326488706365502 | 1.3963039014373717 | 1.459958932238193 | 1.5215605749486654 | 1.5852156057494866 | 1.646817248459959 | 1.7104722792607803 | Null | متوقع تعثره (مدة منقضية) | 0 | 0 | 0 | 0 | 0 | 3.02 | 8.6999999999999993 | 11.17 | 17.64 | 24.22 | 33.450000000000003 | 42.55 | 52.78 | 56.01 | 61.6 | 69.400000000000006 | 76.209999999999994 | 80.22 | 84.78 | 84.78 | 88.83 | 88.83 | 0 | 0 | 0 | 0.44 | 3.88 | 14.02 | 25.58 | 37.26 | 49.18 | 62.45 | 76.430000000000007 | 53.94 | 71.23 | 86.56 | 72.14 | 86.07 | 100 | 100 | 100 | 100 | 100 | 0 | 0 | 0 | 0 | 0 | 0 | 20500 | 0 | 0 | No | 71.7 | 69.400000000000006 | 2.2999999999999972 | Good Progress | 6.5799999999999983 | 9.230000000000004 | 9.0999999999999943 | 10.230000000000004 | 3.2299999999999969 | 5.5900000000000034 | 7.8000000000000043 | 6.8099999999999881 | 4.0100000000000051 | 4.5600000000000023 | 0 | 4.0499999999999972 | 5.9325000000000001 | 0.56475320777399995 | 487 | 1.2073921971252566 | -100.99999999999996 | -3.3666666666666654 | -0.20739219712525658 | 0.1522 | 1448890.6569439999 | -430363.56146851502 | 1666224.2557899996 | -494918.095779208 | -1.5069306930693075E-3 | -4.5207920792079227E-2 | -16497.269859306936 | -0.35959219712525659 | أخرى | 9.7247503706849994 | 10.947596949999999 | 1.2228465793150001 | 0.88829999999999998 | No | 45544 | within time | 45439 | Out | 10 | 115 | Within Time | 5.3262439064400002 | 5.1030880435599997 | 0 | 0 | 0 | 10.42933195 | 6.8867510000000003 | 0.72342484726265432 | 0.7676533954032021 | 0.34669219712525667 | 94.007499999999993 | 5.9925000000000068 | R | 11.17 | Delayed | EL | أخرى | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 98 | O988 | 07/23/2/08/0014/1 | انشاء خزانات محافظات وقرى منطقة حائل ( عقد 3) | الشمالي | منطقة حائل | عامة | مياه | خزانات | 45396 | 46249 | 0.87456037514654161 | 45212005.359999999 | 45.212005359999999 | 51993806.159999996 | 51.993806159999998 | 0 | 51.993806159999998 | لا | تحت التنفيذ | منتظم | شركة ركائز الإنشاءات للمقاولات | شركة عبدالله عبدالرحمن السعيد للاستشارات الهندسية شركة مهنية شخص واحد | جاري | 46999 | 0 | 0.77022274325908557 | 0.80304806565064479 | 0.839390386869871 | 0.87456037514654161 | 0.91090269636576793 | 0.94607268464243843 | 0.98241500586166475 | 1.018757327080891 | 1.0539273153575615 | 1.0902696365767879 | 1.1254396248534584 | 1.1617819460726846 | Null | اسباب خاصة بالمقاول | ضعف كفاءة المقاول الفنية والمالية لانجاز الأعمال وفق البرنامج الزمني المعتمد | ضعف اّداء المقاول فني وإداري | 0 | 0 | 0 | 0 | 0.03 | 0.03 | 0.03 | 0.38 | 1.05 | 1.1100000000000001 | 2.1 | 2.98 | 8.52 | 8.52 | 8.52 | 10.27 | 12.72 | 17.670000000000002 | 22.21 | 25.41 | 29.79 | 32.69 | 37.18 | 40.35 | 40.35 | 44.16 | 44.16 | 0 | 0 | 0 | 0 | 0.22 | 0.22 | 4.18 | 7.78 | 11.92 | 16.53 | 28.61 | 35.020000000000003 | 41.49 | 47.96 | 53.03 | 59.49 | 67.41 | 23.53 | 29.92 | 36.25 | 36.01 | 42.15 | 48.95 | 48.95 | 62.51 | 44.16 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 24.33 | 28.68 | -4.3500000000000014 | Good Progress | 0 | 1.75 | 2.4500000000000011 | 4.9500000000000011 | 4.5399999999999991 | 3.1999999999999993 | 4.379999999999999 | 2.8999999999999986 | 4.490000000000002 | 3.1700000000000017 | 0 | 3.8099999999999952 | 2.97 | 1.3427965591919999 | 853 | 0.87456037514654161 | 107 | 3.5666666666666669 | 0.12543962485345839 | 0.59650000000000003 | 26968961.197239999 | 7561390.9898803728 | 31014305.374439999 | 8695599.6376934573 | 5.5747663551401873E-3 | 0.16724299065420561 | 289853.32125644857 | 1.1064015228426396E-2 | -0.47106037514654164 | ميزانية عامة | 22.960464800255995 | 22.960464800255995 | 0 | 1 | No | 45370 | Out | 45337 | within time | 26 | 59 | Within Time | 11.992484421740002 | 36.022439738259997 | 0 | 0 | 0 | 48.01492416 | 18.722297000000001 | 0.4141001234279249 | 0.32825932225863669 | 0.51446037514654164 | 41.599999999999994 | 0.55000000000000426 | R | 0 | Regular | R | ميزانية عامة | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 99 | P1743 | 01/23/2/02/0013/1 | عقد تنفيذ شبكات الصرف الصحي بمحافظة المجمعة ( المرحلة التاسعة ) | الأوسط | منطقة الرياض | مشاريع الحزمة الأولى | صرف | خطوط وشبكات | 45257 | 46060 | 1.1021170610211706 | 38879410.5 | 38.879410499999999 | 44711322.060000002 | 44.711322060000001 | 0 | 44.711322060000001 | نعم | منجز في تاريخه | 46053 | 46053 | لا | استلام ابتدائي | استلام ابتدائي | شركة العامريه المتحده للمقاولات | مكتب الياردة للاستشارات الهندسية | جاري | 46984 | 0 | 0.99128268991282686 | 1.0261519302615194 | 1.0647571606475716 | 1.1021170610211706 | 1.1407222914072228 | 1.178082191780822 | 1.2166874221668742 | 1.2552926525529264 | 1.2926525529265256 | 1.3312577833125778 | 1.3686176836861768 | 1.4072229140722292 | Null | 0 | 0 | 0 | 0.5 | 1.52 | 3.06 | 5.34 | 8 | 11.5 | 11.5 | 21.74 | 26.18 | 31.59 | 38.51 | 44.77 | 49.29 | 53.21 | 59.11 | 63.44 | 67.08 | 70.959999999999994 | 74.150000000000006 | 76.61 | 79 | 82.27 | 82.42 | 82.42 | 82.42 | 82.42 | 82.42 | 0 | 0.01 | 1.02 | 2.02 | 7.8 | 11.17 | 14.74 | 14.74 | 24.83 | 30.28 | 35.6 | 42.03 | 48.41 | 49.58 | 54.66 | 59.72 | 66.11 | 71.92 | 78.040000000000006 | 84.13 | 88.02 | 81.790000000000006 | 86.3 | 91.89 | 91.89 | 100 | 91.89 | 91.89 | دراسة وتصميم وتنفيذ مشاريع الصرف الصحي بمحافظات منطقة الرياض مع الإشراف | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 50049.520000000004 | 0 | 0 | منجز حسب الخطة | ضمن الخطة الأساسية | No | 46.190000000000005 | 47.41 | -1.2199999999999918 | Good Progress | 5.8999999999999986 | 4.3299999999999983 | 3.6400000000000006 | 3.8799999999999955 | 3.1900000000000119 | 2.4599999999999937 | 2.3900000000000006 | 3.269999999999996 | 0.15000000000000568 | 0 | 0 | 0 | 2.4341666666666666 | 0.94638965058749991 | 803 | 1.1021170610211706 | -81.999999999999972 | -2.7333333333333325 | -0.10211706102117057 | 0.17579999999999998 | 6835000.3658999987 | -2500609.889963415 | 7860250.4181479998 | -2875701.3724931716 | -2.1439024390243907E-3 | -6.4317073170731723E-2 | -95856.712416439055 | -4.1132692307692302E-3 | -0.27791706102117053 | المشاريع الاستراتيجية | نعم | 36.851071641852002 | 41.085233840933995 | 4.2341621990819931 | 0.90530000000000022 | No | 45241 | Out | 45204 | within time | 16 | 53 | Within Time | 47.398974880000011 | 0 | 0 | 0 | 0 | 47.398974880000011 | 29.436245 | 0.75711654630154435 | 0.82897631685986717 | 0.23911706102117058 | 89.572499999999991 | 2.3175000000000097 | R | 9.4700000000000006 | Delayed | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||
| 100 | 10284 | 04/23/2/02/0031/1 | تنفيذ شبكات الصرف الصحي ببعض أحياء محافظة عنيزة – مرحلة ثانية | الشمالي | منطقة القصيم | مشاريع الحزمة الأولى | صرف | خطوط وشبكات | 45526 | 46436 | 0.67692307692307696 | 67438223.5 | 67.438223500000007 | 77553957.019999996 | 77.553957019999999 | 0 | 77.553957019999999 | نعم | 46265 | نعم | تحت التنفيذ | متقدم | شركة الفهد للتجارة والصناعة والمقاولات | شركة عبدالله عبدالرحمن السعيد للاستشارات الهندسية شركة مهنية شخص واحد | جاري | 46999 | 0 | 0.57912087912087917 | 0.60989010989010994 | 0.643956043956044 | 0.67692307692307696 | 0.71098901098901102 | 0.74395604395604398 | 0.77802197802197803 | 0.81208791208791209 | 0.84505494505494505 | 0.87912087912087911 | 0.91208791208791207 | 0.94615384615384612 | Null | 0 | 0 | 0 | 2.8 | 8.35 | 13.32 | 22.37 | 29 | 40 | 43.74 | 50.24 | 56 | 63.5 | 67.400000000000006 | 70 | 72 | 74.7 | 76.180000000000007 | 77.5 | 77.5 | 89 | 89 | 0 | 0 | 0 | 0.67 | 3.39 | 10.34 | 13.15 | 16.82 | 22.4 | 25.95 | 30.9 | 38.85 | 44.8 | 51.89 | 56.19 | 62.98 | 69.12 | 75.790000000000006 | 75.790000000000006 | 84.06 | 84.06 | 0 | 0 | 0 | 0 | 0 | 0 | 80842.789999999994 | 0 | 0 | No | 55.519999999999996 | 63.65 | -8.1300000000000026 | Good Progress | 3.740000000000002 | 6.5 | 5.759999999999998 | 7.5 | 3.9000000000000057 | 2.5999999999999943 | 2 | 2.7000000000000028 | 1.480000000000004 | 1.3199999999999932 | 0 | 11.5 | 4.083333333333333 | 2.7537274595833332 | 910 | 0.67692307692307696 | 293.99999999999994 | 9.7999999999999989 | 0.32307692307692304 | 0.22500000000000001 | 15173600.2875 | 1548326.5599489796 | 17449640.329499997 | 1780575.5438265305 | 7.6530612244897977E-4 | 2.2959183673469392E-2 | 59352.518127551033 | 9.8076923076923034E-2 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 180 | نعم | نعم | 69.023021747800001 | 65.191856271012 | -3.8311654767880015 | 1.0494000000000001 | No | 45496 | Out | 45469 | within time | 30 | 57 | Within Time | 21.074444843750001 | 51.520109186250004 | 0 | 0 | 0 | 72.594554030000012 | 4789732.3861728003 | 42.920788000000002 | 0.63644600602505486 | 0.75178470372073791 | 4.7123076923077045E-2 | 86.95 | -17.829999999999998 | R | -4.9400000000000004 | Regular | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 101 | 10285 | 05/23/2/02/0032/1 | مشروع إستكمال مرافق الصرف الصحي بالنعيرية - المرحلة الثانية (الجزء الأول) | الشرقي | المنطقة الشرقية | مشاريع الحزمة الأولى | صرف | خطوط وشبكات | 45501 | 46233 | 0.87568306010928965 | 60570153 | 60.570152999999998 | 69655675.950000003 | 69.655675950000003 | 0 | 69.655675950000003 | نعم | 46387 | نعم | ضمن المتعثر خلال العام 2026 | تحت التنفيذ | متعثر | شركة ماكسون للمقاولات | شركة الخدمات الهندسية والفنية للإستشارات المهنية | جاري | 46996 | 0 | 0.75409836065573765 | 0.79234972677595628 | 0.83469945355191255 | 0.87568306010928965 | 0.91803278688524592 | 0.95901639344262291 | 1.0013661202185793 | 1.0437158469945356 | 1.0846994535519126 | 1.1270491803278688 | 1.1680327868852458 | 1.2103825136612021 | Null | متوقع تعثره (مدة منقضية) | 0 | 0 | 0 | 0 | 0 | 0.1 | 0.4 | 3.29 | 6.43 | 13.41 | 17.690000000000001 | 21.98 | 25.8 | 28.87 | 31.76 | 36.619999999999997 | 40.24 | 44.03 | 47.2 | 53.45 | 55.7 | 55.7 | 58 | 58 | 0 | 0 | 0 | 0.22 | 2.31 | 6.36 | 11.4 | 15.66 | 23.29 | 32.49 | 41.89 | 55.52 | 67.75 | 33.909999999999997 | 42.96 | 53.76 | 67.58 | 52.16 | 63.43 | 73.959999999999994 | 73.959999999999994 | 95.96 | 95.96 | 0 | 0 | 0 | 0 | 0 | 0 | 27187 | 0 | 0 | No | 61.22 | 43.63 | 17.589999999999996 | Low Progress | 4.2899999999999991 | 3.8200000000000003 | 3.0700000000000003 | 2.8900000000000006 | 4.8599999999999959 | 3.6200000000000045 | 3.7899999999999991 | 3.1700000000000017 | 6.25 | 2.25 | 0 | 2.2999999999999972 | 3.3591666666666669 | 2.0346523895250002 | 732 | 0.87568306010928965 | 90.999999999999986 | 3.0333333333333328 | 0.12431693989071035 | 0.44299999999999995 | 26832577.778999995 | 8845904.7623076923 | 30857464.44585 | 10172790.476653848 | 4.868131868131868E-3 | 0.14604395604395606 | 339093.01588846155 | 6.4117294685990325E-3 | -0.3186830601092896 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | 40.400292051000001 | 66.841586641619998 | 26.441294590619997 | 0.62040000000000006 | No | 45490 | within time | 45449 | within time | 11 | 52 | Within Time | 19.185595962750003 | 39.484400987249998 | 0 | 0 | 0 | 58.669996949999998 | 27763940.840000033 | 18.377320999999998 | 0.30340555685900278 | 0.47343643244423084 | 0.35408306010928969 | 57.277500000000003 | 6.1524999999999963 | R | 37.96 | Troubled | Troubled | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 102 | P1707 | 01/23/2/02/0034/1 | عقد تنفيذ شبكات الصرف الصحي بمحافظة المزاحمية (المرحلة الثانية ) | الأوسط | منطقة الرياض | مشاريع الحزمة الأولى | صرف | خطوط وشبكات | 45536 | 46368 | 0.72836538461538458 | 88986777.579999998 | 88.986777579999995 | 102334794.22 | 102.33479421999999 | 0 | 102.33479421999999 | نعم | 46356 | نعم | تحت التنفيذ | متقدم | شركة السبق العربي للتجارة والمقاولات | مكتب الياردة للاستشارات الهندسية | جاري | 46984 | 0 | 0.62139423076923073 | 0.65504807692307687 | 0.69230769230769229 | 0.72836538461538458 | 0.765625 | 0.80168269230769229 | 0.83894230769230771 | 0.87620192307692313 | 0.91225961538461542 | 0.94951923076923073 | 0.98557692307692313 | 1.0228365384615385 | Null | 0 | 0 | 0 | 0.2 | 1.3 | 2.4700000000000002 | 3.69 | 6.14 | 6.14 | 7.01 | 9.36 | 10.36 | 15.6 | 20.190000000000001 | 26.58 | 30.63 | 35.93 | 40.869999999999997 | 44.02 | 44.02 | 48.79 | 48.79 | 0 | 0 | 0 | 1.48 | 4.42 | 8.48 | 13.91 | 19.02 | 23.59 | 28.12 | 33.1 | 38.74 | 44.99 | 51.46 | 30.61 | 35.46 | 41.18 | 47.74 | 47.74 | 48.75 | 48.75 | 0 | 0 | 0 | 20750 | 0 | 0 | 100525.42 | 0 | 0 | No | 29.13 | 29.33 | -0.19999999999999929 | Good Progress | 0.87000000000000011 | 2.3499999999999996 | 1 | 5.24 | 4.5900000000000016 | 6.389999999999997 | 4.0500000000000007 | 5.3000000000000007 | 4.9399999999999977 | 3.1500000000000057 | 0 | 4.769999999999996 | 3.5541666666666667 | 3.1627383864891665 | 832 | 0.72836538461538458 | 226.00000000000003 | 7.5333333333333341 | 0.27163461538461542 | 0.55979999999999996 | 49814798.089284003 | 6612583.8171615927 | 57287017.804355994 | 7604471.3899587598 | 2.4769911504424775E-3 | 7.4309734513274328E-2 | 253482.37966529198 | 1.3581461897356142E-2 | -0.28816538461538455 | المشاريع الاستراتيجية | المشاريع الحرجة | نعم | 49.929146099937995 | 49.888212182250001 | -4.0933917687993926E-2 | 1.0004 | No | 45525 | within time | 45456 | Out | 11 | 80 | Within Time | 28.090159456086671 | 52.06315076391332 | 0 | 0 | 0 | 80.153310219999995 | 67926077.769999996 | 12.496988999999999 | 0.14043647089889374 | 0.35980529786242521 | 0.37376538461538455 | 46.592500000000001 | -5.4125000000000014 | R | -0.04 | Regular | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 103 | P1752-1 | 01/23/2/02/0032/1 | عقد تنفيذ شبكات الصرف الصحي بمدينة الغاط (المرحلة الاولى) | الأوسط | منطقة الرياض | مشاريع الحزمة الأولى | صرف | خطوط وشبكات | 45519 | 46392 | 0.71363115693012602 | 18083570 | 18.083570000000002 | 20796105.5 | 20.796105499999999 | 0 | 20.796105499999999 | نعم | منجز في تاريخه | 46053 | 46053 | لا | استلام ابتدائي | استلام ابتدائي | شركة ماءك للمقاولات | مكتب الياردة للاستشارات الهندسية | جاري | 46984 | 0 | 0.61168384879725091 | 0.64375715922107679 | 0.67926689576174115 | 0.71363115693012602 | 0.74914089347079038 | 0.78350515463917525 | 0.81901489117983961 | 0.85452462772050397 | 0.88888888888888884 | 0.92439862542955331 | 0.95876288659793818 | 0.99427262313860254 | Null | 0 | 0 | 0 | 0.76 | 3.95 | 8.1 | 13.27 | 19.420000000000002 | 24.8 | 27.71 | 32.36 | 39.33 | 45.21 | 49.1 | 53.26 | 53.26 | 67.11 | 72.040000000000006 | 75.78 | 75.78 | 75.78 | 75.78 | 75.78 | 0 | 0 | 0 | 0.45200000000000001 | 2.2360000000000002 | 5.3230000000000004 | 9.32 | 13.73 | 18.02 | 21.93 | 28.13 | 34.19 | 39.46 | 47.34 | 47.34 | 59.32 | 68.540000000000006 | 70.510000000000005 | 70.510000000000005 | 70.510000000000005 | 70.510000000000005 | 70.510000000000005 | 0 | 0 | 0 | 0 | 0 | 0 | 25673.200000000001 | 0 | 0 | 0 | 0.34 | 0 | 44138 | منجز حسب الخطة | ضمن الخطة الأساسية | No | 57.084000000000003 | 59.01 | -1.9259999999999948 | Good Progress | 4.6499999999999986 | 6.9699999999999989 | 5.8800000000000026 | 3.8900000000000006 | 4.1599999999999966 | 0 | 13.850000000000001 | 4.9300000000000068 | 3.7399999999999949 | 0 | 0 | 0 | 4.0058333333333334 | 0.72439767491666673 | 873 | 0.71363115693012602 | 249.99999999999997 | 8.3333333333333321 | 0.28636884306987398 | 0.2422 | 4379840.6540000001 | 525580.87848000007 | 5036816.7521000002 | 604418.01025200007 | 9.6880000000000013E-4 | 2.9064000000000003E-2 | 20147.267008400002 | 0.12021927272727248 | 4.4168843069873981E-2 | المشاريع الاستراتيجية | نعم | 15.759288747899999 | 14.663333988050001 | -1.0959547598499988 | 1.0527 | No | 45510 | within time | 45451 | Out | 9 | 68 | Within Time | 20.647525999999999 | 0 | 0 | 0 | 0 | 20.647525999999999 | 12.017299 | 0.66454239953725946 | 0.72521939033846472 | 2.8231156930126011E-2 | 84.057500000000005 | -13.547499999999999 | R | -5.27 | Regular | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 104 | OA19 | 04/23/2/02/0016/1 | إنشاء شبكات صرف صحي شرق مدينة بريدة - عقد رقم_1 | الشمالي | منطقة القصيم | مشاريع الحزمة الأولى | صرف | خطوط وشبكات | 45386 | 45996 | 1.2393442622950819 | 12469755.619999999 | 12.469755619999999 | 14340218.960000001 | 14.340218960000001 | 0 | 14.340218960000001 | لا | ضمن خط الأساس - المتعثر بداية العام | تحت التنفيذ | متعثر | شركة بن دلامة للمقاولات | شركة عبدالله عبدالرحمن السعيد للاستشارات الهندسية شركة مهنية شخص واحد | جاري | 46999 | ضعف السيولة | 0 | 1.0934426229508196 | 1.139344262295082 | 1.1901639344262296 | 1.2393442622950819 | 1.2901639344262295 | 1.339344262295082 | 1.3901639344262295 | 1.4409836065573771 | 1.4901639344262294 | 1.540983606557377 | 1.5901639344262295 | 1.6409836065573771 | Null | ضمن خط الأساس - المتعثر بداية العام | اسباب خاصة بالمقاول | ضعف كفاءة المقاول الفنية والمالية لانجاز الأعمال وفق البرنامج الزمني المعتمد | ضعف اّداء المقاول فني وإداري | 0 | 0 | 0 | 0 | 0.28000000000000003 | 0.8 | 0.8 | 2.82 | 4.43 | 6.77 | 10.91 | 14 | 15 | 18 | 19.03 | 20.5 | 22.5 | 26.5 | 30.84 | 33.99 | 35.89 | 37.340000000000003 | 37.590000000000003 | 37.590000000000003 | 37.590000000000003 | 37.590000000000003 | 37.590000000000003 | 0 | 0 | 0 | 2.78 | 7.46 | 7.46 | 20.61 | 27.71 | 35.9 | 44.8 | 52.75 | 60.57 | 67.47 | 75.17 | 80.010000000000005 | 86.99 | 93.84 | 98.31 | 100 | 60.64 | 99.96 | 100 | 100 | 100 | 100 | 100 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 15984 | 0 | 0 | No | 24.740000000000002 | 29.12 | -4.379999999999999 | Good Progress | 1.0300000000000011 | 1.4699999999999989 | 2 | 4 | 4.34 | 3.1500000000000021 | 1.8999999999999986 | 1.4500000000000028 | 0.25 | 0 | 0 | 0 | 1.6325000000000003 | 0.20356876049650002 | 610 | 1.2393442622950819 | -145.99999999999994 | -4.8666666666666645 | -0.23934426229508188 | 0.62409999999999999 | 7782374.482441999 | -1599118.0443373977 | 8949730.6529360004 | -1838985.7506032886 | -4.2746575342465769E-3 | -0.1282397260273973 | -61299.525020109613 | 2.8098493273542594E-2 | -0.86344426229508187 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | 5.3904883070640004 | 14.340218960000001 | 8.949730652936001 | 0.37590000000000001 | No | 45356 | Out | 45330 | within time | 30 | 56 | Within Time | 2.0356876049650001 | 11.488181355035001 | 0 | 0 | 0 | 13.523868960000001 | 1078097.6614128002 | 3.870555 | 0.31039541735622245 | 0.37456262522382394 | 0.23974426229508194 | 42.237500000000004 | 57.762499999999996 | Troubled | 62.41 | Troubled | EL | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||
| 105 | 1041 | 27/21/2/01/0001/1 | مشروع شبكة المياه بأحياء سلطانة والمضباع عقد رقم 2 -ط ح بمدينة الطائف | الغربي | وحدة عمل الطائف | إيرادات الشركة | مياه | خطوط وشبكات | 44284 | 46081 | 1.0339454646633277 | 63798268.990000002 | 63.798268990000004 | 73368009.340000004 | 73.36800934 | 0 | 73.36800934 | نعم | 46203 | نعم | تحت التنفيذ | متأخر | شركة صرح التقنية للمقاولات | شركة بيت الخبرة للاستشارات الهندسية | جاري | 46985 | 0 | 0.98441847523650527 | 1 | 1.0172509738452977 | 1.0339454646633277 | 1.0511964385086254 | 1.0678909293266556 | 1.0851419031719534 | 1.1023928770172511 | 1.1190873678352811 | 1.1363383416805788 | 1.1530328324986088 | 1.1702838063439065 | Null | 45700 | Permissions | 55.96 | 57.35 | 57.95 | 59.3 | 59.66 | 61.03 | 63 | 63 | 67.25 | 75.150000000000006 | 76.099999999999994 | 69.05 | 69.430000000000007 | 69.8 | 70.09 | 70.23 | 70.31 | 70.37 | 71.92 | 74.02 | 75.38 | 76.5 | 77.55 | 77.7 | 78.239999999999995 | 78.239999999999995 | 80.23 | 80.23 | 93.73 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 70.88 | 74.790000000000006 | 77.95 | 82.09 | 85.35 | 88.98 | 91.62 | 95.73 | 98.13 | 100 | 100 | 100 | 84.19 | 95 | 95 | 100 | 100 | يهدف المشروع الى تغطية الحوجة المتزايدة للإمداد بالمياه وخدمة كل من حي المضباع وسلطانة و ذلك عن طريق تنفيذ اعمال شبكات مياه باقطار من (110 مم : 220 مم ) بطول 92375 م.ط وبه عدد (48) غرفة محابس خرسانية. | المضباع وسلطانه | 0 | 0 | 0 | 0 | 0 | 0 | 113222.5 | 0 | 0 | No | 0 | 0.40000000000000568 | -0.40000000000000568 | Good Progress | 0.14000000000000057 | 7.9999999999998295E-2 | 6.0000000000002274E-2 | 1.5499999999999972 | 2.0999999999999943 | 1.3599999999999994 | 1.1200000000000045 | 1.0499999999999972 | 0.15000000000000568 | 0.53999999999999204 | 0 | 1.9900000000000091 | 0.84500000000000008 | 0.53909537296550003 | 1797 | 1.0339454646633277 | -60.999999999999886 | -2.0333333333333297 | -3.3945464663327707E-2 | 0.21760000000000004 | 13882503.332224004 | -6827460.6551921451 | 15964878.832384005 | -7851579.7536314921 | -3.5672131147541056E-3 | -0.10701639344262318 | -261719.32512104971 | 1.3096110599078344E-2 | -0.25154546466332772 | أخرى | 58.863153893482007 | 73.36800934 | 14.504855446517993 | 0.80230000000000012 | No | 44300 | within time | 44227 | within time | -16 | 57 | Within Time | 4.3329657689041623 | 68.714542571095834 | 0 | 0 | 0 | 73.047508339999993 | 42.034308000000003 | 0.65886282912454297 | 0.78064336898627606 | 3.3945464663327707E-2 | 80.084999999999994 | 4.105000000000004 | R | 19.77 | Delayed | R | أخرى | |||||||||||||||||||||||||||||||||||||||||||||||||||
| 106 | P1805 | 24/23/2/44/0045/1 | تنفيذ المرحلة الاولى من استبدال انابيب الاسبستوس بشبكة مياه الرياض (عقد رقم3) | الأوسط | وحدة عمل الرياض | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45379 | 46109 | 1.0452054794520549 | 70615305 | 70.615305000000006 | 70615305 | 70.615305000000006 | 0 | 70.615305000000006 | نعم | منجز في تاريخه | 46053 | 46053 | لا | استلام ابتدائي | استلام ابتدائي | شركة ضيف الله العتيبي للمقاولات | مكتب الياردة للاستشارات الهندسية | جاري | 46984 | 0 | 0.92328767123287669 | 0.9616438356164384 | 1.0041095890410958 | 1.0452054794520549 | 1.0876712328767124 | 1.1287671232876713 | 1.1712328767123288 | 1.2136986301369863 | 1.2547945205479452 | 1.2972602739726027 | 1.3383561643835618 | 1.3808219178082193 | Null | 0 | 0 | 0 | 0 | 1.92 | 3.73 | 11.07 | 11.07 | 21.91 | 23.52 | 30.07 | 37.82 | 39.28 | 40.61 | 42.26 | 48.04 | 54.73 | 62.12 | 65.209999999999994 | 70.16 | 74.39 | 77.09 | 84.07 | 84.57 | 84.57 | 84.57 | 84.57 | 84.57 | 0 | 0 | 0.13900000000000001 | 1.696 | 3.581 | 3.581 | 11.074 | 14.631 | 20.225999999999999 | 25.504999999999999 | 30.86 | 36.020000000000003 | 42.18 | 47.99 | 54.56 | 59.91 | 64.73 | 71.819999999999993 | 77.67 | 82.89 | 87.74 | 91.68 | 91.68 | 91.68 | 91.68 | 91.68 | 0 | 0 | 0 | 0 | 0 | 0 | 18525 | 0 | 0 | منجز حسب الخطة | ضمن الخطة الأساسية | No | 62.664000000000001 | 47.02 | 15.643999999999998 | Low Progress | 5.7800000000000011 | 6.6899999999999977 | 7.3900000000000006 | 3.0899999999999963 | 4.9500000000000028 | 4.230000000000004 | 2.7000000000000028 | 6.9799999999999898 | 0.5 | 0 | 0 | 0 | 3.5258333333333329 | 2.4897779621249998 | 730 | 1.0452054794520549 | -33.000000000000064 | -1.1000000000000021 | -4.5205479452054886E-2 | 0.15430000000000008 | 10895941.561500005 | -9905401.41954544 | 10895941.561500005 | -9905401.41954544 | -4.6757575757575692E-3 | -0.14027272727272708 | -330180.04731818137 | -1.5839859375000008E-2 | -0.19950547945205496 | المشاريع الاستراتيجية | نعم | 59.719363438500004 | 64.740111624000008 | 5.020748185500004 | 0.92889999999999995 | No | 45370 | within time | 45335 | within time | 9 | 44 | Within Time | 73.838585749999993 | 0 | 0 | 0 | 0 | 73.838585749999993 | 47.277169999999998 | 0.66950316223940398 | 0.84636645014787337 | 0.16780547945205493 | 94.647499999999994 | -2.9674999999999869 | R | 7.11 | Delayed | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||
| 107 | P24 | 06/23/2/12/0040/1 | مشروع تنفيذ خطوط فرعية للصرف الصحى لأحياء متفرقة شرق مدينة أبها - المرحلة الثالثة | الجنوبي | منطقة عسير | مشاريع الحزمة الأولى | صرف | خطوط وشبكات | 45540 | 46657 | 0.53894359892569377 | 9551225 | 9.5512250000000005 | 10983908.75 | 10.983908749999999 | 0 | 10.983908749999999 | لا | تحت التنفيذ | منتظم | مؤسسة الهدف المثالي لصاحبها عبدالله علي عبدالله عسيري | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | 0 | 0.45926589077887198 | 0.48433303491495078 | 0.51208594449418088 | 0.53894359892569377 | 0.56669650850492392 | 0.59355416293643692 | 0.62130707251566697 | 0.64905998209489701 | 0.67591763652641002 | 0.70367054610564006 | 0.73052820053715306 | 0.75828111011638322 | Null | 0 | 0 | 0 | 0 | 0 | 0.56999999999999995 | 1.2 | 1.38 | 1.6 | 5.35 | 6.69 | 6.71 | 9.42 | 16.66 | 21.21 | 22.88 | 23.18 | 25.11 | 27.18 | 27.18 | 32.94 | 32.94 | 0 | 0 | 0 | 0 | 0.41 | 5.03 | 8.4700000000000006 | 12.45 | 15.22 | 21.13 | 26.19 | 30.4 | 36.130000000000003 | 41.18 | 45.97 | 24.31 | 26.74 | 30.52 | 30.52 | 44.52 | 32.94 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 20500 | 0 | 0 | No | 45.97 | 22.88 | 23.09 | Low Progress | 3.7499999999999996 | 1.3400000000000007 | 1.9999999999999574E-2 | 2.71 | 7.24 | 4.5500000000000007 | 1.6699999999999982 | 0.30000000000000071 | 1.9299999999999997 | 2.0700000000000003 | 0 | 5.759999999999998 | 2.6116666666666664 | 0.24944615958333333 | 1117 | 0.53894359892569377 | 515.00000000000011 | 17.166666666666671 | 0.46105640107430623 | 0.72819999999999996 | 6955202.044999999 | 405157.40067961148 | 7998482.3517499994 | 465931.01078155322 | 1.4139805825242715E-3 | 4.2419417475728145E-2 | 15531.033692718442 | -0.26714359892569373 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 365 | نعم | نعم | 3.6180995422499995 | 3.6180995422499995 | 0 | 1 | No | 45519 | Out | 45481 | within time | 21 | 59 | Within Time | 2.0360027958333333 | 8.4891329541666671 | 0 | 0 | 0 | 10.52513575 | 1609362.3100500002 | 1.8246579999999999 | 0.19103915989833761 | 0.23224367636825091 | 0.29584359892569378 | 31.015000000000001 | -4.2750000000000021 | R | 0 | Regular | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 108 | P569 | 7/25/2/4/P569/1 | مشروع توصيل المياه من محطة المعالجة إلى منتزه حائل البري - المرحلة الأولى | الشمالي | منطقة حائل | إيرادات الشركة | صرف | إعادة إستعمال المياه المعالجة | 45803 | 46125 | 1.0527950310559007 | 13109646 | 13.109646 | 15076092.9 | 15.076092900000001 | 0 | 15.076092900000001 | نعم | 46356 | نعم | ضمن المتعثر خلال العام 2026 | إيقاف جزئي | متعثر | شركة عروة للمقاولات | شركة عبدالله عبدالرحمن السعيد للاستشارات الهندسية شركة مهنية شخص واحد | جاري | 46999 | 0 | 0.77639751552795033 | 0.86335403726708071 | 0.95962732919254656 | 1.0527950310559007 | 1.1490683229813665 | 1.2422360248447204 | 1.3385093167701863 | 1.4347826086956521 | 1.5279503105590062 | 1.6242236024844721 | 1.7173913043478262 | 1.813664596273292 | Null | متوقع تعثره (مدة منقضية) | 46018 | Permissions | 0 | 0 | 1.67 | 10.53 | 22.05 | 40.58 | 50.1 | 61.94 | 61.95 | 61.95 | 65 | 65 | 0 | 0.11 | 3.8 | 15.46 | 31.43 | 50.56 | 69.98 | 86.44 | 99.05 | 99.05 | 100 | 100 | 0 | 998 | 5000 | 3696 | No | 50.56 | 40.58 | 9.980000000000004 | Good Progress | 0 | 0 | 0 | 1.67 | 8.86 | 11.520000000000001 | 18.529999999999998 | 9.5200000000000031 | 11.839999999999996 | 1.0000000000005116E-2 | 0 | 3.0499999999999972 | 5.416666666666667 | 0.71010582499999997 | 322 | 1.0527950310559007 | -17.000000000000014 | -0.5666666666666671 | -5.2795031055900665E-2 | 0.38049999999999995 | 4988220.3029999994 | -8802741.7111764625 | 5736453.3484500004 | -10123152.967852933 | -2.238235294117645E-2 | -0.67147058823529349 | -337438.43226176442 | -4.0486972343522559E-3 | -0.43329503105590061 | أخرى | 9.7994603850000015 | 15.076092900000001 | 5.2766325149999993 | 0.65000000000000013 | No | 45790 | within time | 45741 | Out | 13 | 62 | Within Time | 6.7678547475000004 | 8.3082381524999995 | 0 | 0 | 0 | 15.076092899999999 | 7.435975 | 0.56721401935643423 | 0.50385795294675628 | 0.35299503105590058 | 66.349999999999994 | 20.090000000000003 | R | 35 | Troubled | Troubled | أخرى | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 109 | P1321 | 10/23/2/01/0003/1 | توسعة شبكة مياه عرعر (المرحلة السابعة) | الشمالي | منطقة الحدود الشمالية | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45399 | 46646 | 0.59582999198075381 | 50802800 | 50.802799999999998 | 58423220 | 58.423220000000001 | 0 | 58.423220000000001 | لا | تحت التنفيذ | متقدم | شركة عبدالله إبراهيم الصايغ وأولاده للمقاولات | شركة عبدالله عبدالرحمن السعيد للاستشارات الهندسية شركة مهنية شخص واحد | جاري | 46999 | 0 | 0.5244587008821171 | 0.54691259021651961 | 0.57177225340817961 | 0.59582999198075381 | 0.62068965517241381 | 0.64474739374498802 | 0.6696070569366479 | 0.6944667201283079 | 0.71852445870088211 | 0.7433841218925421 | 0.76744186046511631 | 0.79230152365677631 | Null | 0 | 0 | 0 | 0 | 0.1 | 1.25 | 1.25 | 4.0999999999999996 | 6 | 9.5 | 12.3 | 16 | 20.2 | 23.6 | 27.07 | 31.51 | 36.020000000000003 | 41.35 | 48.81 | 53.61 | 58.69 | 65.849999999999994 | 72.67 | 78.87 | 78.87 | 83.26 | 83.26 | 0 | 0 | 0 | 0.03 | 1.1299999999999999 | 1.1299999999999999 | 5.32 | 7.98 | 11.01 | 14.02 | 17.18 | 20.149999999999999 | 23.53 | 27.78 | 31.37 | 39.380000000000003 | 46.54 | 52.93 | 58.56 | 63.64 | 68.099999999999994 | 68.16 | 71.33 | 71.33 | 77.42 | 77.42 | 0 | 0 | 0 | 0 | 0 | 0 | 133415 | 0 | 0 | 0 | No | 52.63 | 49.19 | 3.4400000000000048 | Good Progress | 3.4699999999999989 | 4.4400000000000013 | 4.5100000000000016 | 5.3299999999999983 | 7.4600000000000009 | 4.7999999999999972 | 5.0799999999999983 | 7.1599999999999966 | 6.8200000000000074 | 6.2000000000000028 | 0 | 4.3900000000000006 | 4.9716666666666667 | 2.5257458733333333 | 1247 | 0.59582999198075381 | 504 | 16.8 | 0.40417000801924619 | 0.21129999999999996 | 10734631.639999997 | 638966.16904761887 | 12344826.385999996 | 734811.09440476168 | 4.1924603174603166E-4 | 1.2577380952380949E-2 | 24493.703146825392 | 0.19287000801924623 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 224 | نعم | نعم | 48.643172972000002 | 45.231256924 | -3.4119160480000019 | 1.0584 | No | 45383 | Out | 45343 | within time | 16 | 56 | Within Time | 23.398922966666671 | 25.873969033333331 | 0 | 0 | 0 | 49.272891999999999 | 3589091.4696028489 | 27.226049 | 0.53591630776256427 | 0.66204802332220336 | -8.5170008019246124E-2 | 80.764999999999986 | -12.60499999999999 | R | -5.84 | Regular | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 110 | AP197 | 05/23/2/02/0033/1 | مشروع شبكات الصرف الصحي بمناطق متفرقة بمدينة الدمام | الشرقي | المنطقة الشرقية | مشاريع الحزمة الأولى | صرف | خطوط وشبكات | 45525 | 46187 | 0.93202416918428999 | 11300973 | 11.300973000000001 | 12996118.949999999 | 12.99611895 | 0 | 12.99611895 | نعم | 46295 | نعم | ضمن المتعثر خلال العام 2026 | إيقاف جزئي | متأخر | شركة سالم صالح الحارث للمقاولات العامة | شركة الخدمات الهندسية والفنية للإستشارات المهنية | جاري | 46996 | 0 | تم معالجته | 0.797583081570997 | 0.83987915407854985 | 0.88670694864048338 | 0.93202416918428999 | 0.97885196374622352 | 1.0241691842900302 | 1.0709969788519638 | 1.1178247734138973 | 1.1631419939577039 | 1.2099697885196374 | 1.255287009063444 | 1.3021148036253776 | Null | متوقع تعثره (مدة منقضية) | 45557 | Other Projects Interference | 0 | 0 | 1.41 | 8.0500000000000007 | 13.3 | 19.309999999999999 | 23.88 | 30.65 | 36 | 41.2 | 47.15 | 53.56 | 56.98 | 61.18 | 66.44 | 72.099999999999994 | 74.099999999999994 | 74.099999999999994 | 76.8 | 76.8 | 0 | 0 | 2.73 | 7.02 | 11.6 | 17.420000000000002 | 24.03 | 28.76 | 35.68 | 44.63 | 44.3 | 51.58 | 58.46 | 66.709999999999994 | 78.31 | 86.34 | 81.58 | 93.75 | 100 | 100 | 100 | 0 | 0 | 0 | 0 | 0 | 0 | 13214 | 0 | 0 | No | 71.290000000000006 | 59.77 | 11.520000000000003 | Low Progress | 6.77 | 5.3500000000000014 | 5.2000000000000028 | 5.9499999999999957 | 6.4100000000000037 | 3.4199999999999946 | 4.2000000000000028 | 5.259999999999998 | 5.6599999999999966 | 2 | 0 | 2.7000000000000028 | 4.4099999999999993 | 0.49837290929999994 | 662 | 0.93202416918428999 | 45.000000000000028 | 1.5000000000000009 | 6.7975830815710014E-2 | 0.25900000000000006 | 2926952.0070000007 | 1951301.3379999993 | 3365994.8080500006 | 2243996.538699999 | 5.7555555555555537E-3 | 0.17266666666666661 | 74799.884623333302 | 6.0624798387096781E-3 | -0.19102416918429005 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 81 | نعم | نعم | 9.9810193535999989 | 12.99611895 | 3.0150995964000007 | 0.7679999999999999 | No | 45512 | within time | 45455 | Out | 13 | 70 | Within Time | 4.7294572005000006 | 6.843363749499999 | 0 | 0 | 0 | 11.572820950000001 | 478777.02211799996 | 5.9747370000000002 | 0.52869226393161006 | 0.6679313011173853 | 6.8624169184289929E-2 | 79.669999999999987 | 1.9100000000000108 | R | 23.2 | Delayed | SV | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 111 | P632 | 11/23/2/01/0006/1 | مشروع تنفيذ شبكات مياه محافظة القريات والقرى المجاورة لها (المرحلة السابعة) بمنطقة الجوف. | الشمالي | منطقة الجوف | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45400 | 46396 | 0.74497991967871491 | 48187490 | 48.187489999999997 | 55415613.5 | 55.415613499999999 | 0 | 55.415613499999999 | نعم | 46356 | نعم | تحت التنفيذ | منتظم | شركة مسعود بالعيد حيدر ال حيدر وشركاه للتجارة والمقاولات العامة التضامنية | شركة عبدالله عبدالرحمن السعيد للاستشارات الهندسية شركة مهنية شخص واحد | جاري | 46999 | 0 | 0.65562248995983941 | 0.6837349397590361 | 0.71485943775100402 | 0.74497991967871491 | 0.77610441767068272 | 0.80622489959839361 | 0.83734939759036142 | 0.86847389558232935 | 0.89859437751004012 | 0.92971887550200805 | 0.95983935742971882 | 0.99096385542168675 | Null | 0 | 0 | 0 | 0 | 0 | 0.69 | 0.69 | 10.15 | 15.5 | 23.5 | 30.5 | 38.93 | 43 | 49.98 | 53 | 56 | 58 | 63.25 | 67 | 70.2 | 73 | 73.7 | 76 | 78 | 78 | 83.5 | 83.5 | 0 | 0 | 0 | 0.16 | 1.35 | 1.35 | 6.35 | 10.71 | 15.61 | 20.99 | 26.76 | 32.380000000000003 | 38.5 | 44.79 | 50.44 | 56.59 | 64.22 | 70.69 | 76.7 | 82.59 | 75.069999999999993 | 78.31 | 81.89 | 81.89 | 90.5 | 90.5 | 0 | 0 | 0 | 0 | 0 | 0 | 187900 | 0 | 0 | No | 66.98 | 49.5 | 17.480000000000004 | Low Progress | 3.0200000000000031 | 3 | 2 | 5.25 | 3.75 | 3.2000000000000028 | 2.7999999999999972 | 0.70000000000000284 | 2.2999999999999972 | 2 | 0 | 5.5 | 2.7933333333333334 | 1.3460372206666669 | 996 | 0.74497991967871491 | 253.99999999999994 | 8.466666666666665 | 0.25502008032128509 | 0.22 | 10601247.800000001 | 1252115.8818897642 | 12191434.970000001 | 1439933.2641732288 | 8.6614173228346473E-4 | 2.598425196850394E-2 | 47997.775472440953 | 3.5020080321285091E-2 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 127 | نعم | نعم | 46.2720372725 | 50.151130217500004 | 3.8790929450000036 | 0.92999999999999994 | No | 45372 | Out | 45344 | within time | 28 | 56 | Within Time | 11.251778915000001 | 42.104897584999996 | 0 | 0 | 0 | 53.356676499999999 | 2403929.3136299998 | 31.042797 | 0.64420863174238796 | 0.74177860178109178 | -5.7200803212850149E-3 | 82.08 | -3.769999999999996 | R | 7 | Delayed | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 112 | AD62 | 25/23/2/11/0028/1 | إنشاء جزء من المشروع رقم (FP1053) بامتداد خط P3A في أحياء جنوب جدة الواقعة غرب طريق الليث | الغربي | وحدة عمل جدة | المشاريع الملحة | مياه | خطوط وشبكات | 45427 | 46157 | 0.97945205479452058 | 35364324 | 35.364324000000003 | 40668972.600000001 | 40.668972600000004 | 0 | 40.668972600000004 | نعم | 46295 | نعم | متوقع تعثره (مدة منقضية) | تحت التنفيذ | متأخر | شركة السبق العربي للتجارة والمقاولات | شركة بيت الخبرة للاستشارات الهندسية | جاري | 46985 | 0 | 0.8575342465753425 | 0.89589041095890409 | 0.93835616438356162 | 0.97945205479452058 | 1.021917808219178 | 1.0630136986301371 | 1.1054794520547946 | 1.1479452054794521 | 1.189041095890411 | 1.2315068493150685 | 1.2726027397260273 | 1.3150684931506849 | Null | متوقع تعثره (مدة منقضية) | 0 | 0 | 0 | 0 | 0 | 0 | 3.31 | 12.44 | 28.37 | 40.950000000000003 | 46.82 | 55.3 | 56.15 | 56.2 | 62.12 | 65.19 | 69.180000000000007 | 75.06 | 76.930000000000007 | 79.95 | 80.03 | 82.63 | 83.87 | 83.87 | 84.65 | 84.65 | 0 | 0 | 0 | 0.67 | 0.67 | 4.63 | 7.96 | 11.23 | 16.23 | 16.239999999999998 | 27.02 | 33.950000000000003 | 41.18 | 51 | 59.42 | 68 | 75.569999999999993 | 80.36 | 85.46 | 90.56 | 91.46 | 94.08 | 94.08 | 98.4 | 98.4 | 0 | 0 | 0 | 0 | 0 | 0 | 6110.22 | 0 | 0 | No | 74.22999999999999 | 51.58 | 22.649999999999991 | Low Progress | 5.0000000000004263E-2 | 5.9199999999999946 | 3.0700000000000003 | 3.9900000000000091 | 5.8799999999999955 | 1.8700000000000045 | 3.019999999999996 | 7.9999999999998295E-2 | 2.5999999999999943 | 1.2400000000000091 | 0 | 0.78000000000000114 | 2.3750000000000004 | 0.83990269500000025 | 730 | 0.97945205479452058 | 14.999999999999979 | 0.49999999999999928 | 2.0547945205479423E-2 | 0.16129999999999994 | 5704265.4611999989 | 11408530.922400014 | 6559905.2803799985 | 13119810.560760016 | 1.0753333333333346E-2 | 0.32260000000000039 | 437327.01869200054 | 7.0508383233532914E-3 | -0.14075205479452052 | المشاريع الاستراتيجية | تنفيذ المشروع حسب الجدول الزمني المعتمد | نعم | 34.426285305900002 | 40.018269038400007 | 5.5919837325000046 | 0.86249999999999993 | No | 45427 | within time | 45357 | Out | 0 | 70 | Within Time | 8.1691588440000036 | 30.224441756000001 | 0 | 0 | 0 | 38.393600600000006 | 3536432 | 26.089257 | 0.73772814093661165 | 0.80624791777514271 | 7.3852054794520505E-2 | 87.155000000000001 | 4.3049999999999926 | R | 13.75 | Delayed | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 113 | P111 | 06/23/2/01/0062/1 | مشروع تنفيذ خط نقل المياه من خزان البرك الى محطة التوزيع الجديدة بدبساء | الجنوبي | منطقة عسير | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45624 | 46776 | 0.44965277777777779 | 9442780 | 9.4427800000000008 | 10859197.01 | 10.859197009999999 | 0 | 10.859197009999999 | لا | تحت التنفيذ | متأخر | شركة توجه المشاريع للمقاولات(شركة ذات المسئولية المحدودة شركة شخص واحد ) | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | 0 | 0.37239583333333331 | 0.3967013888888889 | 0.4236111111111111 | 0.44965277777777779 | 0.4765625 | 0.50260416666666663 | 0.52951388888888884 | 0.55642361111111116 | 0.58246527777777779 | 0.609375 | 0.63541666666666663 | 0.66232638888888884 | Null | 0 | 0 | 0 | 0.5 | 0.5 | 1.01 | 1.46 | 5.0999999999999996 | 8.6 | 12.05 | 17.59 | 23.01 | 28.98 | 28.98 | 29.51 | 29.52 | 29.52 | 29.54 | 29.54 | 0 | 0 | 1.02 | 2.92 | 4.22 | 6.81 | 12.74 | 16.47 | 21.97 | 27.05 | 32.97 | 38.97 | 43.15 | 30.43 | 32.25 | 32.25 | 39.520000000000003 | 43.19 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 38.97 | 28.98 | 9.9899999999999984 | Good Progress | 0.44999999999999996 | 3.6399999999999997 | 3.5 | 3.4500000000000011 | 5.5399999999999991 | 5.4200000000000017 | 5.9699999999999989 | 0 | 0.53000000000000114 | 9.9999999999980105E-3 | 0 | 1.9999999999999574E-2 | 2.3774999999999999 | 0.22450209450000003 | 1152 | 0.44965277777777779 | 634 | 21.133333333333333 | 0.55034722222222221 | 0.70480000000000009 | 6655271.3440000005 | 314918.20239747636 | 7653562.0526480004 | 362155.93309059937 | 1.111671924290221E-3 | 3.3350157728706628E-2 | 12071.864436353315 | 1.8051510204081637E-2 | -0.15445277777777788 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 365 | نعم | نعم | 3.2078067967539994 | 4.6900871886189996 | 1.4822803918650003 | 0.86349999999999993 | No | 45594 | Out | 45559 | Out | 30 | 65 | No | 2.2434471483333334 | 7.5970718516666667 | 0 | 0 | 0 | 9.8405190000000005 | 1486271.1272465878 | 1.4904440000000001 | 0.15783953454385255 | 0.29025814210046702 | 1.8152777777777795E-2 | 36.112499999999997 | -5.6824999999999974 | R | 13.65 | Delayed | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 114 | P1606 | 01/23/2/01/0010/1 | عقد استكمال تنفيذ شبكات المياه بمحافظة المجمعة (المرحلة الأولى) | الأوسط | منطقة الرياض | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45322 | 46341 | 0.80471050049067716 | 23014350 | 23.01435 | 26466502.5 | 26.466502500000001 | 0 | 26.466502500000001 | لا | ضمن المتعثر خلال العام 2026 | تحت التنفيذ | متأخر | مؤسسة الذرابه للمقاولات | مكتب الياردة للاستشارات الهندسية | جاري | 46984 | 0 | تم معالجته | 0.71736997055937191 | 0.74484789008832186 | 0.77526987242394507 | 0.80471050049067716 | 0.83513248282630026 | 0.86457311089303235 | 0.89499509322865556 | 0.92541707556427866 | 0.95485770363101075 | 0.98527968596663396 | 1.014720314033366 | 1.0451422963689891 | Null | متوقع تعثره (مدة منقضية) | 0 | 0 | 0 | 0 | 0.33 | 1.46 | 4.51 | 6.75 | 12 | 12 | 17.399999999999999 | 22 | 27.58 | 28.95 | 32.020000000000003 | 35.21 | 36.159999999999997 | 36.6 | 40.36 | 41.12 | 42.2 | 47.15 | 52.29 | 56.3 | 58.03 | 59.03 | 61.19 | 61.19 | 62.04 | 62.04 | 0 | 0 | 0.03 | 1.03 | 2.63 | 6.07 | 9.67 | 9.67 | 18.22 | 23.44 | 31.1 | 36.450000000000003 | 42.35 | 49.24 | 55.9 | 42.55 | 47.79 | 53.88 | 60.82 | 70.09 | 77.239999999999995 | 59.65 | 68.040000000000006 | 76.62 | 86.17 | 86.17 | 74.59 | 74.59 | 0 | 0 | 0 | 0 | 0 | 0 | 141900 | 0 | 0 | 0 | No | 28.549999999999997 | 28.72 | -0.17000000000000171 | Good Progress | 0.44000000000000483 | 3.759999999999998 | 0.75999999999999801 | 1.0800000000000054 | 4.9499999999999957 | 5.1400000000000006 | 4.009999999999998 | 1.730000000000004 | 1 | 2.1599999999999966 | 0 | 0.85000000000000142 | 2.1566666666666667 | 0.49634281499999999 | 1019 | 0.80471050049067716 | 198.99999999999997 | 6.633333333333332 | 0.19528949950932284 | 0.3881 | 8931869.2349999994 | 1346512.9500000002 | 10271649.620250002 | 1548489.8925000005 | 1.9502512562814074E-3 | 5.8507537688442225E-2 | 51616.329750000012 | 7.213497624703088E-3 | -0.19281050049067716 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 137 | نعم | نعم | 16.419818151000001 | 19.74136421475 | 3.3215460637499987 | 0.87450000000000006 | No | 45316 | within time | 45204 | Out | 6 | 118 | Within Time | 4.8138348750000013 | 20.184117624999999 | 0 | 0 | 0 | 24.9979525 | 1237573.6568999998 | 11.40929 | 0.49574678407167705 | 0.58319115137794675 | 0.12431050049067704 | 64.5 | 12.120000000000005 | R | 12.55 | Delayed | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||
| 115 | P1791 | 01/23/2/01/0046/1 | عقد استكمال تنفيذ مشاريع المياه بمحافظة الحريق | الأوسط | منطقة الرياض | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45669 | 46862 | 0.3964794635373009 | 17187900 | 17.187899999999999 | 19766085 | 19.766085 | 0 | 19.766085 | لا | تحت التنفيذ | منتظم | شركة كنان العربية للمقاولات العامة | مكتب الياردة للاستشارات الهندسية | جاري | 46984 | 0 | 0.32187761944677284 | 0.34534786253143335 | 0.37133277451802177 | 0.3964794635373009 | 0.42246437552388938 | 0.44761106454316846 | 0.47359597652975693 | 0.49958088851634536 | 0.52472757753562449 | 0.55071248952221286 | 0.57585917854149204 | 0.60184409052808052 | Null | 0 | 0 | 0 | 0 | 0 | 0 | 1.87 | 7.4 | 14.28 | 22.94 | 26.15 | 31.12 | 35.74 | 36.270000000000003 | 37.03 | 37.03 | 37.03 | 37.03 | 0 | 0 | 0 | 0.41 | 1.1200000000000001 | 2.54 | 6.22 | 10.48 | 17.579999999999998 | 23.92 | 30.89 | 34.130000000000003 | 37.97 | 41.78 | 41.78 | 49.43 | 37.03 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.7 | 0 | No | 30.89 | 31.12 | -0.23000000000000043 | Good Progress | 0 | 1.87 | 5.53 | 6.879999999999999 | 8.6600000000000019 | 3.2099999999999973 | 4.9700000000000024 | 4.620000000000001 | 0.53000000000000114 | 0.75999999999999801 | 0 | 0 | 3.0858333333333334 | 0.53038994750000001 | 1193 | 0.3964794635373009 | 720 | 24 | 0.6035205364626991 | 0.62970000000000004 | 10823220.630000001 | 450967.52625000005 | 12446703.7245 | 518612.6551875 | 8.7458333333333333E-4 | 2.6237500000000004E-2 | 17287.088506249998 | 9.305283400809718E-3 | -2.617946353730094E-2 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 314 | نعم | نعم | 7.3193812754999996 | 7.3193812754999996 | 0 | 1 | No | 45662 | within time | 45614 | within time | 7 | 55 | Within Time | 5.3038994749999997 | 13.004020525000001 | 0 | 0 | 0 | 18.307920000000003 | 10621255.548500001 | 4.4909249999999998 | 0.26128410102455796 | 0.35833627571665116 | 5.5179463537300855E-2 | 44.997500000000002 | -7.0275000000000034 | R | 0 | Regular | R | المشاريع الاستراتيجية | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 116 | 10094 | 05/22/2/44/0026/1 | مشروع إستبدال خطوط المياه الرئيسية والفرعية بمدينة الدمام- مرحلة اولي | الشرقي | المنطقة الشرقية | مشاريع المدن الساحلية | مياه | خطوط وشبكات | 45218 | 46228 | 0.91485148514851489 | 54290712.020000003 | 54.290712020000001 | 62434318.829999998 | 62.434318829999995 | 0 | 62.434318829999995 | نعم | 46387 | نعم | تحت التنفيذ | متأخر | شركة المياه الخليجية للمقاولات | شركة الخدمات الهندسية والفنية للإستشارات المهنية | جاري | 46996 | ضعف آداء المقاول | 0.82673267326732669 | 0.85445544554455444 | 0.88514851485148516 | 0.91485148514851489 | 0.9455445544554455 | 0.97524752475247523 | 1.0059405940594059 | 1.0366336633663367 | 1.0663366336633664 | 1.0970297029702971 | 1.1267326732673266 | 1.1574257425742573 | Null | 45454 | Other Projects Interference | 0 | 0.31 | 0.75 | 1.9 | 3.78 | 8.5 | 12.67 | 12.67 | 15.37 | 16 | 16.8 | 20.8 | 25.26 | 25.75 | 29.36 | 32.82 | 33.729999999999997 | 35.659999999999997 | 39 | 44.05 | 44.86 | 45.65 | 46.58 | 47.62 | 48.3 | 48.3 | 50.16 | 50.16 | 2.31 | 4.04 | 6.31 | 7.81 | 13.63 | 16.91 | 22.47 | 22.47 | 39.72 | 24.66 | 26.7 | 30.71 | 35.24 | 43.98 | 48.86 | 33.15 | 39.85 | 47.28 | 53.47 | 62.21 | 67.459999999999994 | 100 | 48.98 | 53.54 | 58.77 | 58.77 | 68.98 | 68.98 | 0 | 0 | 0 | 0 | 0 | 0 | 109196 | 0 | 0 | No | 73.3 | 28.849999999999998 | 44.45 | Low Progress | 3.4600000000000009 | 0.90999999999999659 | 1.9299999999999997 | 3.3400000000000034 | 5.0499999999999972 | 0.81000000000000227 | 0.78999999999999915 | 0.92999999999999972 | 1.0399999999999991 | 0.67999999999999972 | 0 | 1.8599999999999994 | 1.7333333333333332 | 0.94103900834666665 | 1010 | 0.91485148514851489 | 85.999999999999957 | 2.8666666666666654 | 8.5148514851485113E-2 | 0.51700000000000002 | 28068298.114340004 | 9791266.7840720993 | 32278542.835110001 | 11259956.802945355 | 6.0116279069767475E-3 | 0.18034883720930242 | 375331.89343151182 | -4.6343587403012334E-3 | -0.4318514851485149 | مشاريع التحول الوطني | 31.317054325127998 | 43.067193128933994 | 11.750138803805996 | 0.81180000000000008 | No | 45211 | within time | 45161 | within time | 7 | 57 | Within Time | 8.5688840471566667 | 53.302901782843328 | 0 | 0 | 0 | 61.871785829999993 | 21.903103000000002 | 0.40344107095024245 | 0.46768684079921363 | 0.42505148514851493 | 51.78 | 1.759999999999998 | R | 18.82 | Delayed | R | مشاريع التحول الوطني | |||||||||||||||||||||||||||||||||||||||||||||||||||||
| 117 | P374 | 05/23/2/15/0013/1 | زيادة طاقة محطات الضخ القائمة وإنشاء خطوط انحدار رئيسية وخطوط طرد بمناطق متفرقة بالجبيل | الشرقي | المنطقة الشرقية | مشاريع المدن الساحلية | صرف | محطات الرفع | 45335 | 46380 | 0.77224880382775118 | 68498025 | 68.498024999999998 | 78772728.75 | 78.772728749999999 | 0 | 78.772728749999999 | لا | تحت التنفيذ | متأخر | شركة نظم البيئة للمقاولات | شركة الخدمات الهندسية والفنية للإستشارات المهنية | جاري | 46996 | 0 | 0.68708133971291863 | 0.71387559808612444 | 0.74354066985645928 | 0.77224880382775118 | 0.80191387559808613 | 0.83062200956937804 | 0.86028708133971288 | 0.88995215311004783 | 0.91866028708133973 | 0.94832535885167468 | 0.97703349282296648 | 1.0066985645933015 | Null | ضعف آداء المقاول | ضعف آداء مقاول | •نظرا لعدم تحسن أداء المقاول خلال فترة الانذار النهائى,تم الرفع بإستكمال اجراءات سحب المشروع | تم تخفيض العقد بنسبة 20% لبند التوصيلات المنزلية - تم اعادة طلب زيادة قيمة العقد بنسبة 20% مع تمديد العقد 7.2 شهر نتيجة زيادة كميات الصخر عن الكميات التعاقدية | 45566 | Land Acquisition | 0 | 0 | 0.34 | 0.34 | 0.4 | 0.47 | 0.47 | 5.38 | 9.64 | 12.54 | 14.44 | 16.66 | 18.93 | 24.76 | 27.68 | 29.06 | 30.13 | 31.96 | 34.200000000000003 | 35.840000000000003 | 37.590000000000003 | 39.57 | 40.380000000000003 | 41.33 | 41.33 | 43.34 | 43.34 | 0 | 0.35 | 0.66 | 1 | 1.42 | 2.48 | 2.48 | 8.5500000000000007 | 12.49 | 17.87 | 23.15 | 11.34 | 38.71 | 48.27 | 52.57 | 59.01 | 65.44 | 36.22 | 44.02 | 51.56 | 57.4 | 67.52 | 41.01 | 45.09 | 45.09 | 54.69 | 54.69 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 17750 | 0 | 0 | No | 39.53 | 25.050000000000004 | 14.479999999999997 | Low Progress | 2.9199999999999982 | 1.379999999999999 | 1.0700000000000003 | 1.8300000000000018 | 2.240000000000002 | 1.6400000000000006 | 1.75 | 1.9799999999999969 | 0.81000000000000227 | 0.94999999999999574 | 0 | 2.0100000000000051 | 1.5483333333333336 | 1.0605777537500003 | 1045 | 0.77224880382775118 | 238 | 7.9333333333333336 | 0.22775119617224882 | 0.5867 | 40187791.267499998 | 5065687.9748949576 | 46215959.957625002 | 5825541.1711292015 | 2.4651260504201683E-3 | 7.3953781512605038E-2 | 194184.70570430675 | -0.35894880382775118 | مشاريع التحول الوطني | 34.140100640250004 | 43.080805353374998 | 8.9407047131249939 | 0.88650000000000007 | No | 45321 | within time | 45253 | Out | 14 | 82 | Within Time | 9.4584356187499985 | 61.902078131250001 | 0 | 0 | 0 | 71.360513749999996 | 24.7728 | 0.36165714266944193 | 0.39713627169270782 | 9.7048803827751273E-2 | 44.215000000000003 | -3.2050000000000054 | R | 11.35 | Delayed | R | مشاريع التحول الوطني | |||||||||||||||||||||||||||||||||||||||||||||||||||||
| 118 | 10121 | 24/23/2/02/0027/1 | عقد تنفيذ شبكات صرف صحي بأجزاء من أحياء (القدس والملك عبدالله) | الأوسط | وحدة عمل الرياض | مشاريع الحزمة الأولى | صرف | خطوط وشبكات | 45278 | 46410 | 0.76325088339222613 | 9510336 | 9.5103360000000006 | 10936886.4 | 10.936886400000001 | 0 | 10.936886400000001 | لا | متوقع تعثره (مدة منقضية) | تحت التنفيذ | منتظم | شركة ربوة التعمير راكو | مكتب الياردة للاستشارات الهندسية | جاري | 46984 | 0 | 0.68462897526501765 | 0.70936395759717319 | 0.73674911660777387 | 0.76325088339222613 | 0.79063604240282681 | 0.81713780918727918 | 0.84452296819787986 | 0.87190812720848054 | 0.89840989399293292 | 0.9257950530035336 | 0.95229681978798586 | 0.97968197879858654 | Null | متوقع تعثره (مدة منقضية) | ضعف اّداء المقاول فني وإداري | 0 | 0 | 0 | 0 | 0.56000000000000005 | 0.88 | 1.91 | 4 | 5.13 | 5.13 | 10.85 | 14.1 | 15.66 | 22.3 | 27.52 | 32.24 | 33 | 36.19 | 40.9 | 42.35 | 50.92 | 53.24 | 57.71 | 59.99 | 61.38 | 62.6 | 65.239999999999995 | 65.239999999999995 | 65.59 | 65.59 | 0 | 0.27 | 2.2400000000000002 | 6.19 | 10.15 | 14.81 | 19.89 | 19.89 | 29.82 | 34.57 | 39.479999999999997 | 44.66 | 49.67 | 33.35 | 38.03 | 44.22 | 48.71 | 55.68 | 62.34 | 57.27 | 62.62 | 61.67 | 66.12 | 71.069999999999993 | 76.099999999999994 | 76.099999999999994 | 73.900000000000006 | 73.900000000000006 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 25000 | 0 | 0 | No | 22.190000000000005 | 44.33 | -22.139999999999993 | Good Progress | 3.1899999999999977 | 4.7100000000000009 | 1.4500000000000028 | 8.57 | 2.3200000000000003 | 4.4699999999999989 | 2.2800000000000011 | 1.3900000000000006 | 1.2199999999999989 | 2.6399999999999935 | 0 | 0.35000000000000853 | 2.7158333333333338 | 0.25828487520000004 | 1132 | 0.76325088339222613 | 268 | 8.9333333333333336 | 0.23674911660777387 | 0.34760000000000008 | 3305792.7936000009 | 370051.43211940309 | 3801661.7126400005 | 425559.14693731349 | 1.2970149253731347E-3 | 3.8910447761194039E-2 | 14185.304897910451 | 1.4480022857142862E-2 | -0.11085088339222621 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 169 | نعم | نعم | 7.1735037897600016 | 8.0823590496000008 | 0.90885525983999926 | 0.91690000000000005 | No | 45274 | within time | 45222 | within time | 4 | 56 | Within Time | 2.5551102719999994 | 7.6964711280000007 | 0 | 0 | 0 | 10.251581399999999 | 316444.51099999994 | 5.2636070000000004 | 0.55346172837636864 | 0.61721605464384821 | 0.10205088339222612 | 69.527500000000003 | 1.5424999999999898 | R | 8.31 | Delayed | R | المشاريع الاستراتيجية | ||||||||||||||||||||||||||||||||||||||||||||||
| 119 | 10199 | 25/23/2/02/0022/1 | مشروع تنفيذ الخطوط الفرعية غير المنفذة للصرف الصحى للعقد (12هـ) حى الشاطىء (3) بجدة | الغربي | وحدة عمل جدة | مشاريع المدن الساحلية | صرف | خطوط وشبكات | 45330 | 46061 | 1.1108071135430917 | 64181240 | 64.181240000000003 | 73808426 | 73.808425999999997 | 0 | 73.808425999999997 | نعم | 46203 | نعم | متوقع تعثره (مدة منقضية) | تحت التنفيذ | متأخر | شركة علي القرني الرزقي للمقاولات | شركة بيت الخبرة للاستشارات الهندسية | جاري | 46985 | 0 | 0.98905608755129959 | 1.027359781121751 | 1.069767441860465 | 1.1108071135430917 | 1.1532147742818057 | 1.1942544459644322 | 1.2366621067031465 | 1.2790697674418605 | 1.320109439124487 | 1.362517099863201 | 1.4035567715458277 | 1.4459644322845417 | Null | متوقع تعثره (مدة منقضية) | 0 | 0 | 0 | 0 | 0 | 0.11 | 0.38300000000000001 | 4.1900000000000004 | 4.1900000000000004 | 11.86 | 16.93 | 21.78 | 24.05 | 27.43 | 31.28 | 34.64 | 39.65 | 46.02 | 51.81 | 59.98 | 64.31 | 70.05 | 76.12 | 80.42 | 80.510000000000005 | 80.55 | 80.55 | 80.72 | 80.72 | 0 | 0 | 1.1000000000000001 | 2.4 | 5.8 | 11 | 11 | 21.5 | 23.07 | 26.731000000000002 | 34.656999999999996 | 38.94 | 46.26 | 55.56 | 58.4 | 61.79 | 65.64 | 73.180000000000007 | 81.28 | 88.01 | 95.27 | 98.94 | 99.85 | 100 | 100 | 100 | 100 | 0 | 0 | 0 | 0 | 0 | 0 | 28569.99 | 0 | 0 | No | 68.538999999999987 | 54.34 | 14.198999999999984 | Low Progress | 5.009999999999998 | 6.3700000000000045 | 5.7899999999999991 | 8.1699999999999946 | 4.3300000000000054 | 5.7399999999999949 | 6.0700000000000074 | 4.2999999999999972 | 9.0000000000003411E-2 | 3.9999999999992042E-2 | 0 | 0.17000000000000171 | 3.84 | 2.4645596159999998 | 731 | 1.1108071135430917 | -81.000000000000028 | -2.7000000000000011 | -0.1108071135430917 | 0.19450000000000003 | 12483251.180000002 | -4623426.3629629621 | 14355738.857000003 | -5316940.3174074059 | -2.4012345679012342E-3 | -7.2037037037037024E-2 | -177231.34391358023 | 3.2011005586592184E-3 | -0.3053071135430917 | مشاريع التحول الوطني | 59.578161467199998 | 73.808425999999997 | 14.2302645328 | 0.80720000000000003 | No | 45316 | within time | 45271 | within time | 14 | 59 | Within Time | 24.554672736666667 | 43.991575263333331 | 0 | 0 | 0 | 68.546247999999991 | 46.627459000000002 | 0.72649669903541902 | 0.81008524254647329 | 0.12140711354309175 | 91.94 | 7.9099999999999966 | R | 19.28 | Delayed | R | مشاريع التحول الوطني | |||||||||||||||||||||||||||||||||||||||||||||||||||||
| 120 | NA-00111 | 12/23/2/01/0016/1 | استكمال ربط شبكات المياه و الخطوط الناقله تحسينها في مواقع متفرقه من محافظات منطقه جازان لخدمه لخدمه طلبات التوصيلات المنزليه | الجنوبي | منطقة جازان | مشاريع الحزمة الأولى | مياه | خطوط وشبكات | 45636 | 46774 | 0.44463971880492092 | 12096100 | 12.0961 | 13910515 | 13.910515 | 0 | 13.910515 | لا | تحت التنفيذ | متقدم | شركة نبراس المتحدة للمقاولات | مجموعه العمرو للإستشارات الهندسية | جاري | 46993 | 0 | 0.36643233743409492 | 0.39103690685413006 | 0.41827768014059752 | 0.44463971880492092 | 0.47188049209138838 | 0.49824253075571179 | 0.52548330404217924 | 0.5527240773286467 | 0.57908611599297011 | 0.60632688927943756 | 0.63268892794376097 | 0.65992970123022843 | Null | 0 | 0 | 0 | 0 | 0.55000000000000004 | 2.34 | 3.75 | 7.89 | 13.47 | 18.920000000000002 | 20.84 | 28.73 | 31.53 | 37.21 | 50.03 | 56.66 | 56.66 | 64.92 | 64.92 | 0 | 0 | 0 | 0.78 | 1.69 | 3.07 | 5.53 | 8.4600000000000009 | 13.48 | 19.309999999999999 | 24.66 | 30.96 | 35.619999999999997 | 41.02 | 47.38 | 47.38 | 59.03 | 59.03 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | No | 30.96 | 31.53 | -0.57000000000000028 | Good Progress | 1.4100000000000001 | 4.1399999999999997 | 5.580000000000001 | 5.4500000000000011 | 1.9199999999999982 | 7.8900000000000006 | 2.8000000000000007 | 5.68 | 12.82 | 6.6299999999999955 | 0 | 8.2600000000000051 | 5.2150000000000007 | 0.63081161500000005 | 1138 | 0.44463971880492092 | 632 | 21.066666666666666 | 0.55536028119507908 | 0.43340000000000001 | 5242449.74 | 248850.46234177216 | 6028817.2010000004 | 286178.03169303801 | 6.8575949367088605E-4 | 2.0572784810126584E-2 | 9539.2677231012658 | 6.211499017681729E-3 | 0.12196028119507907 | المشاريع الاستراتيجية | إعادة جدولة الأعمال مع تمديد المشروع لمدة سنة | 339 | نعم | نعم | 9.0307063379999999 | 8.211377004500001 | -0.81932933349999892 | 1.0589 | No | 45592 | Out | 45545 | Out | 44 | 91 | No | 5.4755012666666669 | 5.0225697333333343 | 0 | 0 | 0 | 10.498071000000001 | 1615294.7104837224 | 2.3737620000000001 | 0.19624192921685504 | 0.37283165202666818 | 8.8439718804920964E-2 | 52.855000000000004 | -11.835000000000001 | R | -5.89 | Regular | R | المشاريع الاستراتيجية |